Starter Pit Ore Reserve for Munda Gold Deposit-Clarification
Released
Released
Announcement PDF
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Clarification Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) refers to the announcement
on 10 December 2024 entitled “Starter Pit Ore Reserve for Munda Gold Deposit” (the
“Announcement”). In discussions with the Company subsequent to the release of
the Announcement, the Australian Securities Exchange (“ASX”) have requested the
below changes:
•
•
Inclusion of the location details and assay results for the ore reserve estimate.
JORC table 1 Section 1, 2 and 3 for the ore reserve estimate.
As a result, the Company has updated the announcement to include the above.
To avoid any potential
announcement.
confusion,
the
Company
attaches
the
revised
Approved for release by the Board of Auric Mining Limited.
Catherine Yeo
Company Secretary
Auric Mining Limited
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Munda Gold Deposit
Starter Pit Ore Reserve
Highlights
•
Munda Starter Pit defined for next stage in Munda Mine Development.
•
Starter Pit Reserve of 7,400 contained ounces calculated using a gold price of
AUD$3,500 per ounce.
•
Mine planning for a total of 125kt @ 1.8g/t from the Starter Pit.
•
Financial model defines Undiscounted Cashflow of $5.3M at All in Sustaining Cost
of $2,635 per ounce.
•
5 months mine life assumed, including toll treatment.
Management Comment
Mr. Mark English, Managing Director:
“This work is another key part of the process in mining Munda. We have a lot of
confidence in our approach and the key inputs that have been used. The starter pit
is designed to provide a better understanding of the deposit before aiming to go
into full production in 2026”
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to announce an
Ore Reserve for a Starter Pit at Munda. The Ore Reserve is defined by a Pre-Feasibility
Study (PFS) utilising recent 10m x 10m spaced (i.e. high-density) drilling and
corresponding Indicated Resources.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
The Ore Reserve for a starter pit at Munda represents the first step in potentially
staged mining at Munda. The Ore Reserve representative of the Starter Pit mining
plan for the Munda gold deposit is estimated as shown in Table 1.
Table 1. Munda Trial Pit Probable Ore Reserve
Proved
Probable
Tonnage
(t)
0
Grade
(g/t)
0.0
Ounces
(oz)
0
Tonnage
(t)
125,000
Total
Grade
(g/t)
1.8
Ounces
(oz)
7,400
Tonnage Grade Ounces
(t)
(g/t)
(oz)
125,000
1.8
7,400
Note – Rounding errors may occur
The 125,000t of ore at a grade of 1.8g/t Au defined within the Starter Pit is comprised
entirely of Indicated Resources and is mined in conjunction with 339,000BCM of
waste rock, representing a stripping ratio of 7.6:1.
The Ore Reserve was estimated based upon extraction using owner operated
conventional open pit mining and off-site milling at a Third Party owned and
operated ore processing facility under a toll treatment arrangement. The Ore
Reserve is inclusive of modifying factors for mining dilution and mining recovery.
Contemporary in-house mining, processing and site costs have been utilised.
Key parameters defined by the Starter Pit PFS are set out in Table 2 below:
Table 2. Munda Starter Pit Pre-Feasibility
Parameter
Unit
General
Start Date
Quarter
Project Life (mining)
Months
Project Life (milling)
Months
Mining
Ore Tonnes
Kt
Grade
g/t
Contained Gold
Koz
Processing
Ore Processed
Kt
Grade
g/t
Recovery (average)
%
Gold Production
Koz
Financial
Gold Price Assumption
A$/oz
Upfront Project Capital Cost
A$M
AISC
A$/oz
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
Pre-Feasibility Study November 2024
March 2025
5.0
5.0
125
1.8
7.3
125
1.8
83
6.1
3,500
6.5
2,635
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
The financial model developed for the owner operated mining and ore processing
of the Munda Starter pit demonstrates that at a gold price of A$3,500/oz, the project
generates revenue of $21.4M and an Undiscounted Cash Flow of $5.3M at a $2,635
All in Cost Per Ounce (Table 3).
Table 3. Munda Trial Pit Pre-Feasibility Cost and Revenue Summary
Generated
Revenue
$M
21.4
Operating
Costs
$M
15.2
Capital/Startup
Costs
$M
0.65
Total
Royalties
$M
0.3
Undiscounted
Cash Flow
$M
5.3
All in Cost
Per Ounce
A$
2,635
Figure 1. Munda Starter Pit site layout.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Material Assumptions and Outcomes from the Pre-Feasibility Study
The Ore Reserve has been determined using the November 2024 Mineral Resource
Estimate1 It was assumed that Auric would mine the ore and that processing would
be offsite at a third-party owned and operated processing plant located 95km from
Munda, under the terms of a toll treatment agreement.
The Pre-Feasibility Study (PFS) indicates that the Munda Starter Pit is economically
viable with an Undiscounted Cash Flow of $5.3M generated over 5 months.
The following sections further describe the material assumptions contributing to the
PFS. More detail on the material assumptions is included in Section 4 of the JORC
Table 1 Checklist in Appendix B.
Ore Reserve Classification
The Ore Reserve has been determined using the November 2024 Mineral Resource
Estimate. This Mineral Resource Estimate was deemed to be a recoverable resource.
Therefore, no additional allowances are required for mining dilution and mining
recovery.
Probable Ore Reserves have been derived from Indicated Mineral Resources and
constrained to the higher density (ie, 10m x 10m spaced) drilling portion of the
Mineral Resource Estimate. A ‘goodbye-cut’ at the base of the design pit is derived
from Indicated Resource which in turn is derived from 20m x 20m spaced drilling.
Details for all drill holes used in the modelling and estimation of resources, including
the higher density drilling, are provided in Appendix A. The details include significant
intercepts at 0.5g/t gold cut-off.
The crest of the Starter Pit relative to drill hole distribution is shown in Figure 2. Cross
sections showing drill hole distribution and estimated panel grades for the resource
model at 0.85g/t cut-off relative to the Starter Pit design are shown in Figures 3 and
4.
1 (ASX:AWJ)10 December 2024. Munda Gold Deposit. Updated Mineral Resources. Precursor to
Starter Pit Mining Development.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Figure 2. Munda drilling relative to resource pit crest and to the Starter Pit crest with
resource drill holes referenced by exploration company and hole type.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Figure 3. Cross section 360370mE – Showing drill hole grade ranges and estimated
panel grades relative to Starter Pit design. Panels scaled by proportion above 0.85
g/t cut off and coloured by the grade above that cut-off.
Figure 4. Cross section 360390mE – Showing drill hole grade ranges and estimated
panel grades relative to Starter Pit design. Panels scaled by proportion above 0.85
g/t cut off and coloured by the grade above that cut-off.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Mining Method and Assumptions
Mining by conventional drill and blast and load and haul open pit mining method is
considered the most suitable mining method. It was assumed that the mining fleet
will be dry-hired owner-operated and comprised of an articulated dump truck fleet
together with an 80-120t excavator and matching ancillary equipment. RC grade
control and drill and blast will be conducted by contractors.
Pit Design Parameters
The design parameters used for the Starter Pit are based on an independent
geotechnical assessment and are as follows:
Table 3. Munda Starter Pit Design Parameters
Level
North, East and West Walls
South Wall
N/S → 370mRL
50 degrees
55 degrees
370mRL Berm
5m wide
5m wide
370mRL → 360mRL
55 degrees
60 degrees
360mRL Berm
Nil
5m wide
360mRL → 350mRL
55 degrees
60 degrees
350mRL Berm
5m wide
5m wide
350mRL → 330mRL
65 degrees
65 degrees
Goodbye Cut
To 325mRL
Gradient
1 in 8
N/S → 370mRL
15m Wide (minimum)
Ramp
370mRL → 330mRL
8m Wide (minimum)
Switchback Diameter – 20m
Processing Method and Assumptions
Processing will be conducted off-site at a toll treatment plant that utilises
conventional CIL methods for gold extraction. Haulage costs reflect processing at a
plant 95km from Munda.
Metallurgical recovery factors of 88% for oxide and transitional material and 80% for
fresh material are utilised. These recoveries are based on recent test work and
exclude earlier testwork showing intervals of higher recovery in fresh rock. The
average recovery used is 83.3%.
Cut-off Grades
Break-even (or cut-off) grades are those grades at which ore can be processed
profitably. This was calculated as part of the evaluation of the optimal pit shells.
The costs and factors used to calculate the processed ore/waste cut-off grades
were:
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
•
•
•
•
12 DECEMBER 2024
Gold price
Royalties
Costs comprising of Ore/Waste Differential, Grade Control, Ore Haulage, Ore
Processing and Administration
Processing Recovery
At a $3,500 per ounce gold price, the break-even grades are 0.78g/t Au for oxide
and transitional material and 0.84g/t Au for fresh material.
Royalties
The Western Australian state gold royalty of 2.5% has been incorporated into the
optimisation process and subsequent optimum and pit design evaluations.
Estimation Methodology
The Probable Ore Reserves are reported within a detailed pit design and are
inclusive of mining dilution/ore loss, mining, haulage and processing costs,
metallurgical recoveries and the state royalty.
The operating costs used for the optimisation analysis and subsequent optimum shell
and pit mine design evaluations were either supplied by Auric or by Minecomp Pty
Ltd and are either based upon contemporary in-house knowledge or extracted
from Minecomp’s extensive operating cost database.
All inputs from mining operations, transportation, processing and sustaining capital
as well as contingencies have been scheduled on a monthly basis and evaluated
to generate a full life of mine cost model.
Tenure and Permitting Status
The Munda Starter Pit Ore Reserve is located within granted mining lease M15/87
with site access from the Coolgardie – Esperance Highway via an approved
miscellaneous licence, L15/414. Permit applications for water extraction and for
Native Vegetation Clearing have been submitted. Other environmental permit
applications are still to be submitted. The Munda Starter Pit will overlap an existing
pit within a current mining lease and it is reasonable to assume that all approvals
required to mine will be received.
Infrastructure Requirements
The Munda Starter Pit Ore Reserves plan will require installation of site infrastructure.
There is suitable terrain within the granted mining lease and miscellaneous licence
for the installation of all required infrastructure including a haul road extension,
waste dump, ROM pads, site office, workshop and site roads. Water will be available
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
for dust suppression from the historic 132 North pit under the terms of an agreement
with WIN Metals Ltd2.
Capital and Start-up Cost Information
Capital and start-up cost requirements for the mining of the Munda Starter Pit
include, but may not be limited to mobilisation, site office and ablutions,
maintenance workshop and laydown area, establishment of services, clearing and
grubbing and stockpiling of topsoil, haul road extension (2.7km) and demobilisation.
These costs have been estimated at $650,000 and have been included in the
optimum shell and pit design evaluations.
Mining Schedule and Working Capital Requirements
To estimate the working capital requirements for the Munda Starter Pit, a mining
schedule and cash flow model were developed.
The mining schedule is represented in Figure 5 and cash flow analysis in Figure 6.
Cash-flow analysis of the proposed mining schedule indicates a maximum cash
draw-down of $4.86M. Incorporating a 35% contingency results in the working
capital required to fund the Munda Starter Pit being $6.5M.
Any delay to the treatment of ore via toll milling leads to a requirement for working
capital to fund all mining costs but for haulage and processing costs to be funded
from gold sales. In that scenario, the working capital required is $6.2M and with a
35% contingency, $8.3M.
Figure 5. Munda Starter Pit – Production Schedule Tonnages.
2 (ASX:AWJ) 23 July 2024. Munda Gold Project. Auric Buys Specific Mineral Rights and related assets from WIN
Metals for $1.2M.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Figure 6. Munda Starter Pit – Monthly Cost/Cash-flow Analysis.
Sensitivity Analysis
Sensitivity of the Munda Starter Pit operating profit to changes in gold price, mining
costs, ore haulage costs, ore processing costs and total costs are represented
graphically in Figure 7.
Figure 7. Munda Starter Pit – Operating Profit Sensitivities.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
The Munda Starter Pit operating profit is most sensitive to gold price, followed by
total costs.
COMPLIANCE STATEMENTS
The Information in this Report that relates to Ore Reserves is based on information
compiled by Mr Gary McCrae, a Competent Person who is a Member of the
Australasian Institute of Mining and Metallurgy. Mr McCrae is a full-time employee
of Minecomp Pty Ltd. Mr McCrae has sufficient experience that is relevant to the
style of mineralisation and type of deposit under consideration and to the activity
being undertaken to qualify as a Competent Person as defined in the 2012 Edition
of the “Australasian Code for Reporting of Exploration Results, Mineral Resources
and Ore Reserves”. Mr McCrae consents to the inclusion in the report of the matters
based on his information in the form and context in which it appears.
The information in this announcement that relates to exploration results is based on
and fairly represents information and supporting documentation compiled by Mr
John Utley, who is a full-time employee of Auric Mining Limited. Mr Utley is a
Competent Person and a member of the Australian Institute of Geoscientists. Mr
Utley has sufficient experience that is relevant to the style of mineralisation and type
of deposit under consideration and to the activity being undertaken to qualify as a
Competent Person as defined in the 2012 Edition of the ‘Australasian Code for
Reporting of Exploration Results, Mineral Resources and Ore Reserves’. Mr Utley
consents to the inclusion in the report of the matters based on his information in the
form and context in which it appears.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
FORWARD LOOKING STATEMENTS
This Announcement may contain forward-looking statements which are identified
by words such as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’,
‘expecting’, or ‘intends’ and other similar words that involve risks and uncertainties.
These statements are based on an assessment of present economic and operating
conditions, and on a number of assumptions regarding future events and actions
that, as at the date of this Announcement, are considered reasonable. Such
forward-looking statements are not a guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions, and other important factors,
many of which are beyond the control of the Company, the Directors, and the
management. The Directors cannot and do not give any assurance that the results,
performance, or achievements expressed or implied by the forward-looking
statements contained in this Announcement will actually occur and investors are
cautioned not to place undue reliance on these forward-looking statements.
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Investor Relations
Mark English
Managing Director
Auric Mining Limited
Alex Cowie
Director
NWR Communications
T +61 409 372 775
E menglish@auricmining.com.au
T +61 412 952 610
E alexc@nwrcommunications.com.au
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
Follow our
communications
Click here to
subscribe to our
updates
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Appendix A
Resource Model Drill Hole Coordinates and Significant
Intercepts at 0.5g/t Cut Off¹
Hole
AMRC001
Collar coordinate (GDA 94)
Hole
East
North
RL
Depth (m)
360,560
6,513,840
376
162
Company
Auric
Hole
Orientation
Intercept³
Type²
Az./Incl.
Down hole gold grade
RC
182/-60
5m @ 0.6 g/t from 103 m
AMRC001
7m @ 1.89 g/t from 132 m
AMRC002
360,560
6,513,880
373
180
Auric
RC
182/-60
3m @ 0.57 g/t from 166 m
AMRC003
360,340
6,513,800
382
174
Auric
RC
185/-60
7m @ 1.66 g/t from 98 m
AMRC003
9m @ 7.43 g/t from 105 m
AMRC004
360,300
6,513,800
385
156
Auric
RC
181/-60
5m @ 0.54 g/t from 119 m
AMRC005
360,253
6,513,750
395
162
Auric
RC
182/-60
9m @ 1.99 g/t from 86 m
AMRC006
360,180
6,513,688
391
174
Auric
RC
181/-59
3m @ 0.64 g/t from 91 m
AMRC006
3m @ 0.57 g/t from 113 m
AMRC007
360,199
6,513,699
390
168
Auric
RC
180/-62
4m @ 0.55 g/t from 96 m
AMRC008
360,241
6,513,699
387
166
Auric
RC
180/-60
4m @ 0.56 g/t from 106 m
AMRC009
360,335
6,513,635
382
120
Auric
RC
181/-59
3m @ 0.54 g/t from 97 m
AMRC009
4m @ 0.52 g/t from 109 m
AMRC010
360,120
6,513,518
376
102
Auric
RC
183/-61
NSI
AMRC011
360,120
6,513,561
382
120
Auric
RC
179/-59
6m @ 0.62 g/t from 28 m
AMRC012
360,119
6,513,609
386
162
Auric
RC
180/-59
4m @ 0.51 g/t from 47 m
AMRC012
18m @ 10.61 g/t from 58 m
AMRC012
5m @ 0.59 g/t from 76 m
AMRC013
360,646
6,513,797
384
228
Auric
RC
182/-61
AMRC013
AMRC014
3m @ 0.61 g/t from 148 m
5m @ 0.51 g/t from 215 m
360,624
6,513,770
380
198
Auric
RC
183/-60
22m @ 3.03 g/t from 85 m
AMRC014
12m @ 1.52 g/t from 107 m
AMRC014
12m @ 0.67 g/t from 180 m
AMRC014
3m @ 0.58 g/t from 194 m
AMRC015
360,799
6,513,639
365
168
Auric
RC
182/-61
AMRC015
AMRC016
5m @ 1.85 g/t from 91 m
10m @ 1.71 g/t from 155 m
360,682
6,513,746
372
186
Auric
RC
186/-61
AMRC016
4m @ 0.58 g/t from 139 m
5m @ 0.59 g/t from 145 m
AMRC017
360,679
6,513,639
377
78
Auric
RC
180/-60
7m @ 0.84 g/t from 18 m
AMRC018
360,680
6,513,680
380
108
Auric
RC
182/-60
NSI
AMRC019
360,661
6,513,674
380
42
Auric
RC
183/-61
3m @ 0.62 g/t from 20 m
AMRC020
360,920
6,513,820
359
84
Auric
RC
273/-59
11m @ 1 g/t from 37 m
AMRC020
6m @ 0.78 g/t from 66 m
AMRC021
360,959
6,513,820
357
84
Auric
RC
272/-60
5m @ 0.52 g/t from 68 m
AMRC022
360,999
6,513,820
357
90
Auric
RC
272/-60
NSI
AMRC023
360,820
6,513,315
363
96
Auric
RC
183/-60
9m @ 0.85 g/t from 28 m
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
AMRC024
360,799
6,513,349
366
114
Auric
RC
184/-59
4m @ 3.45 g/t from 47 m
AMRC025
360,798
6,513,540
365
120
Auric
RC
182/-61
NSI
AMRC026
360,875
6,513,545
361
102
Auric
RC
180/-58
6m @ 0.53 g/t from 36 m
AMRC027
361,221
6,514,050
373
120
Auric
RC
274/-60
NSI
AMRC028
360,867
6,513,868
362
100
Auric
RC
274/-59
NSI
AMRC029
360,918
6,513,869
359
100
Auric
RC
272/-60
5m @ 0.55 g/t from 40 m
AMRC029
AMRC030
3m @ 0.51 g/t from 67 m
360,965
6,513,869
357
100
Auric
RC
269/-60
3m @ 0.53 g/t from 79 m
AMRC030
8m @ 0.93 g/t from 84 m
AMRC030
5m @ 0.53 g/t from 95 m
AMRC031
360,843
6,513,821
363
114
Auric
RC
271/-59
NSI
AMRC032
360,895
6,513,820
360
100
Auric
RC
273/-60
24m @ 0.7 g/t from 1 m
AMRC032
AMRC033
3m @ 0.53 g/t from 47 m
360,939
6,513,820
358
84
Auric
RC
271/-60
AMRC033
AMRC034
3m @ 0.52 g/t from 56 m
5m @ 0.5 g/t from 61 m
360,858
6,513,821
362
84
Auric
RC
090/-60
6m @ 0.76 g/t from 30 m
AMRC034
6m @ 0.72 g/t from 41 m
AMRC034
3m @ 0.51 g/t from 69 m
AMRC035
360,867
6,513,769
362
100
Auric
RC
269/-60
10m @ 0.5 g/t from 10 m
AMRC036
360,920
6,513,769
360
100
Auric
RC
271/-60
NSI
AMRC037
360,966
6,513,768
357
100
Auric
RC
269/-60
NSI
AMRC038
360,446
6,513,834
376
42
Auric
RC
182/-60
3m @ 0.55 g/t from 9 m
AMRC039
360,407
6,513,851
378
42
Auric
RC
182/-72
8m @ 0.55 g/t from 12 m
AMRC040
360,406
6,513,868
378
42
Auric
RC
179/-72
NSI
AMRC041
360,323
6,513,787
384
140
Auric
RC
181/-60
8m @ 3.02 g/t from 99 m
AMRC042
360,250
6,513,771
395
210
Auric
RC
177/-60
7m @ 0.81 g/t from 128 m
AMRC042
AMRC043
8m @ 0.58 g/t from 135 m
360,274
6,513,751
392
150
Auric
RC
183/-59
3m @ 0.52 g/t from 100 m
AMRC043
23m @ 1.11 g/t from 103 m
AMRC043
3m @ 0.53 g/t from 128 m
AMRC043
6m @ 0.57 g/t from 134 m
AMRC044
360,226
6,513,697
387
126
Auric
RC
183/-60
360,198
6,513,625
386
100
Auric
RC
182/-60
AMRC044
AMRC045
6m @ 0.52 g/t from 106 m
AMRC045
AMRC046
6m @ 0.51 g/t from 96 m
17m @ 0.78 g/t from 32 m
7m @ 0.81 g/t from 53 m
360,198
6,513,651
387
120
Auric
RC
184/-60
AMRC046
4m @ 0.85 g/t from 59 m
7m @ 0.65 g/t from 67 m
AMRC047
360,097
6,513,598
390
100
Auric
RC
186/-59
9m @ 0.78 g/t from 53 m
AMRC048
360,098
6,513,623
390
120
Auric
RC
190/-59
6m @ 0.61 g/t from 52 m
AMRC048
AMRC049
3m @ 0.61 g/t from 78 m
360,121
6,513,637
388
138
Auric
RC
184/-60
AMRC049
AMRC050
8m @ 0.73 g/t from 74 m
360,120
6,513,585
384
120
Auric
RC
185/-58
AMRC050
AMRC051
12m @ 0.56 g/t from 48 m
9m @ 1.61 g/t from 44 m
7m @ 0.54 g/t from 54 m
360,174
Auric Mining Limited
ACN 635 470 843
6,513,598
385
138
Auric
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
RC
188/-60
3m @ 0.53 g/t from 25 m
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
AMRC051
10m @ 2.59 g/t from 28 m
AMRC051
6m @ 0.8 g/t from 48 m
AMRC052
360,223
6,513,720
390
150
Auric
RC
190/-60
3m @ 0.6 g/t from 137 m
AMRC053
360,248
6,513,723
391
150
Auric
RC
184/-60
8m @ 0.64 g/t from 97 m
AMRC053
AMRC054
3m @ 0.6 g/t from 125 m
360,410
6,513,767
380
96
Auric
RC
225/-89
AMRC054
AMRC055
10m @ 0.61 g/t from 47 m
11m @ 0.97 g/t from 75 m
360,596
6,513,787
381
150
Auric
RC
182/-60
DDM1
360,673
6,513,898
371
207.72
Anaconda
DD
208/-60
NSI
DDM10
360,436
6,513,836
377
135.09
Anaconda
DD
000/-90
NSI
DDM11
360,566
6,513,959
369
204.95
Anaconda
DD
207/-60
NSI
DDM13
360,510
6,514,012
367
258.17
Anaconda
DD
195/-60
NSI
DDM15
360,638
6,513,971
368
259.99
Anaconda
DD
207/-60
NSI
DDM16
360,701
6,513,960
366
259.9
Anaconda
DD
197/-60
NSI
DDM17
360,701
6,514,242
365
69.46
Anaconda
DD
182/-60
NSI
DDM17A
360,681
6,514,212
365
463.6
Anaconda
DD
187/-62
NSI
DDM2
360,446
6,513,946
372
201.72
Anaconda
DD
180/-60
NSI
DDM3
360,743
6,513,703
371
112.78
Anaconda
DD
270/-80
NSI
DDM5
360,608
6,513,926
372
210.98
Anaconda
DD
207/-60
NSI
DDM6
360,738
6,513,899
368
231.65
Anaconda
DD
208/-57
NSI
DDM8
360,551
6,513,806
378
130.45
Anaconda
DD
240/-86
NSI
DDM9
360,504
6,513,825
379
132.1
Anaconda
DD
001/-90
3.1m @ 0.56 g/t from 110.74 m
AMRC055
4m @ 0.59 g/t from 40 m
3m @ 0.54 g/t from 133 m
DDM9
3.7m @ 0.52 g/t from 114.27 m
DEM1
360,865
6,513,706
365
162.15
WMC
DD
270/-50
NSI
EMD001
360,428
6,513,798
379
150.1
Estrella
DD
066/-65
6m @ 3.14 g/t from 74 m
EMD001
14m @ 2.48 g/t from 80 m
EMD001
23m @ 1.81 g/t from 124 m
EMD001
3.1m @ 0.62 g/t from 147 m
EMD002
360,427
6,513,799
379
171.2
Estrella
DD
088/-59
11m @ 2.43 g/t from 57 m
EMD002
31m @ 11.72 g/t from 102 m
EMD002
12m @ 1.78 g/t from 133 m
MD1
359,750
6,513,770
399
32.31
WMC
DD
180/-45
NSI
MEDD025
360,597
6,514,053
365
378.5
RC/DD
181/-74
NSI
MEDD026
360,428
6,514,140
366
290
RC
179/-71
NSI
MEDD027
360,397
6,514,220
368
447.6
RC/DD
174/-70
NSI
MEDD028
360,347
6,514,223
369
541
RC/DD
178/-80
NSI
MEDD029
360,347
6,514,221
369
465.8
RC/DD
180/-73
NSI
MEDD030
360,347
6,514,218
369
430
RC/DD
179/-64
NSI
MERC160
360,339
6,513,890
377
184
RC
180/-63
NSI
MERC161
360,339
6,513,890
377
155
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
RC
180/-62
NSI
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
MERC162
360,339
6,513,932
373
170
MERC163
360,478
6,513,798
379
66
MERC164
360,520
6,513,775
380
66
MERC165
360,456
6,513,799
379
78
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
12 DECEMBER 2024
RC
180/-66
NSI
RC
180/-60
NSI
RC
180/-60
NSI
RC
180/-50
3m @ 0.57 g/t from 32 m
MERC165
6m @ 4.83 g/t from 36 m
MERC165
9m @ 1.23 g/t from 62 m
MERC166
360,323
6,513,713
386
80
MERC167
360,428
6,514,018
369
277
MERC168
360,428
6,514,015
369
270
MERC169
360,401
6,513,997
369
234
MERC170
360,479
6,513,961
370
240
MERC171
360,508
6,513,963
369
240
MERC172
360,509
6,514,069
366
318.9
MERC173
360,510
6,514,065
366
295
MERC174
360,478
6,514,107
366
366.9
MERC175
360,478
6,514,105
366
355
MERC176
360,478
6,514,104
366
315.9
MERC177
360,382
6,514,206
368
391.1
MERC178
360,380
6,514,208
368
457.4
MERC179
360,339
6,514,095
368
306.4
MERC180
360,318
6,514,173
367
414.9
MERC181
360,318
6,514,171
367
220
MERC182
360,317
6,514,169
367
220
MERC259
360,903
6,513,623
360
332
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
Widgie
Nickel
RC
180/-60
8m @ 0.72 g/t from 52 m
RC/DD
179/-76
NSI
RC
180/-66
NSI
RC
180/-67
NSI
RC/DD
181/-76
NSI
RC
180/-72
NSI
RC/DD
182/-74
NSI
RC/DD
180/-66
NSI
RC/DD
180/-78
NSI
RC/DD
181/-71
NSI
RC/DD
180/-62
NSI
RC/DD
181/-71
NSI
RC/DD
182/-74
NSI
RC/DD
177/-67
NSI
RC/DD
180/-78
NSI
RC
180/-73
NSI
RC
180/-60
NSI
RC
269/-60
4m @ 0.55 g/t from 220 m
MERC259
12m @ 2.63 g/t from 260 m
MERC260
360,892
6,513,676
362
134
MERC261
360,868
6,513,778
362
200
Widgie
Nickel
Widgie
Nickel
RC
269/-60
NSI
RC
269/-60
8m @ 0.67 g/t from 11 m
MERC261
6m @ 0.5 g/t from 23 m
MERC261
8m @ 0.54 g/t from 40 m
MERC261
5m @ 0.52 g/t from 53 m
MGCR0001
360,325
6,513,600
382
32
Auric
RC
000/-90
MGCR0001
8m @ 0.85 g/t from 5 m
8m @ 0.63 g/t from 18 m
MGCR0002
360,325
6,513,610
382
33
Auric
RC
000/-90
NSI
MGCR0003
360,325
6,513,620
382
33
Auric
RC
000/-90
3m @ 0.56 g/t from 14 m
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
MGCR0003
3m @ 0.53 g/t from 26 m
MGCR0004
360,325
6,513,630
383
33
Auric
RC
000/-90
NSI
MGCR0005
360,325
6,513,640
383
33
Share your feedback