Quarterly Activities Report
Released
Released
Announcement PDF
Quarterly Activities Report
31 March 2024
auricmining.com.au
ASX:AWJ
1
ASX Announcement 30 April 2024
Highlights
Jeffreys Find Gold Mine
Corporate
•
Stage Two Mining commenced on
10 March 2024 with over 300,000
tonnes of ore to be mined in 2024.
•
17,493,780 options exercisable at 31
March 2024 were converted in April 2024,
being 99% of this class of options on issue.
•
First toll mining campaign for 2024
is underway at Greenfields Mill,
Coolgardie.
•
The Company received $2,644,067, before
costs, in April 2024 from exercise of
options.
•
First gold sales expected early
May 2024.
•
Current cash
$4,100,000.
Munda Gold Project
•
Assay results received for all of the
361 holes drilled in the first Munda
10m X 10m grade control pattern.
•
Four contract mining companies
have provided pricing estimates for
mining and drill and blast services
at Munda.
•
Metallurgical testwork underway.
at
bank
is
around
ASX Announcement 30 April 2024
2
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to report on its activities during
the 31 March 2024 Quarter and up to the date of this announcement.
Managing Director, Mark English said: “Another excellent quarter for Auric, both from operational and
corporate perspectives.
“It was great to recommence mining at Jeffreys Find with BML Ventures Pty Ltd. It’s a terrific time to be
mining and producing gold with such a tremendous gold price. We are looking forward to a strong year
from mining activities at Jeffreys Find.
“We completed the grade control/resource definition drilling program at Munda in this March quarter.
This is another positive step towards development of Munda and whilst there remains a lot to be done,
we are still working towards mining commencing in either the last quarter of calendar year 2024 or the
first quarter of 2025.
“The completion of the fund raising of the 31 March 2024 options was well received by our shareholders
and the shortfall underwriter, with 99% of the total options available being exercised into shares. We
now have about $4.1M cash at bank with further cash due from our share of surplus cash from mining
at Jeffreys Find, a great place to be,” said Mr English.
PRINCIPAL ACTIVITIES
Stage two open pit mining commenced on 10 March 2024 at Jeffreys Find with the first processing
campaign for 2024 underway from 17 April 2024.
BML Ventures Pty Ltd (BML) of Kalgoorlie, Auric’s joint venture partner at Jeffreys Find have
executed a contract with FMR Investments Pty Ltd (FMR) to toll mill a minimum of 300,000 tonnes
of ore at the Greenfields Mill (Greenfields), Coolgardie, WA during 2024, well in excess of the
176,000 tonnes processed from 2023’s Stage One.
ASX Announcement 30 April 2024
3
JEFFREYS FIND GOLD MINE
Through the joint venture with BML, a grade
control drilling program over a potential final
pit was completed on 15 January 2024.
The grade control program provided further
details needed for planning of the Stage Two
pit. The Stage Two pit design is based on a
gold price of AUD $2,900 per ounce with
current price in excess of $3,500 per ounce.
This is significantly higher than a gold price
of AUD$2,600 per ounce used to constrain
the Stage One pit design in 2023.
BML executed a contract with FMR to toll mill
a minimum of 300,000 tonnes of ore at the
Greenfields Mill, Coolgardie during 2024.
This is substantially more than the 176,000
tonnes processed from Stage One at the
same mill in 2023. A total of 9,741 ounces of
gold was produced from processing of the
Stage One ore.
Equipment was mobilised to the mine site in
February 2024 and mining recommenced on
10 March 2024. Processing at Greenfields in
the first campaign of 2024 commenced on 17
April 2024. It is expected that approximately
35,000 dry metric tonnes will be processed
in this initial campaign.
Auric has paid $1.0 million as working capital
to BML. Apart from that payment, BML are
incurring and paying all additional mining
costs and expenses. After completing
phases of mining the two partners will
subtract costs before splitting the surplus
cash proceeds on a 50:50 basis. Auric is
expecting cash during 2024.
Figure 1.
Jeffreys Find
Gold Mine.
ASX Announcement 30 April 2024
4
Gold Project
All assay results have been received for 361 RC holes representing 11,301m drilled in the first
phase of grade control drilling at the Munda Gold Project.
Additional to the very high-grade intercepts reported in the previous quarter, the latest assay results
include further significant intercepts at a 0.5g/t cut-off. Several intercepts extend to the bottom of
hole together with high-grade intervals such as:
MGCR0286
1m @ 12.03g/t and 3m @ 10.77g/t Au
MGCR0287
7m @ 2.28g/t Au to bottom of hole
MGCR0272
1m @ 15.57g/t Au to bottom of hole
3m @ 3.54g/t Au to bottom of hole
MGCR0276
2m @ 6.60g/t Au
MGCR0181
3m @ 3.60g/t Au
MGCR0315
Table 1: High-grade and/or broad intercepts at a 0.5g/t cut-off received during Q1 2024.
The drill pattern covered a conceptual starter
pit defined in a recent Scoping Study within
a larger area of near surface mineralisation
(Figure 2).
Most of the drilling was undertaken by
Kalgoorlie-based Total Drilling Services Pty
Ltd (TDS) with the final 10 holes drilled by
Kennedy Drilling in conjunction with a small
program at Munda East.
Most holes were drilled vertically to depths of
30-35m, targeting either the 350m or 345m
reduced level (RL). Angled holes were drilled
around the margin of the historic Resolute
trial pit together with some in the trial pit.
Shallower vertical holes were drilled in the
Resolute trial pit to reach the same
elevations.
RC drill holes were sampled at 1m intervals
and samples assayed for gold via a 50g fire
assay. Whilst significant assay intervals at a
0.5g/t Au cut-off are widespread, there are
several zones of high-grade and/or broadly
mineralised intervals, particularly below and
adjacent to the 1999 Resolute trial pit (Figure
2).
Figure 2. Munda
optimised pit outline,
first conceptual
starter pit and
existing trial pit with
completed 10 x 10m
pattern drill holes and
selected intercepts at
a 0.5g/t cut-off.
.
ASX Announcement 30 April 2024
3.1 Contract Mining Quotes
Four contract mining companies have provided
budget pricing estimates for mining and drill and
blast services at Munda. These costings will
contribute to detailed assessment of mining
options.
3.2 Other Work in Progress
Metallurgical samples representing a range of
Munda lithologies and oxidation profiles are
currently being tested by ALS Metallurgy in Perth.
A preliminary geotechnical assessment for pit wall
design is being undertaken by Peter O’Bryan and
Associates.
3.3 Next Steps
New pit optimisations will now be undertaken
utilising the up-to-date contract mining costs,
results from metallurgical testwork and a resource
model that incorporates the 10m x 10m drill data.
Optimised pits are expected to form the basis for
detailed mine design and mine scheduling.
5
3.4 Munda East RC Drilling
Results have been received for a 7-hole, 390m
RC drilling program that tested several drill
targets approximately 1km to the east of the
Munda gold deposit, within the Munda mining
lease, M15/87 (Figure 3). Four of the holes
targeted anomalism defined in RC holes drilled
prior to 1995 and three targeted historic
workings including a substantial shaft.
Holes were drilled by Kalgoorlie-based
Kennedy Drilling, inclined at 60 degrees to the
west or southwest, to depths of 30m or 60m. As
with the grade control drilling, samples were
taken at 1m intervals and analysed using a 50g
fire assay. Quality control procedures, including
routine insertion of field duplicates and
commercially supplied standards, was also
consistent with the grade control drilling.
The best result was a single metre from surface
in AMRC0058 which assayed at 15.02g/t.
Whilst encouraging, the high-grade interval is
isolated and not continuous into the
neighbouring drill holes.
A 15m zone of anomalism in the range of 0.1 to
0.2g/t Au was intersected beneath historic
workings in AMRC0060 but the only significant
assay at 0.5g/t cut-off in that interval is 1m @
1.57g/t from 31m.
Figure 3.
Munda East
RC Drill
Hole Collar
Locations
ASX Announcement 30 April 2024
6
4.0 OTHER EXPLORATION
No other significant exploration was undertaken during the quarter.
5.0 HERITAGE
Auric maintains a good relationship with the two native title claimant groups in the Widgiemooltha –
Norseman area; Ngadju Native Title Claimant Group and Marlinyu Ghoorlie Native Title Claimant
Group.
6.0 SAFETY
There were no alternate duty injuries (“ADI”) and no medically treated injuries (“MTI”) reported
during the March quarter. There were no lost time incidents (“LTI”) recorded during the March
quarter.
7.0 ASX COMPLIANCE
Compliance Statement
The information in this report that relates to gold production, exploration results and to the Scoping
Study for Munda is extracted from the Company’s following ASX announcements which are
available to view on the Company’s website, www.auricmining.com.au:
ASX Announcements included in the March 2024 Quarter
Date
Details
23 January 2024
Mining to Recommence in March 2024 at Jeffreys Find
30 January 2024
Grade Control Drilling Program Completed at Munda Gold Project
22 February 2024
Mining to Recommence at Jeffreys Find. Toll Mill Contract for Minimum
300,000 Tonnes
3 April 2024
Munda Gold Project Grade Control Drilling Program Completed. Mine
Planning Progresses
9 April 2024
Jeffreys Find Gold Mine First Parcel of Ore for 2024 to be Processed MidApril
ASX Announcements referred to from previous quarters
28 June 2023
Positive Scoping Study for Munda Gold Project.
25 August 2023
First Stage Mining and Processing Completed – All Gold Sold.
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements. The Company confirms that the form and
context in which the Competent Persons’ findings are presented have not been materially modified from
the original market announcements.
ASX Announcement 30 April 2024
7
Forward Looking Statements
This Announcement contains forward-looking statements which are identified by words such as
‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’, ‘expected’, or ‘intends’ and other similar
words that involve risks and uncertainties. These statements are based on an assessment of
present economic and operating conditions, and on a number of assumptions regarding future
events and actions that, as at the date of this Announcement, are considered reasonable. Such
forward-looking statements are not a guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions and other important factors, many of which are beyond
the control of the Company, the Directors and the management. The Directors cannot and do not
give any assurance that the results, performance or achievements expressed or implied by the
forward-looking statements contained in this announcement will actually occur and investors are
cautioned not to place undue reliance on these forward-looking statements.
8.0 TENEMENTS
See attached Schedule 1 which lists the mining tenements held at the date of this announcement,
their location and equity ownership. Auric has interests in 37 tenements.
Farm-in or Farm-out agreements
Auric is not party to any Farm-in or Farm-out agreements.
9.0 RELATED PARTY PAYMENTS
The Company paid salaries, superannuation, annual leave and other employment entitlements to
full time employee Directors of the company of $131,000. The Company also paid $20,000 to
Director-related parties of the Company. These costs are included in administration costs and
working capital except when technical staff are working in the field. Those direct costs are allocated
to the tenements and projects and are included at item 2.1(d) of 31 March 2024 Quarter Appendix
5B.
ASX Announcement 30 April 2024
Figure 4. Auric’s projects in the Widgiemooltha-Norseman area.
8
ASX Announcement 30 April 2024
9
Auric Mining was established to explore for and develop gold and other mineral deposits in the
Widgiemooltha-Norseman area, of Western Australia.
Auric has tenements covering 282km². Auric holds the rights to gold on all tenements, including
those held in the name of Mt Edwards Critical Metals Pty Ltd. Further, at Munda it holds all mineral
rights except nickel and lithium. For all other tenements, excluding those held in the name of Mt
Edwards Critical Metals Pty Ltd, Auric holds 100% of all mineral rights.
The tenements are separated into four projects (Figure 4):
The Widgiemooltha Gold Project including the Munda Gold Project
The Widgiemooltha Gold Project (“WGP”) located near the town of Widgiemooltha combines 24
tenements, including 5 granted Mining Leases. All tenements are highly prospective for gold
mineralisation. This includes the Munda Gold Project. The combined Inferred and Indicated Mineral
Resource estimate for Munda Gold Project at 0.5g/t cut-off is 4.48Mt @ 1.38g/t Au for 198,700oz
gold1.
The Jeffrey Find Gold Mine
The Jeffreys Find Gold Mine is 50km northeast of Norseman and combines 2 tenements including
1 granted Mining Lease. It includes the Jeffreys Find gold deposit where gold mineralisation extends
from the surface to at least 110m in vertical depth and is thickest near the surface. The deposit is
currently being mined via a joint venture with BML Ventures Pty Ltd.
The Spargoville Project
The Spargoville Project is located 30km north of Widgiemooltha and combines 8 tenements. It lies
in the same stratigraphy, along strike from the Wattle Dam Gold Mine which produced 268,000oz
gold @ 10g/t from 2006-13; one of Australia’s highest-grade mines at that time.
The Chalice West Project
The Chalice West Project is largely underlain by granites but also includes sections of the
Binneringie dolerite dyke. The project is prospective for Rare Earth Elements (REE) and for Ni-Cu
and Pt-Pd deposits
This announcement has been approved for release by the Board.
Corporate Enquiries
Follow our communications
Mark English
Managing Director
Auric Mining Limited
+61 409 372 775
menglish@auricmining.com.au
Subscribe: auricmining.com.au
1 (ASX:AWJ): Announcement 28 January 2022: Increase in Estimated Resources at Munda and Reclassification from Inferred to
Indicated.
10
ASX Announcement 30 April 2024
Schedule of Tenements
Schedule 1. The following table lists the mining tenements held today’s date and their location.
Tenement
Project
Location
Status
Registered Holder
Mineral Rights
Widgiemooltha
M15/74
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/75
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/698
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/699
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/87
Widgiemooltha
WA
Live
Widgie Gold
100% All Minerals
except Ni, Li
E15/1553
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1576
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1583
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6092
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6387
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6570
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6612
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6362
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1749
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
L15/414
Widgiemooltha
WA
Live
Widgie Gold
Infrastructure
E15/1949
Widgiemooltha
WA
Live
Widgie Gold
100% All minerals
E15/1950
Widgiemooltha
WA
Live
Widgie Gold
100% All minerals
E15/2042
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
E15/2043
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
E15/2069
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
E15/2073
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
P15/6808
Widgiemooltha
WA
Live
Widgie Gold
100% All minerals
P15/6539
Widgiemooltha
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
P15/6853
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
ASX Announcement 30 April 2024
Tenement
11
Project
Location
Status
Registered Holder
Mineral Rights
M63/242
Jeffreys Find
WA
Live
Jeffreys Find
100% All Minerals
L63/97
Jeffreys Find
WA
Live
Jeffreys Find
Infrastructure
E15/1689
Spargoville
WA
Live
Spargoville Minerals
100% All Minerals
E15/1688
Spargoville
WA
Live
Spargoville Minerals
100% All Minerals
E15/1665
Spargoville
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
P15/5905
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/5906
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6408
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6758
Spargoville
WA
Pending
Spargoville Minerals
100% All Minerals
M15/1899
Spargoville
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
E15/1945
Chalice West
WA
Live
Chalice West
100% All Minerals
E15/1978
Chalice West
WA
Live
Chalice West
100% All Minerals
E15/1979
Chalice West
WA
Live
Chalice West
100% All Minerals
Jeffreys Find
Spargoville
Chalice West
Auric Mining Limited
Level 1, 1 Tully Road
East Perth WA 6004
Australia
T +61 8 9548 9997
E info@auricmining.com.au
auricmining.com.au
ASX:AWJ