Quarterly Report 31 December 2025
2
Highlights
Munda Gold Mine
• Campaign one production at the Munda Gold Mine was completed and fully reconciled during
the December Quarter. Delivering 2,718 ounces of gold and generating A$16.85 million in gross
sales, with A$10.82 million in net cash received by Auric after milling, haulage and royalty costs.
• At the end of the December Quarter, approximately 67,000 tonnes of high-grade ore was
stockpiled on the ROM pad at Munda, positioning for processing of campaign two. Mining of
the Starter Pit is expected to be completed in late January 2026.
• Processing of campaign two, comprising approximately 65,000 tonnes, has been secured for
toll-milling at the Lakewood Mill, with processing scheduled to commence around 27 January
2026.
Jeffreys Find Gold Mine
• BML Ventures Pty Ltd completed mine site rehabilitation including contouring and sheeting of
the waste dump and ripping of cleared areas during the quarter.
• Ongoing monitoring now required to ensure successful site restoration.
• The project delivered a strong financial contribution to Auric over its life, generating
approximately 29,537 ounces of gold and ~A$14.5 million in cashflow to the Company. The final
project reconciliation will be completed in Q1/2026.
Burbanks Plant
• Burbanks Gold Processing Plant tenure integration and technical evaluation advanced during
the quarter.
• Plant currently offers 180,000 tpa CIL capacity with grid power, water licence, fully permitted
and sealed-road access.
Lindsay’s Acquisition
• Settlement of tenements not subject to Wardens Court proceedings completed 19 November
2025.
• Auric now has sole control of Wardens Court action for M27/169.
• A further $1.3 million cash plus $2 million in shares is payable upon successful Wardens Court
litigation for the remaining 3 tenements.
• The Vendors retain management of M27/34 and M27/486 until successful resolution of the
Wardens Court litigation.
Corporate
• Current issued capital is 187,093,602 shares at 31 December 2025.
• Cash on hand and investments at 31 December 2025 is $6.7 million.
• The Company has no debt and is unhedged.
Quarterly Report 31 December 2025
3
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to report on its activities
during the 31 December 2025 Quarter.
Figure 1. Managing director, Mark English at Munda Gold Mine.
Managing Director, Mark English said: “Auric has delivered an exceptional quarter that places
the Company in the strongest position in our history.”
“The completion and reconciliation of Munda’s first mining and processing campaign far exceeded
expectations. The combination of good grade, excellent recoveries, and a surging gold price has
contributed to a substantial cash injection for the business.
“Operationally, we could not be more pleased with how smoothly Munda performed, from mining,
and ore haulage through to treatment at Lakewood Mill.
“We are equally proud of the progress made on the Burbanks Gold Processing Plant and the
expansion of the Lindsay’s tenement package. Both projects materially enhance our long-term
strategic capacity.
“With our second 65,000-tonne campaign secured and commencing in late-January 2026, work
now begins in earnest on laying the foundations for a significantly expanded Munda Main Pit
operation in 2026 and beyond,” said Mr English.
Quarterly Report 31 December 2025
4
1.0 PRINCIPAL ACTIVITIES
Munda Gold Mine
Mining and processing activities at Auric’s Munda Gold Mine advanced significantly during the
December Quarter, with the successful completion of the processing campaign one. Ore mining
and haulage continued through October, with approximately 60,600 tonnes of high-grade ore
delivered to Black Cat Syndicate Ltd’s Lakewood Mill for toll treatment. Processing commenced on
12 October 2025 and was completed ahead of schedule on 2 November 2025, with metallurgical
performance exceeding expectations.
With Auric as the mine operator, the first production campaign delivered 2,718 ounces of gold from
57,900 dry tonnes milled, with a reconciled head grade of 1.61 g/t Au and mill recovery of 90.67
percent. Gold sales from the campaign generated A$16.85 million in gross revenue, delivering
A$10.82 million net cash to Auric after milling, haulage and royalty costs. These results were
significantly above internal planning estimates and materially strengthened the Company’s financial
position at quarter end.
At the end of the December Quarter, approximately 67,000t of high-grade ore has been stockpiled
at Munda, in preparation for campaign two at Lakewood.
A second and final processing campaign for the Starter Pit, comprising approximately 65,000
tonnes of ore, has been secured at the Lakewood Mill and is scheduled to commence in late-
January 2026.
Jeffreys Find Gold Mine
Jeffreys Find entered its closure stages during the December Quarter following completion of
processing earlier in the September quarter. Auric’s joint venture partner, BML Ventures Pty Ltd
undertook site rehabilitation in accordance with regulatory requirements, including the contouring
of the waste dump and ripping of cleared areas. No new mining activities took place, and no further
gold production was recorded.
The project delivered a strong financial contribution to Auric over its life, generating approximately
29,537 ounces of gold and ~A$14.5 million in cashflow to the Company.
Burbanks Plant
Auric continued technical and operational evaluation of the fully permitted 180,000 tonne-per-
annum CIL processing facility located 10 kilometres south of Coolgardie during the Quarter,
following completion of the acquisition on 30 September 2025. The Burbanks Gold Processing
Plant remains a key strategic asset supporting Auric’s transition toward becoming an integrated
miner and processor. Engineering and technical review work progressed during the quarter to
assess refurbishment requirements and potential expansion options for future processing of Auric
owned ore.
Lindsay’s Acquisition
Auric progressed the acquisition of the Lindsay’s Gold Project during the December Quarter,
completing settlement on four tenements not subject to Warden’s Court proceedings following
execution of the Tenement Sale Agreement on 19 November 2025. Additionally, Auric assumed
legal management and responsibility for the Warden’s Court matter relating to tenement M27/169
and, subject to successful resolution, has committed to further cash payments and the issue of
Auric shares in accordance with the agreed acquisition terms.
Corporate
The Company’s issued capital totalled 187,093,602 shares at 31 December 2025. Cash and
investments on hand totalled $6.7 million. The Company has no debt and is totally unhedged.
Quarterly Report 31 December 2025
5
2.0 MUNDA GOLD MINE
2.1 Starter Pit Performance
The Munda Gold Mine remained the Company’s primary operational focus during the December
Quarter with actives spanning mining, ore haulage, toll-milling, gold production, gold sales, and the
subsequent reconciliation of Campaign One. Mining operations in the Starter Pit continued
throughout the Quarter, with ore hauled daily during October to Black Cat Syndicate Ltd’s Lakewood
Mill.
Mining was managed and equipment operated by Auric employees utilising a dry-hire mining fleet
supplied by MHM Contracting, who also provided maintenance support. Grade control drilling and
drill and blast services were provided by Kalgoorlie-based contractor, Total Drilling Services Pty Ltd
Processing of Munda ore commenced on 12 October 2025 at Lakewood Mill under the ore treatment
agreement with Black Cat Syndicate. Auric delivered the first of two parcels totalling 125,000 tonnes
of Munda Starter Pit ore, with the initial parcel amounting to approximately 60,600 tonnes.
Processing was completed ahead of schedule on 2 November 2025 and metallurgical performance
throughout the campaign was better than expected. A reconciled head grade of 1.61 grams per
tonne and recovery of 90.67 percent, resulted in 2,718 ounces of gold produced from 57,900 dry
metric tonnes milled. This strong outcome reaffirmed the Company’s confidence in the broader
production potential of the mine.
The campaign generated three early gold pours before reconciliation was completed. The first two
gold sales, comprising 980 ounces and 810 ounces respectively, occurred on 31 October and 3
November 2025 at an average realised price of A$6,130 per ounce, delivering nearly A$11 million
in gross revenue. A further pour of 565 ounces was subsequently sold at A$6,406 per ounce,
bringing total ounces sold prior to Gold-in-Circuit (GIC) calculations to 2,355 ounces and total
interim revenue to A$14.6 million. After accounting for milling and haulage expenses, these initial
sales resulted in A$8.8 million net cashflow for Auric.
Figure 2. Munda gold pour at Lakewood Mill (October 2025).
Quarterly Report 31 December 2025
6
The calculation of the GIC and reconciliation of Campaign One was formally completed on 18
November 2025 and delivered outstanding results significantly above internal planning estimates.
The finalised production and financial metrics confirmed that Auric had generated A$16.85 million
in gross gold sales from 2,718 ounces produced, with A$10.82 million received after third-party
operational costs including milling, haulage, and royalties. The strength of the gold price
environment further amplified this result, enabling Auric to establish a solid financial platform for the
next stage of Munda’s development. At quarter end, Auric held approximately A$6.7 million cash at
bank with further receipts expected early in the March 2026 Quarter from Campaign Two.
Table 1. Munda Processing Campaign 1 Final Production Metrics
Dry Tonnes Milled 57,900
Reconciled Head Grade g/t 1.61
Mill Recovery 90.67%
Gold Recovered - Ounces 2,718
Table 2. Financial Outcome
Gold Sold - Ounces 2,718
Average Sale Price per ounce $6,200
Total Gold Sales $16,851,773
Less External Direct Costs¹ $6,032,878
Net Cash to Auric $10,818,895
¹ Milling, haulage and royalty costs.
The outstanding performance of Campaign One has several important implications for Auric’s
forward development strategy. Firstly, it confirms the quality and commercial attractiveness of the
Munda orebody, demonstrating good grade performance and better than expected metallurgical
recoveries. Secondly, the geotechnical and geological information obtained from the Starter Pit
provides valuable data to refine the resource modelling and design of the Munda Main Pit. Thirdly,
the operational success of the Lakewood Mill toll-treatment arrangement validates the effectiveness
of this processing pathway for near-term production while longer-term processing options are
developed in parallel at Burbanks. Finally, the significant cash inflow places Auric in a strong
financial position to progress growth initiatives.
Figure 3. Doré bars Lakewood Mill (October 2025).
Quarterly Report 31 December 2025
7
2.2 Planning for Campaign Two
During the quarter, Auric confirmed its allocation for a second processing window at Lakewood Mill,
which is scheduled to commence in late January 2026. This second campaign will process 65,000
tonnes of Munda Starter Pit ore under the toll-milling agreement. Grade control drilling and updated
geological models completed during the quarter led to refinements of the Starter Pit design, enabling
Auric to capture additional ore at the base of the pit. At the close of the December Quarter,
approximately 67,000t of high-grade ore has been stockpiled at Munda with mining to extend into
January 2026. The Company expects Campaign Two to extend the strong production and cashflow
momentum established in Campaign One and to further consolidate Auric’s operational expertise
as it prepares for a transition to larger-scale operations in the Munda Main Pit.
2.3 Development Pathway – Munda Main Pit
The much larger Main Pit is expected to form the core of Auric’s production profile for several years
and represents a significant opportunity to substantially increase gold output beyond Starter Pit
levels. Planning work for the Main Pit is scheduled to begin following reconciliation of gold recovered
from the completed Starter Pit with resource and grade control models for the same volume.
Detailed design work and further economic analysis is expected to lead to permitting of the Main
Pit later in 2026.
Figure 4. Munda Pit with ore mark out (November 2025).
2.4 Loan Facility – BML Ventures Pty Ltd
During the quarter, Widgie Gold Pty Ltd, a wholly owned subsidiary of Auric Mining Ltd entered into
a mortgage with BML Ventures Pty Ltd securing Mining Lease M15/87 for a loan facility of up to
$3.0 million. The loan bears interest at 8% per annum, payable monthly in arrears. The facility is
secured against the whole of the shares in the tenement. A total of $1.25 million was drawn and
fully repaid during the quarter, with no amount outstanding at quarter end. The loan facility
remaining available is $3.0 million.
Quarterly Report 31 December 2025
8
3.0 JEFFREYS FIND GOLD MINE
The Jeffreys Find Gold Mine Joint Venture entered the closure stages during the December Quarter.
Mining and processing activity ceased earlier in September quarter, with the project having
delivered a strong financial contribution to Auric over its life, producing approximately 29,537
ounces of gold and generating $14.5 million in cashflow to the Company. During the quarter, BML
Ventures Pty Ltd undertook mine site rehabilitation in accordance with the project’s Mining Proposal
and Mine Closure Plan. This included waste dump profiling and topsoil sheeting together with
removal of all mining infrastructure and ripping of cleared areas to enhance vegetation regrowth.
No new mining activities took place, and no further gold production was recorded.
Jeffreys Find Gold Mine
Stage One
2023
Stage Two 2024-
2025*
Total Project To
December 2025*
Gold Recovered – Ounces 9,741 19,796 29,537
Average Sale Price per
ounce AUD
$3,006 $4,134 $3,792
Cash to Auric $4.76mil $9.1mil $14.5mil
Table 3. Jeffreys Find – Gold Sold after 8th
Processing Campaign
*As of 31 December 2025, interim figures only
Figure 5. Mark English and John Utley holding a Jeffreys Find doré bar.
Quarterly Report 31 December 2025
9
4.0 BURBANKS GOLD PROCESSING PLANT
The acquisition of the Burbanks Gold Processing Plant was completed by Auric on 30 September
2025. The plant’s location, and infrastructure make it a highly valuable long-term asset capable of
providing Auric with substantial processing flexibility.
Metallurgical and engineering consultants undertook an inspection of the Burbanks processing
plant during the Quarter and are currently outlining various development options at a desktop (ie,
pre scoping study) level.
Figure 6. Burbanks gold processing plant.
Quarterly Report 31 December 2025
10
5.0 LINDSAY’S FIND ACQUISITION
The Company executed a Tenement Sale Agreement on 19 November 2025, completing settlement
on four tenements forming part of the Lindsay’s Project for a total of $400,000. Auric also assumed
management and responsibility for the Warden’s Court proceedings relating to tenement M27/169
whilst the vendor retains responsibility for proceedings related to two other tenements, M27/34 and
M27/486.
Under the agreed acquisition terms, Auric has secured the right to undertake work on M27/169 and,
subject to successful resolution of the litigation, will make a further cash payment of A$1.3 million
and issue A$2.0 million in Auric shares. A cash payment of $300,000 is payable to the vendor
following the successful resolution of litigation on M27/34 and M27/486.
Figure 7. The Lindsay’s Project and Auric’s projects north of Widgiemooltha.
Quarterly Report 31 December 2025
11
6.0 OTHER EXPLORATION
No other significant exploration was undertaken during the quarter. Planning is underway for RC
and aircore drilling campaigns to start across Higginsville (Loded Dog), Chalice West, Spargoville
and Widgiemooltha tenements in the second quarter of 2026.
7.0 HERITAGE
No heritage surveys or ground-disturbing heritage activities were undertaken during the December
2025 Quarter. All operations at the Munda Gold Mine were conducted within previously cleared and
approved disturbance areas, and no exploration or development activities were carried out on newly
acquired tenements during the period.
8.0 SAFETY
There were no alternate duty injuries (“ADI”) and no medically treated injuries (“MTI”) reported
during the quarter. There were no lost time incidents (“LTI”) recorded during the quarter.
9.0 ASX COMPLIANCE
9.1 Compliance Statement
The information in this report that relates to exploration results and gold production is extracted from
the Company’s following ASX announcements which are available to view on the Company’s
website, www.auricmining.com.au:
ASX Announcements included in the December 2025 Quarter up to date
Date Details
1 October 2025 Auric Successfully Completes Burbanks Plant Acquisition
14 October 2025 First Munda Ore Processing Commenced at Lakewood Mill
22 October 2025 First Munda Gold Pour Completed at Lakewood Mill
5 November 2025 First Munda Gold Mine Sales at average A$6,130 an ounce
18 November 2025 Update - Munda Buoyant Sales Deliver Auric $14.6M Revenue
20 November 2025 Lindsays Gold Project Tenement Sale Agreement Executed
1 December 2025 Munda Gold Mine Campaign One Results
ASX Announcements referred to from previous quarters
12 Dec 2024 Munda Gold Deposit Starter Pit Ore Reserve
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements released during the quarter. The
Company further confirms that the form and context in which the Competent Persons’ findings are
presented have not been materially modified from those original announcements. With respect to
ASX Listing Rules 5.3 and 5.5, the Company confirms that it continues to be classified as a mining
exploration entity.
Quarterly Report 31 December 2025
12
No mining or production activities were undertaken at Jeffreys Find during the December Quarter.
Mining, ore haulage, toll milling, gold production and gold sales were undertaken at the Munda Gold
Mine during the December 2025 Quarter under the Ore Purchase and Processing Agreement with
Black Cat Syndicate Ltd (ASX: BC8). Auric confirms that it is operating in its own right at Munda and
that all technical parameters, production metrics and operational assumptions disclosed in prior
market announcements remain current and unchanged, except where updated by announcements
released during the quarter.
9.2 Forward Looking Statements
This Announcement contains forward-looking statements which are identified by words such as ‘may’,
‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’, ‘expected’, or ‘intends’ and other similar words that
involve risks and uncertainties. These statements are based on an assessment of present economic
and operating conditions, and on a number of assumptions regarding future events and actions that,
as at the date of this Announcement, are considered reasonable. Such forward-looking statements
are not a guarantee of future performance and involve known and unknown risks, uncertainties,
assumptions and other important factors, many of which are beyond the control of the Company, the
Directors and the management. The Directors cannot and do not give any assurance that the results,
performance or achievements expressed or implied by the forward-looking statements contained in
this announcement will actually occur and investors are cautioned not to place undue reliance on
these forward-looking statements.
10.0 TENEMENTS
The attached schedule 1 lists the mining tenements held at 31 December 2025, their location and
equity ownership. Auric has interests in 73 tenements at that date.
New tenements during December 2025 Quarter:
Tenement Project Mineral Rights
E15/2151* Widgiemooltha 100% All minerals
E63/2535* Jeffreys Find 100% All minerals
M27/82 Lindsays 100% All minerals
M27/84 Lindsays 100% All minerals
E27/624 Lindsays 100% All minerals
P27/2406 Lindsays 100% All minerals
*Application
Relinquished tenements during December 2025 Quarter:
Tenement Project Mineral Rights
P15/6092 Widgiemooltha 100% Au Rights
P24/5842 Spargoville 100% All Minerals
10.1 Farm-in or Farm-out agreements
Auric is not party to any Farm-in or Farm-out agreements.
11.0 RELATED PARTY PAYMENTS
The Company paid salaries, superannuation, annual leave and other employment entitlements to full
time employee Directors and related parties of the Company of $410,000. The Company also paid
$30,666 to Director-related parties of the Company. These costs are included in administration costs
and working capital except when technical staff are working in the field. Those direct costs are
allocated to the tenements and projects and are included at item 2.1(d) of 31 December 2025 Quarter:
Appendix 5B.
Quarterly Report 31 December 2025
13
Figure 8. Auric’s projects in the Widgiemooltha-Norseman area.
Auric Mining Ltd
Auric Mining Ltd was established to explore for and develop gold and other mineral deposits in the
Widgiemooltha-Norseman area, of Western Australia.
Auric has tenements covering 494km². Auric holds the rights to gold on all tenements, including those
Quarterly Report 31 December 2025
14
held in the name of Mt Edwards Critical Metals Pty Ltd. Further, at Munda it holds all mineral rights
except lithium. For all other tenements, excluding those held in the name of Mt Edwards Critical
Metals Pty Ltd, Auric holds 100% of all mineral rights.
The tenements are separated into six projects (Figure 8):
The Widgiemooltha Gold Project including the Munda Gold Mine and Loded Dog
tenements
The Widgiemooltha Gold Project located near the town of Widgiemooltha combines 37 tenements,
including 5 granted Mining Leases. All tenements are highly prospective for gold mineralisation.
The Jeffrey Find Gold Mine
The Jeffreys Find Gold Mine is 50km northeast of Norseman and combines 3 tenements including 1
granted Mining Lease. It includes the Jeffreys Find gold deposit where gold mineralisation extends
from the surface to at least 110m in vertical depth. Open pit mining was recently completed via a joint
venture with BML Ventures Pty Ltd.
The Spargoville Project
The Spargoville Project is located 30km north of Widgiemooltha and combines 10 tenements. It lies
in similar stratigraphy, proximal to the Wattle Dam Gold Mine which produced 268,000oz gold @
10g/t from 2006-13; one of Australia’s highest-grade mines at that time.
The Chalice West Project
The Chalice West Project is located 50km southeast of Widgiemooltha and proximal to the Chalice
Gold Mine, a mine that produced almost 700,000 ounces of gold. The Project combines 4 tenements.
It covers 245km², including geology mirroring the Chalice Gold Mine. As well as gold, the Project is
prospective for Rare Earth Elements (REE) and for Ni-Cu and Pt-Pd deposits.
The Burbanks Gold Processing Plant
The Burbanks Gold Processing Plant is located 8km south of Coolgardie and combines 14 tenements
including 3 granted mining leases and 5 General Purpose leases, together with associated
infrastructure. The plant is fully permitted with access to grid power, sealed road and a water licence.
It provides Auric with an in-house processing solution for gold ore from Munda, Lindsay’s and other
nearby projects.
The Lindsay’s Gold Project
The Lindsays Gold Project is located 65km northeast of Kalgoorlie and currently combines 5
tenements. Auric has the right to purchase 3 further tenements subject to resolution of plaints by third
parties against those tenements
This announcement has been approved for release by the Board.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
T +61 409 372 775
E menglish@auricmining.com.au
Investor Relations
Alex Cowie
Director
NWR Communications
T +61 412 952 610
E alexc@nwrcommunications.com.au
Follow our
communications
Click here to subscribe to our
updates
Quarterly Report 31 December 2025
15
Schedule of Tenements
Schedule 1. The following table lists the mining tenements held at 31 December 2025 and their location.
Tenement Project Location Status Registered Holder Mineral Rights
Widgiemooltha
M15/74 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
M15/75 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
M15/698 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
M15/699 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
M15/87 Widgiemooltha WA Live Widgie Gold 100% All Minerals except Ni, Li
E15/1553 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
E15/1576 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
E15/1583 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
E15/1749 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
E15/1864 Widgiemooltha WA Live Mt Edwards Critical Metals 100% All minerals
E15/1949 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1950 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/2042 Widgiemooltha WA Pending Widgie Gold 100% All minerals
E15/2043 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/2069 Widgiemooltha WA Pending Widgie Gold 100% All minerals
E15/2073 Widgiemooltha WA Pending Widgie Gold 100% All minerals
P15/6362 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
P15/6387 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
P15/6539 Widgiemooltha WA Pending Mt Edwards Critical Metals 100% Au Rights
P15/6570 Widgiemooltha WA Live Mt Edwards Critical Metals 100% Au Rights
P15/6808 Widgiemooltha WA Live Widgie Gold 100% All minerals
P15/6853 Widgiemooltha WA Pending Widgie Gold 100% All minerals
P15/6994 Widgiemooltha WA Pending Widgie Gold 100% All minerals
P63/2279 Widgiemooltha WA Live Widgie Gold 100% All minerals
P63/2280 Widgiemooltha WA Live Widgie Gold 100% All minerals
L15/414 Widgiemooltha WA Live Widgie Gold Infrastructure
L15/495 Widgiemooltha WA Pending Widgie Gold 100% All Minerals
L15/496 Widgiemooltha WA Pending Widgie Gold 100% All Minerals
E15/1489 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1523 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1588 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1773 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/2151 Widgiemooltha WA Pending Loded Dog 100% All minerals
E63/1780 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1919 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1957 Widgiemooltha WA Live Widgie Gold 100% All minerals
E63/2103 Widgiemooltha WA Live Widgie Gold 100% All minerals
Quarterly Report 31 December 2025
16
Quarterly Report 31 December 2025
16
Jeffreys Find
M63/242 Jeffreys Find WA Live Jeffreys Find 100% All Minerals
E63/2535 Jeffreys Find WA Pending Jeffreys Find 100% All Minerals
L63/97 Jeffreys Find WA Live Jeffreys Find Infrastructure
Spargoville
M15/1899 Spargoville WA Pending Mt Edwards Critical Metals 100% All Minerals
E15/1665 Spargoville WA Pending Mt Edwards Critical Metals 100% All Minerals
E15/1688 Spargoville WA Live Spargoville Minerals 100% All Minerals
E15/1689 Spargoville WA Live Spargoville Minerals 100% All Minerals
E15/2123 Spargoville WA Pending Spargoville Minerals 100% All Minerals
E26/262 Spargoville WA Live Spargoville Minerals 100% All Minerals
P15/5905 Spargoville WA Live Spargoville Minerals 100% All Minerals
P15/5906 Spargoville WA Live Spargoville Minerals 100% All Minerals
P15/6408 Spargoville WA Live Spargoville Minerals 100% All Minerals
P15/6758 Spargoville WA Live Spargoville Minerals 100% All Minerals
Chalice West
E15/1801 Chalice West WA Live Chalice West 100% All Minerals
E15/1945 Chalice West WA Live Chalice West 100% All Minerals
E63/2483 Chalice West WA Live Chalice West 100% All Minerals
E63/2484 Chalice West WA Live Chalice West 100% All Minerals
Burbanks Gold Processing Plant
G15/10 Burbanks WA Live BBL Milling 100% All Minerals
G15/11 Burbanks WA Live BBL Milling 100% All Minerals
G15/12 Burbanks WA Live BBL Milling 100% All Minerals
G15/13 Burbanks WA Live BBL Milling 100% All Minerals
G15/25 Burbanks WA Live BBL Milling 100% All Minerals
L15/109 Burbanks WA Live BBL Milling 100% All Minerals
L15/110 Burbanks WA Live BBL Milling 100% All Minerals
L15/189 Burbanks WA Live BBL Milling 100% All Minerals
L15/234 Burbanks WA Live BBL Milling 100% All Minerals
L15/284 Burbanks WA Live BBL Milling 100% All Minerals
M15/1273 Burbanks WA Live BBL Milling 100% All Minerals
M15/1369 Burbanks WA Live BBL Milling 100% All Minerals
M15/1370 Burbanks WA Live BBL Milling 100% All Minerals
G15/10 Burbanks WA Live BBL Milling 100% All Minerals
Lindsay’s
M27/82 Lindsay’s WA Live LMG (WA) 100% All Minerals
M27/84 Lindsay’s WA Live LMG (WA) 100% All Minerals
E27/624 Lindsay’s WA Live LMG (WA) 100% All Minerals
E27/246 Lindsay’s WA Pending LMG (WA) 100% All Minerals
P27/2406 Lindsay’s WA Live LMG (WA) 100% All Minerals
Auric Mining Limited
Level 1, 1 Tully Road
East Perth WA 6004
Australia
T +61 8 9548 9997
E info@auricmining.com.au
auricmining.com.au
ASX: AWJ
Share your feedback
Discover