Quarterly Activities Report
Released
Released
Announcement PDF
A S X A nn oun c em en t
30 October 2023
auricmining
ASX: AWJ | ACN 635 470 843
ASX:AWJ
QUARTERLY
ACTIVITIES
REPORT
QUARTER ENDED
30 SEPTEMBER 2023
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
Quarterly Report
30 September 2023
HIGHLIGHTS
JEFFREYS FIND GOLD MINE
•
Stage One mining complete. 180,000 tonnes of ore hauled to Coolgardie
Mill. Sold 7,029 ounces at 24 October 2023.
•
Auric banks $2.2 million as first surplus cash distributed from project.
•
First Stage ore processing to be completed early November 2023.
•
Further surplus cash distributions imminent.
MUNDA GOLD PROJECT
•
Grade control drilling program to start 1 November 2023 with 380-hole plan.
•
Drilling program to significantly de-risk project with aim to commence
mining in 2024.
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to report on its
activities during the 30 September 2023 Quarter and up to the date of this announcement.
“Our main focus in the quarter was mining of Jeffreys Find Gold Mine near Norseman and
advancing the Munda Gold Project.” said Auric’s Managing Director Mark English.
“Through BML Ventures Pty Ltd we completed two gold campaigns and achieved our ambition
in becoming a gold producer in just three years since listing on the ASX.
“We have produced cash and Auric now becomes self-funding. We are marching on towards
our bigger picture with the Munda Gold Project.” said Mark English.
page | 1
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
1.0 PRINCIPAL ACTIVITIES
The first stage of open pit mining at Jeffreys Find was completed during the quarter. Ore from
the Stage One pit is being processed in two campaigns at the Greenfields plant in Coolgardie
with the second campaign nearing completion.
Preparations for a 10m x 10m grade control program at Munda are underway following the
completion of a Scoping Study into open pit mining of the Munda gold deposit reported in the
previous quarter.
Auric withdrew from an option agreement over the Chalice West project to focus on nearer
term financial objectives, particularly the Jeffreys Find and Munda Gold Projects.
2.0 JEFFREYS FIND PROJECT
The first stage of Mining at Jeffreys Find has been completed with over 180,000t of ore
extracted. All of the ore has been hauled to the Greenfields Mill and the second and final
processing campaign for the first stage is nearing completion.
Figure 1. Jeffreys Find Mine Site at completion of the stage 1 pit – note Run of Mine ore stockpiles
lower right.
page | 2
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
In the first campaign, 36,180 dry tonnes were processed at a reconciled head grade of 1.58g/t
for 1,721 ounces gold and a calculated recovery of 93.04%. The head grade in turn reconciles
well with estimated mine grade for the ore parcel.
The second campaign commenced on 10 September 2023 and is expected to be completed
early November 2023.
Figure 2. Auric Directors: Mark English, Steven Morris and John Utley at Perth Mint Refinery, holding
Jeffreys Find gold bars. (Photo courtesy: Perth Mint)
3.0 MUNDA GOLD PROJECT
Preparations for a grade control drilling program at the Munda Gold Project are well advanced
with approximately 380 holes to be drilled on a 10m x 10m pattern for 11,500 metres. The drill
pattern covers the starter pit defined in the Scoping Study within a larger area of near surface
mineralisation (Figure 3). Kalgoorlie-based Total Drilling Services have been contracted with
drilling to start on or about 1 November 2023.
The Munda Gold Project is at an early development stage with a recent Scoping Study for
open-pit mining and third-party toll treatment returning a Production Target for the Project at
gold prices from AUD$2,400 to AUD$2800/oz, ranging from approximately:
•
1.67Mt at 2.2g/t producing 112.0koz gold; to
•
2.18Mt at 1.9g/t producing 129.1koz gold.
page | 3
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
Figure 3. Munda optimised pit outline, starter pit and existing trial pit with proposed grade control drill
holes.
The adopted base case scenario at AUD2,600/oz details mining approximately 1.72Mt at 2.2g/t
to produce 114.7 ounces gold and generate an undiscounted accumulated cashflow surplus of
$76.9M.
Following from the positive outcome of the Scoping Study, Auric will undertake more detailed
mine planning and mine permitting based on the following activities:
•
An updated resource model and definition of an optimal grade control drill pattern for
mining utilising results from the 10m x 10m resource definition and grade control program.
•
Geotechnical and hydrological studies.
•
Further metallurgical testwork.
•
A topographic survey.
•
Waste rock characterisation.
•
Fauna and vegetation surveys.
•
Updated cost estimates for grade control, mining, drill and blast, and haulage.
page | 4
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
4.0 CHALICE WEST PROJECT
Auric withdrew from the option agreement with Mineral Business Development Pty Ltd for the
Chalice West Project tenements, E15/1801 and E63/2199 during the quarter.
5.0 HERITAGE
A heritage survey was completed in collaboration with Marlinyu Ghoorlie representatives,
within Spargoville tenements E15/1688 and E15/1689. The survey covered proposed aircore
and RC drill traverses within those tenements.
6.0 SAFETY
There were no alternate duty injuries (“ADI”) and no medically treated injuries (“MTI”) reported
during the September quarter. There were no lost time incidents (“LTI”) recorded during the
September quarter.
7.0 ASX COMPLIANCE AND IPO
7.1 Compliance Statement
The information in this report that relates to exploration results, estimates of Mineral Resources
and to the Scoping Study for Munda is extracted from the Company’s following ASX
announcements which are available to view on the Company’s website:
ASX Announcements included in the September 2023 Quarter
Date
Details
25 August 2023
First Stage Mining and Processing Completed – All Gold Sold.
1 September 2023
Chalice West Option Agreement.
10 October 2023
4,300 ounces of gold produced from second campaign at Jeffreys
Find Gold Mine. Toll milling continues.
19 October 2023
First Cash Expected in Week Commencing 23 October 2023.
Jeffreys Find Stage One Production Passes 7,700 Ounces.
25 October 2023
First Cash for Auric as it Banks Initial $2.2 Million from Jeffreys
Find Gold Mine.
27 October 2023
Grade Control Drilling at Munda Gold Project.
ASX Announcements referred to from previous quarters
28 June 2023
Positive Scoping Study for Munda Gold Project.
page | 5
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements and, in the case of estimates of
Mineral Resources and Scoping Study, that all material assumptions and technical parameters
underpinning the estimates and underpinning the Production Target, or the forecast financial
information derived from the Production Target in the relevant market announcements continue
to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Persons’ findings are presented have not been materially modified from
the original market announcements.
7.2 Forward Looking Statements
This Announcement contains forward-looking statements which are identified by words such
as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’, ‘expected’, or ‘intends’ and other
similar words that involve risks and uncertainties. These statements are based on an
assessment of present economic and operating conditions, and on a number of assumptions
regarding future events and actions that, as at the date of this Announcement, are considered
reasonable. Such forward-looking statements are not a guarantee of future performance and
involve known and unknown risks, uncertainties, assumptions and other important factors,
many of which are beyond the control of the Company, the Directors and the management.
The Directors cannot and do not give any assurance that the results, performance or
achievements expressed or implied by the forward-looking statements contained in this
announcement will actually occur and investors are cautioned not to place undue reliance on
these forward-looking statements.
8.0 TENEMENTS
See attached Schedule 1 which lists the mining tenements held at the date of this
announcement, their location and equity ownership.
8.1 Tenements Applications
Two tenements applications were lodged during the quarter:
Tenement
Application Date
E15/2042
29 September 2023
E15/2043
29 September 2023
8.2 Granted Tenements
Two tenements were granted during the quarter:
Tenement
Grant Date
E15/1949
8 September 2023
E15/1950
8 September 2023
page | 6
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
8.3 Tenements Relinquished
Four tenements or interests therein were relinquished during the quarter:
Tenement
Relinquished Date
E15/1801
1 September 2023
E63/2199
1 September 2023
E15/1505¹
28 July 2023
E15/1507¹
28 July 2023
¹ Gold rights only. Interests relinquished to Widgie Nickel Ltd (“WIN”).
8.4 Farm-in or Farm-out agreements
Auric is not party to any Farm-in or Farm-out agreements.
9.0 RELATED PARTY PAYMENTS
The Company paid salaries, superannuation, annual leave and other employment entitlements
to Directors of $125,000. The Company also paid $8,000 to Director-related parties of the
Company. These costs are included in administration costs and working capital except when
technical staff are working in the field. Those direct costs are allocated to the tenements and
projects.
page | 7
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
Figure 4. Auric’s projects in the Widgiemooltha-Norseman area.
page | 8
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
Auric Mining
Auric Mining was established to explore for and develop gold and other mineral deposits in the
Widgiemooltha-Norseman area, of Western Australia.
Auric has three projects (Figure 4):
The Widgiemooltha Gold Project & Munda Gold Project
The Widgiemooltha Gold Project (“WGP”) located near the town of Widgiemooltha combines
21 tenements, including 5 granted Mining Leases. All tenements are highly prospective for gold
mineralisation. This includes the Munda Gold Project. The combined Inferred and Indicated
Mineral Resource estimate for Munda at 0.5g/t cut-off is 4.48Mt @ 1.38g/t Au for 198,700oz
gold 1.
The Jeffrey Find Project
The Jeffreys Find Project is 50km northeast of Norseman and combines 2 tenements including
1 granted Mining Lease. It holds the Jeffreys Find gold deposit with gold mineralisation
extending from the surface to at least 110m in vertical depth and thickest near the surface. The
deposit is currently being mined in partnership with BML Ventures Pty Ltd.
The Spargoville Project
The Spargoville Project is located 30km north of Widgiemooltha and combines 8 tenements. It
lies in the same stratigraphy, along strike from the Wattle Dam Gold Mine which produced
268,000oz gold @ 10g/t from 2006-13; one of Australia’s highest-grade mines at that time.
Summary
Auric now has tenements covering 282km². Auric holds the rights to gold on all tenements,
including those held in the name of Mt Edwards Critical Metals Pty Ltd. Further, at Munda it
holds all mineral rights except nickel and lithium. For all other tenements, excluding those held
in the name of Mt Edwards Critical Metals Pty Ltd, Auric holds 100% of all mineral rights.
This announcement has been approved for release by the Board.
Corporate Enquiries
Follow our communications
Mark English
Managing Director
Auric Mining Limited
+61 409 372 775
menglish@auricmining.com.au
Subscribe: auricmining.com.au
1 (ASX:AWJ): Announcement 28 January 2022: Increase in Estimated Resources at Munda and Reclassification from Inferred to
Indicated.
page | 9
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Auric Mining Limited (ACN 635 470 843)
SCHEDULE 1
The following table lists the mining tenements held at today’s date and their location.
Tenement
Project
Location
Status
Registered Holder
Mineral Rights
Widgiemooltha
M15/74
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/75
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/698
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/699
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/87
Widgiemooltha
WA
Live
Widgie Gold
100% All Minerals except
Ni, Li
E15/1553
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1576
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1583
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6092
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6387
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6570
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6612
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6362
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1749
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
L15/414
Widgiemooltha
WA
Live
Widgie Gold
Infrastructure
E15/1949
Widgiemooltha
WA
Live
Widgie Gold
100% All minerals
E15/1950
Widgiemooltha
WA
Live
Widgie Gold
100% All minerals
E15/2042
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
E15/2043
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
P15/6539
Widgiemooltha
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
P15/6808
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
M63/242
Jeffreys Find
WA
Live
Jeffreys Find
100% All Minerals
L63/97
Jeffreys Find
WA
Live
Jeffreys Find
Infrastructure
E15/1689
Spargoville
WA
Live
Spargoville Minerals
100% All Minerals
E15/1665
Spargoville
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
E15/1688
Spargoville
WA
Live
Mariner Mining
100% All Minerals
P15/5905
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/5906
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6408
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6758
Spargoville
WA
Pending
Spargoville Minerals
100% All Minerals
M15/1899
Spargoville
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
Jeffreys Find
Spargoville
page | 10
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 October 2023
Tenement
Auric Mining Limited (ACN 635 470 843)
Project
Location
Status
Registered Holder
Mineral Rights
E63/2330
Chalice West
WA
Pending
Chalice West
100% All Minerals
E15/1945
Chalice West
WA
Pending
Chalice West
100% All Minerals
E15/1978
Chalice West
WA
Pending
Chalice West
100% All Minerals
E15/1979
Chalice West
WA
Pending
Chalice West
100% All Minerals
P15/6786
Chalice West
WA
Pending
Chalice West
100% All Minerals
Chalice West
page | 11