Munda Gold Project
Grade Control Drilling Program Completed
Mine Planning Progresses
Highlights
•
Final assays received for the recently completed grade control drilling program
at Munda Gold Project.
•
Final 10 holes drilled bringing total to 361 holes and 11,301m completed on 10m
x 10m pattern.
•
Latest assays include high-grade or broad intersections including:
MGCR0286
MGCR0287
MGCR0272
1m @ 12.03g/t and 3m @ 10.77g/t Au
7m @ 2.28g/t Au to bottom of hole
1m @ 15.57g/t Au to bottom of hole
•
Quotes received from contractors for mining, drilling and blasting.
•
Pit optimisations and mine design to proceed based on up-to-date costings and
an updated resource model.
Management Comment
Managing Director, Mark English, said: “The completion of the grade control drilling
program was an important undertaking by the Company. It has substantially
advanced our understanding of the Munda gold deposit and in particular the role
and distribution of high-grade zones in mining.
“The drilling program has provided guidance for mine planning, exactly what it was
designed to do. Our next task is to further refine the resource model and re-optimise
the model using recently obtained costings from reputable mining contractors and
the rising gold price. This will generate a revised starter pit design for mining in late
2024 or early 2025.
“We continue to progress the development of our main asset, with the focus on
getting Munda into production.” said Mr English.
page | 1
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to announce
that all assay results have now been received for the first phase of grade control
drilling at the Munda Gold Project, near Widgiemooltha, WA.
As reported on 30 January 20241, a total of 351 holes were drilled on a 10m x 10m
pattern with assays received at that time for 244 holes. An additional 10 holes have
since been drilled and assays have now been received for all 361 holes representing
a total of 11,301m.
Additional to the very high grade intercepts reported previously, the latest assay
results include further significant intercepts at a 0.5g/t Au cut-off (Appendix 1).
Several intercepts extend to the bottom of hole together with high-grade intervals
such as:
MGCR0286
MGCR0287
MGCR0272
MGCR0276
MGCR0181
MGCR0315
1m @ 12.03g/t and 3m @ 10.77g/t Au
7m @ 2.28g/t Au to bottom of hole
1m @ 15.57g/t Au to bottom of hole
3m @ 3.54g/t Au to bottom of hole
2m @ 6.60g/t Au
3m @ 3.60g/t Au
10m x10m Grade Control Program
The drill pattern covered a conceptual starter pit defined in a recent Scoping Study2
within a larger area of near surface mineralisation (Figure 1).
Drilling was undertaken by Kalgoorlie-based Total Drilling Services Pty Ltd (TDS). Most
holes were drilled vertically to depths of 30-35m, targeting either the 350m or 345m
reduced level (RL). Angled holes were drilled around the margin of the historic 1999
Resolute trial pit together with some in the trial pit. Shallower vertical holes were
drilled in the Resolute trial pit to reach the same elevations.
RC drill holes were sampled at 1m intervals and samples assayed for gold via a 50g
fire assay. Significant assays at a 0.5g/t cut-off are recorded in Appendix 1 and drill
hole details corresponding to the latest results in Appendix 2. A JORC checklist
describing sampling techniques and reporting criteria is shown in Appendix 5.
Whilst significant assay intervals at a 0.5g/t Au cut-off are widespread, there are
several zones of high-grade and/or broadly mineralised intervals, particularly below
and adjacent to the 1999 Resolute trial pit.
1 (ASX: AWJ) 30 January 2024: Grade Control Drilling Program Completed at Munda Gold Project
2 (ASX: AWJ) 28 June 2023: Positive Scoping Study for Munda Gold Project
page | 2
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
Figure 1. Munda optimised pit outline, first conceptual starter pit and existing trial pit with
completed 10 x 10m pattern drill holes and selected intercepts at a 0.5g/t cut-off.
Contract Mining Quotes
Four contract mining companies have provided budget pricing estimates for mining
and drill and blast services at Munda. These costings will contribute to detailed
assessment of mining to feasibility study level.
Other Work in Progress
Metallurgical samples representing a range of Munda lithologies and oxidation
profiles are currently being tested by ALS Metallurgy in Perth. Results and
interpretation should be completed in early April.
A preliminary geotechnical assessment for pit wall design is being undertaken by
Peter O’Bryan and Associates.
Waste rock characterisation work has largely been completed under the supervision
of MBS Environmental.
page | 3
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
Next Steps
New pit optimisations will now be undertaken utilising the up-to-date contract
mining costs, results from metallurgical testwork and a resource model that
incorporates the 10m x 10m drill data.
Optimised pits are expected to form the basis for detailed mine design and mine
scheduling.
Munda East RC Drilling
Results have been received for a 7-hole, 390m RC drilling program that tested
several drill targets approximately 1km to the east of the Munda gold deposit, within
the Munda mining lease, M15/87 (Figure 2). Four of the holes targeted anomalism
defined in RC holes drilled prior to 1995 and three targeted historic workings
including a substantial shaft.
Holes were drilled by Kalgoorlie-based Kennedy Drilling, inclined at 60 degrees to
the west or southwest, to depths of 30m or 60m. As with the grade control drilling,
samples were taken at 1m intervals and analysed using a 50g fire assay. Quality
control procedures, including routine insertion of field duplicates and commercially
supplied standards, was also consistent with the grade control drilling and are
described in more detail in Appendix 5, JORC Table 1 Checklist.
page | 4
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
Figure 2. Munda East RC Drill Hole Collar Locations
Significant assays at a 0.5g/t cut-off and drill hole details for the Munda East holes
are recorded in Appendices 3 and 4 respectively. The best result was a single metre
from surface in AMRC0058 which assayed at 15.02g/t. Whilst encouraging, the highgrade interval is isolated and has yet to be field checked.
A 15m zone of anomalism in the range of 0.1 to 0.2g/t Au was intersected beneath
historic workings in AMRC0060 with one assay at 0.5g/t cut-off in that interval of 1m
@ 1.57g/t from 31m.
page | 5
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
Compliance Statements
The information in this announcement that relates to exploration results is based on
and fairly represents information and supporting documentation compiled by Mr
John Utley, who is a full-time employee of Auric Mining Limited. Mr Utley is a
Competent Person and a member of the Australian Institute of Geoscientists. Mr
Utley has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Utley
consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
Information on the Scoping Study for Munda is extracted from the report Positive
Scoping Study for Munda Gold Project announced to the ASX on 28 June 2023 and
is available to view on the Company website; www.auricmining.com.au. The
Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement.
The company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market
announcements.
Forward-Looking Statement
This announcement contains forward-looking statements which are identified by
words such as ‘will’ ‘may’, ‘could’, ‘believes’, ‘estimates’, ‘targets’, ‘expected’, or
‘intends’ and other similar words that involve risks and uncertainties. These
statements are based on an assessment of present economic and operating
conditions, and on a number of assumptions regarding future events and actions
that, as at the date of this Announcement, are considered reasonable. Such
forward-looking statements are not a guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions and other important factors,
many of which are beyond the control of the Company, the Directors and the
management. The Directors cannot and do not give any assurance that the results,
performance or achievements expressed or implied by the forward-looking
statements contained in this Announcement will actually occur and investors are
cautioned not to place undue reliance on these forward-looking statements.
This announcement has been approved for release by the Board.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
+61 409 372 775
menglish@auricmining.com.au
Follow our communications
Subscribe: auricmining.com.au
page | 6
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
Appendix 1
Munda 10m x 10m Drilling
Significant Gold Intervals at 0.5g/t cut-off
Hole ID
MGCR0048
MGCR0089
MGCR0104
MGCR0121
MGCR0125
MGCR0125
MGCR0162
MGCR0166
MGCR0167
MGCR0167
MGCR0175
MGCR0178
MGCR0179
MGCR0181
MGCR0181
MGCR0181
MGCR0183
MGCR0193
MGCR0195
MGCR0196
MGCR0197
MGCR0197
MGCR0198
MGCR0200
MGCR0207
MGCR0210
MGCR0211
MGCR0211
MGCR0212
MGCR0212
MGCR0212
MGCR0213
MGCR0216
MGCR0226
MGCR0227
MGCR0229
MGCR0232
MGCR0232
MGCR0234
MGCR0235
MGCR0242
MGCR0242
MGCR0243
MGCR0244
From (m)
To (m)
Downhole
Interval (m)
Au (g/t)
34
41
40
37
15
25
31
7
9
27
18
15
2
7
22
28
5
0
17
14
15
23
20
26
9
7
14
22
17
23
26
23
26
17
26
19
7
24
4
23
16
21
19
24
35
42
42
39
16
27
32
12
11
28
21
16
3
10
24
30
7
6
18
15
17
24
21
27
10
9
16
26
18
24
28
24
27
18
27
20
10
25
9
25
17
22
21
25
1
1
2
2
1
2
1
5
2
1
3
1
1
3
2
2
2
6
1
1
2
1
1
1
1
2
2
4
1
1
2
1
1
1
1
1
3
1
5
2
1
1
2
1
0.58
0.74 !
1.17 !
4.17
0.71
0.58
0.63 !
1.37
1.08
0.58
0.97
0.67
0.85
0.72
1.37
6.60
1.13
1.42
1.07
1.15
1.41
0.78
0.81
0.70
0.78
1.33
1.95
0.54
1.72
2.97
2.12
1.12
0.75
1.35
0.89
0.51
0.56
0.67
0.99
3.45
0.56
0.57
0.86
1.41
page | 7
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
MGCR0251
MGCR0265
MGCR0265
MGCR0269
MGCR0271
MGCR0272
MGCR0272
MGCR0276
MGCR0276
MGCR0276
MGCR0286
MGCR0286
MGCR0286
incl
MGCR0287
MGCR0287
MGCR0290
MGCR0290
MGCR0290
MGCR0298
MGCR0301
MGCR0301
MGCR0302
MGCR0302
MGCR0302
MGCR0313
MGCR0315
MGCR0315
MGCR0326
MGCR0327
MGCR0327
MGCR0327
MGCR0343
MGCR0343
MGCR0344
MGCR0344
MGCR0345
MGCR0345
MGCR0354
MGCR0354
MGCR0355
MGCR0355
MGCR0364
MGCR0407
MGCR0409
MGCR0410
MGCR0410
MGCR0411
MGCR0412
MGCR0413
MGCR0413
Auric Mining Limited (ACN 635 470 843)
15
24
0
3
19
30
35
3
7
18
8
12
16
18
8
25
0
11
17
10
5
15
20
24
31
9
8
20
4
78
16
19
1
5
7
21
5
12
2
11
15
18
19
41
10
18
27
29
7
7
28
17
25
1
6
24
31
36
4
9
21
9
13
19
19
10
32
6
12
20
11
6
16
21
25
32
11
14
23
7
8
17
21
2
10
11
22
9
18
4
12
16
19
21
42
11
19
28
31
10
8
29
1
1
1
3
5
1
1
1
2
3
1
1
3
1
2
7
6
1
3
1
1
1
1
1
1
2
6
3
3
1
1
2
1
5
4
1
4
6
2
1
1
1
2
1
1
1
1
2
3
1
1
0.60
0.57
0.51
2.44
1.77
1.51
15.57 !
1.09
1.01
3.54 !
3.59
12.03
10.77
29.29
0.78
2.28 !
1.58
0.50
1.69
0.87
0.73
0.58
1.46
1.25
0.82 !
1.44
0.65
3.60
0.94
0.96
0.68
1.24
0.86
0.68
0.79
1.43
0.73
1.18
1.19
1.41
0.68
0.75
0.94
2.16 !
0.73
1.41
0.61
0.62
0.88
0.73
0.62
page | 8
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
! Mineralisation to bottom of hole
Appendix 2
Munda 10m x 10m Drilling
Drill Hole Details (Corresponding Latest Results)
Hole_ID
Type
MGCR0048*
MGCR0074*
MGCR0075*
MGCR0089*
MGCR0090*
MGCR0104
MGCR0121*
MGCR0125
MGCR0161
MGCR0162
MGCR0163
MGCR0164
MGCR0165
MGCR0166
MGCR0167
MGCR0175
MGCR0176
MGCR0177
MGCR0178
MGCR0179
MGCR0180
MGCR0181
MGCR0182
MGCR0183
MGCR0191
MGCR0192
MGCR0193
MGCR0194
MGCR0195
MGCR0196
MGCR0197
MGCR0198
MGCR0199
MGCR0200
MGCR0207
MGCR0208
MGCR0209
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Hole Depth (m) MGA_East
40
43
37
42
37
42
41
30
27
32
33
32
32
32
32
30
27
26
32
32
32
31
31
31
30
27
26
31
31
31
31
31
31
31
29
27
25
360354.92
360373.47
360373.29
360383.67
360383.65
360395.00
360404.27
360414.96
360434.78
360435.06
360435.03
360435.09
360434.96
360434.99
360434.94
360445.00
360445.13
360445.23
360444.96
360445.00
360445.08
360445.00
360444.94
360444.98
360454.99
360455.11
360454.95
360454.94
360455.00
360455.04
360455.00
360455.00
360454.97
360455.00
360465.00
360465.07
360465.10
MGA_North
Orig_RL
Dip
MGA_Azi
6513741.39
6513758.61
6513760.09
6513760.69
6513762.39
6513762.00
6513764.56
6513595.00
6513614.85
6513624.96
6513635.05
6513644.88
6513654.93
6513664.95
6513675.01
6513595.00
6513605.04
6513615.02
6513625.01
6513635.03
6513644.90
6513655.03
6513665.09
6513674.94
6513594.95
6513605.05
6513615.03
6513624.76
6513635.02
6513644.98
6513655.04
6513664.95
6513674.86
6513685.02
6513595.02
6513604.90
6513615.25
383.98
381.91
381.88
381.20
381.12
380.46
380.01
379.47
376.68
376.96
377.23
376.92
376.88
376.60
376.18
379.43
377.06
375.84
376.09
376.40
376.02
375.94
375.89
375.76
379.44
376.99
375.02
375.30
375.70
375.40
375.24
375.22
375.36
375.62
379.06
376.75
374.43
-60
-60
-90
-60
-90
-60
-60
-90
-60
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
180
180
360
180
360
180
180
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
page | 9
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
MGCR0210
MGCR0211
MGCR0212
MGCR0213
MGCR0214
MGCR0215
MGCR0216
MGCR0217
MGCR0223
MGCR0224
MGCR0225
MGCR0226
MGCR0227
MGCR0228
MGCR0229
MGCR0230
MGCR0231
MGCR0232
MGCR0233
MGCR0234
MGCR0235
MGCR0241
MGCR0242
MGCR0243
MGCR0244
MGCR0245
MGCR0246
MGCR0247
MGCR0248
MGCR0249
MGCR0250
MGCR0251
MGCR0252
MGCR0263
MGCR0264
MGCR0265
MGCR0266
MGCR0267
MGCR0268
MGCR0269
MGCR0270
MGCR0271
MGCR0272
MGCR0276
MGCR0282
MGCR0283
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Auric Mining Limited (ACN 635 470 843)
30
31
30
30
30
30
31
31
29
26
25
29
30
30
30
30
30
31
31
32
33
28
26
24
29
29
30
30
30
31
31
32
32
23
28
29
29
31
30
31
31
32
36
21
24
25
360465.00
360465.00
360465.01
360464.96
360464.91
360464.88
360465.00
360464.96
360474.99
360475.13
360475.13
360474.97
360475.00
360475.07
360475.00
360475.00
360475.09
360475.01
360474.93
360475.00
360474.97
360484.99
360485.00
360485.00
360485.03
360485.16
360484.85
360485.16
360484.82
360485.14
360485.04
360484.98
360484.86
360495.24
360495.16
360494.97
360495.06
360494.91
360494.47
360495.01
360495.10
360495.02
360495.02
360495.00
360504.93
360505.20
6513624.98
6513635.03
6513644.96
6513654.98
6513665.01
6513674.81
6513685.00
6513694.74
6513594.97
6513604.82
6513615.36
6513625.01
6513635.03
6513644.91
6513654.95
6513664.79
6513674.94
6513684.95
6513694.88
6513705.02
6513710.80
6513594.95
6513604.96
6513614.94
6513624.96
6513635.23
6513645.22
6513654.82
6513664.95
6513674.88
6513684.73
6513694.99
6513704.24
6513615.44
6513624.79
6513634.98
6513645.11
6513654.82
6513664.92
6513674.99
6513684.94
6513695.02
6513695.02
6513743.00
6513644.99
6513654.77
374.62
375.22
374.70
374.56
374.85
375.01
375.40
375.89
378.40
375.98
373.93
373.80
374.06
374.10
374.24
374.46
375.09
375.53
375.96
376.48
376.99
377.83
375.07
373.68
373.47
373.95
373.96
374.02
374.51
375.21
375.66
376.05
376.60
372.89
373.04
373.58
373.79
374.02
374.54
375.27
375.95
376.06
376.09
365.02
373.81
374.19
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-80
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-60
-90
-90
-90
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
page | 10
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
MGCR0284
MGCR0285
MGCR0286
MGCR0287
MGCR0290
MGCR0298
MGCR0299
MGCR0300
MGCR0301
MGCR0302
MGCR0312
MGCR0313
MGCR0314
MGCR0315
MGCR0325
MGCR0326
MGCR0327
MGCR0343
MGCR0344
MGCR0345
MGCR0354
MGCR0355
MGCR0364
MGCR0365
MGCR0407
MGCR0408
MGCR0409
MGCR0410
MGCR0411
MGCR0412*
MGCR0413*
MGCR0414*
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
RC
Auric Mining Limited (ACN 635 470 843)
26
31
32
32
21
25
25
26
32
32
26
26
27
28
26
27
27
26
27
33
27
27
32
33
31
42
33
33
33
33
33
33
360504.85
360504.87
360504.96
360504.96
360505.02
360515.00
360514.87
360514.95
360515.01
360514.95
360524.98
360524.98
360525.07
360525.03
360534.99
360534.96
360534.99
360544.96
360544.96
360545.00
360555.00
360554.99
360565.00
360564.72
360565.00
360565.04
360315.00
360315.00
360315.00
360344.97
360354.43
360364.53
6513664.72
6513674.73
6513685.02
6513691.00
6513724.97
6513645.00
6513654.86
6513664.82
6513675.04
6513685.01
6513654.91
6513664.99
6513675.33
6513680.99
6513654.85
6513665.00
6513675.01
6513655.00
6513664.99
6513672.00
6513655.02
6513665.02
6513655.04
6513663.91
6513730.00
6513740.32
6513650.00
6513660.00
6513670.00
6513590.59
6513590.53
6513590.42
374.96
375.87
376.19
376.24
364.91
374.04
374.53
375.17
376.20
376.66
374.91
375.60
376.54
376.80
375.26
376.07
376.65
375.74
376.71
376.85
376.38
376.86
376.79
377.03
380.45
379.83
382.95
383.45
383.79
382.28
382.33
382.45
-90
-90
-90
-80
-90
-90
-90
-90
-90
-90
-90
-90
-90
-80
-90
-90
-90
-90
-90
-80
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
-90
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
360
*Not listed in previous announcement
page | 11
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
Appendix 3
Munda East Drilling
Significant Gold Intervals at 0.5g/t cut-off
Hole ID
From (m)
AMRC0056
AMRC0057
AMRC0058
AMRC0059
AMRC0060
AMRC0060
AMRC0060
AMRC0061
AMRC0062
To (m)
Downhole
Interval (m)
0
1
1
5
9
31
6
10
32
1
1
1
Au (g/t)
NSA
NSA
15.02
NSA
0.63
0.56
1.57
NSA
NSA
Appendix 4
Munda East Drill Hole Details
Hole_ID
Type
AMRC0056
AMRC0057
AMRC0058
AMRC0059
AMRC0060
AMRC0061
AMRC0062
RC
RC
RC
RC
RC
RC
RC
Hole Depth (m) MGA_East
30
60
60
60
60
60
60
MGA_North
Orig_RL
Dip
MGA_Azi
361352
6513267
6513310
361367
6513310
361398
6513310
361430
6513560
361410
6513595
361360
6513795
-60
-60
-60
-60
-60
-60
-60
270
361336
350
350
350
350
350
350
350
270
270
270
245
245
245
page | 12
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
Appendix 5
Munda 10m x 10m and Munda East Drilling JORC Table 1
Checklist
Section 1 Sampling Techniques and Data
(Criteria in this section apply to all succeeding sections)
Criteria
JORC Code explanation
Commentary
Sampling
techniques
Nature and quality of sampling (e.g.
cut channels, random chips, or specific
specialised
industry
standard
measurement tools appropriate to the
minerals under investigation, such as
down hole gamma sondes, or
handheld XRF instruments, etc). These
examples should not be taken as
limiting the broad meaning of
sampling.
Include reference to measures taken
to ensure sample representivity and the
appropriate
calibration
of
any
measurement tools or systems used.
Aspects of the determination of
mineralisation that are Material to the
Public Report.
In cases where ‘industry standard’ work
has been done this would be relatively
simple (e.g. ‘reverse circulation drilling
was used to obtain 1 m samples from
which 3 kg was pulverised to produce
a 30 g charge for fire assay’). In other
cases more explanation may be
required, such as where there is coarse
gold that has inherent sampling
problems. Unusual commodities or
mineralisation types (e.g. submarine
nodules) may warrant disclosure of
detailed information.
• RC drill samples were taken at 1m intervals via a
cyclone and fixed cone splitter. Samples of
nominally 2.5kg were collected in calico bags
and submitted to the Intertek Genalysis sample
preparation facility in Kalgoorlie. Samples were
pulverised to a nominal 85% passing 75µm.
Approximately 200g of the pulverised product
from each sample was then transferred to the
Intertek Genalysis facility in Perth.
• Samples were analysed for Au via 50g fire assay
with an ICP-OES determination of gold
concentration.
• The samples for each 1m interval remaining
after removal of the nominal 1.5kg split were laid
out in rows at the drill site and this material used
for geological logging
Drilling
techniques
Drill type (e.g. core, reverse circulation,
open-hole hammer, rotary air blast,
auger, Bangka, sonic, etc) and details
(e.g. core diameter, triple or standard
tube, depth of diamond tails, facesampling bit or other type, whether
core is oriented and if so, by what
method, etc).
• RC drilling using a face-sampling hammer with
a drill bit (hole) diameter of approximately
133mm.
Drill sample
recovery
Method of recording and assessing
core and chip sample recoveries and
results assessed.
Measures taken to maximize sample
recovery and ensure representative
nature of the samples.
• Sample recovery is assessed as having been
reasonable overall. Samples submitted for assay
were weighed at the lab and sample weights
reported – they show some small samples in the
1st few metres of drill holes and average weights
of 2.2kg (Grade Control) and 2.4kg (Munda
East).
page | 13
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Criteria
Auric Mining Limited (ACN 635 470 843)
JORC Code explanation
Commentary
Whether a relationship exists between
sample recovery and grade and
whether sample bias may have
occurred due to preferential loss/gain
of fine/coarse material.
• There is no evidence of sample bias
Logging
Whether core and chip samples have
been geologically and geotechnically
logged to a level of detail to support
appropriate
Mineral
Resource
estimation,
mining
studies
and
metallurgical studies.
Whether logging is qualitative or
quantitative in nature. Core (or
costean, channel, etc) photography.
The total length and percentage of the
relevant intersections logged.
Subsampling
techniques
and sample
preparation
If core, whether cut or sawn and
whether quarter, half or all core taken.
If non-core, whether riffled, tube
sampled, rotary split, etc and whether
sampled wet or dry.
For all sample types, the nature, quality
and appropriateness of the sample
preparation technique.
Quality control procedures adopted
for all sub-sampling stages to maximise
representivity of samples.
Measures taken to ensure that the
sampling is representative of the in-situ
material collected, including for
instance
results
for
field
duplicate/second-half sampling.
Whether sample sizes are appropriate
to the grain size of the material being
sampled.
• Drill chips were logged at 1m intervals
corresponding to the sample intervals and
according to Auric’s coding system in sufficient
detail to support mineral resource estimation,
mining studies and metallurgical studies.
• The logging is qualitative in nature.
• Chips were not photographed but a small
proportion of chips from each interval have
been retained in compartmentalised chip trays.
• The total length logged is 11,301m for the grade
control and 390m for the Munda East drilling
which is 100% of the drilled intervals
• RC chips were sampled at 1m intervals via a
fixed cone splitter and samples were dry.
• A duplicate sample was taken with every 15th
sample using a 2nd chute on the splitter and a
pulp standard was inserted after every 30
samples such that 10% of samples submitted for
assay are either duplicates or standards.
• The duplicate assays show good correlation with
original assays (Grade Control; r2= 0.98 Munda
East r2 = 0.90).
• Sample sizes (nominally 2.5kg) were pulverised
prior to subsampling of 50g for fire assay and are
considered appropriate.
Quality of
assay data
and
laboratory
tests
The
nature,
quality
and
appropriateness of the assaying and
laboratory procedures used and
whether the technique is considered
partial or total.
For geophysical tools, spectrometers,
handheld XRF instruments, etc, the
parameters used in determining the
analysis including instrument make and
model, reading times, calibrations
factors applied and their derivation,
etc.
Nature of quality control procedures
adopted (e.g. standards, blanks,
duplicates, external laboratory checks)
and whether acceptable levels of
accuracy (ie lack of bias) and
precision have been established.
• In addition to standards submitted by Auric, the
laboratory
(Intertek
Genalysis)
analysed
standards and blanks inserted with each fire
assay batch. Comparison of expected results for
standards with the assays received for the RC
samples indicates accurate and precise
laboratory data.
page | 14
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 3 April 2024
Auric Mining Limited (ACN 635 470 843)
Criteria
JORC Code explanation
Commentary
Verificatio
n of
sampling
and
assaying
The
verification
of
significant
intersections by either independent or
alternative company personnel.
The use of twinned holes.
Documentation of primary data, data
entry procedures, data verification,
data storage (physical and electronic)
protocols.
Discuss any adjustment to assay data.
• Anomalous assays have been verified by
alternative Auric personnel.
• No twinned holes have been drilled.
• Field sample records are merged with assay
results from the lab and various cross reference
checks, both manual and computational used
to ensure data integrity.
• Data is stored on two separate computers and
backed up routinely.
• No adjustment has been made to assay data
Location of
data points
Accuracy and quality of surveys used
to locate drill holes (collar and downhole surveys), trenches, mine workings
and other locations used in Mineral
Resource estimation.
Specification of the grid system used.
Quality and adequacy of topographic
control.
• Hole collar positions for the 10m x 10m grade
control were marked out by a qualified surveyor
using a DGPS and located again following
completion by the same surveyor.
• Hole collar positions for the Munda East drilling
were marked out using a hand=held GPS and
are considered to be within 5m of planned
positions
• Angled holes and a small proportion of vertical
holes were surveyed downhole using a northseeking gyroscope.
• Collar surveys for the grade control holes
included an elevation measurement and are
located within the MGA-GDA94 grid system,
Zone 51. The elevation used for the Munda East
holes is an estimate only.
Data
spacing
and
distribution
Data spacing for reporting of
Exploration Results.
Whether the data spacing and
distribution is sufficient to establish the
degree of geological and grade
continuity appropriate for the Mineral
Resource and Ore Reserve estimation
procedure(s)
and
classifications
applied.
Whether sample compositing has been
applied.
10m x 10m Grade Control Pattern
• 361 holes were drilled on a 10m x 10m pattern to
a vertical depth of up to 54m, averaging 31m.
• The data spacing is sufficient to estimate
mineral resources but will require greater density
for ore definition should open pit mining be
undertaken.
• No sample compositing.
Munda East RC Drilling
• 7 holes were drilled to target mineralisation
intercepted in pre-1995 drill holes or in historic
workings. The drill density and spacings
represent early stage exploration and are not
sufficient for resource estimation.
• No sample compositing.
Orientation
of data in
relation to
geological
structure
Whether the orientation of sampling
achieves
unbiased
sampling
of
possible structures and the extent to
which this is known, considering the
deposit type.
If the relationship between the drilling
orientation and the orientation of key
mineralised structures is considered to
have introduced a sampling bias, this
10m x 10m Grade Control Drilling
• There are several structural controls and the drill
holes will
Share your feedback
Discover