Munda Gold Mine Status Update
Released
Released
Announcement PDF
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 JANUARY 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Munda Gold Mine
Status Update
Highlights
• Second toll processing campaign of Munda ore commenced on target at Black
Cat Syndicate Ltd (ASX: BC8) Lakewood Mill 26 January 2026.
• First gold sales expected week starting 9 February 2026.
• Toll processing to take approximately 3 weeks.
• First cash from sale of gold predicted late February 2026.
• All current mining operations of the Starter Pit at Munda Gold Mine completed
on 26 January 2026.
Management Comment
Managing Director, Mark English, said:
“The completion of mining the Starter Pit at Munda and commencement of
processing the second campaign at Lakewood is another huge step forward for
Auric. Given the rapidly increasing gold price, we anticipate a far greater cash
inflow and profit than previously expected.
“The Starter Pit results continue to validate Munda as a high-quality gold asset
capable of generating near-term value while we progress planning for the larger
Munda Main Pit. Auric is continuing to build on this momentum and transition further
into a sustainable gold producer,” said Mr. English.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 JANUARY 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Munda Campaign Two stockpiles at Lakewood Mill: 26 January 2026.
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide an
operational update on activities at its Munda Gold Mine, as the Company
commences toll processing of the second campaign at the Lakewood Milll.
Mining operations of the Starter Pit at Munda were completed early on 26 January
2026. Ore haulage is continuing with material being transported to Black Cat
Syndicate Ltd (ASX: BC8) Lakewood Mill.
Toll processing of the second campaign commenced on target in the afternoon of
26 January 2026 and is anticipated to last about 3 weeks.
Based on current timelines, Auric expects to commence selling gold in the week
starting 9 February 2026 and receive our first cash proceeds from the sale of gold in
late February 2026.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 JANUARY 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Forward Looking Statement
This Announcement may contain forward-looking statements which are identified
by words such as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’,
‘expecting’, or ‘intends’ and other similar words that involve risks and uncertainties.
These statements are based on an assessment of present economic and operating
conditions, and on several assumptions regarding future events and actions that, as
at the date of this Announcement, are considered reasonable. Such forward-
looking statements are not a guarantee of future performance and involve known
and unknown risks, uncertainties, assumptions, and other important factors, many of
which are beyond the control of the Company, the Directors, and the
management. The Directors cannot and do not give any assurance that the results,
performance, or achievements expressed or implied by the forward-looking
statements contained in this Announcement will occur and investors are cautioned
not to place undue reliance on these forward-looking statements.
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
T +61 409 372 775
E menglish@auricmining.com.au
Investor Relations
Alex Cowie
Director
NWR Communications
T +61 412 952 610
E alexc@nwrcommunications.com.au
Follow our
communications
Click here to subscribe
to our updates
Share your feedback
Discover