Quarterly Activities Report
Released
Released
Announcement PDF
A S X A nn oun c em en t
auricmining
28 July 2023
ASX: AWJ | ACN 635 470 843
Quarterly Activities Report
For the Quarter Ended 30 June 2023
Highlights
•
Over 100,000 tonnes of gold ore mined at Jeffreys Find as of 20 July 2023 with
more than 24,000 tonnes delivered to the Greenfields Mill, Coolgardie.
•
Greenfields to complete processing of initial batch of approximately 30,000
tonnes by 31 July 2023.
•
Maiden gold pour is imminent.
•
Scoping Study for open-pit mining and toll treatment of the Munda Gold Deposit
shows robust project economics for a wide range of gold prices.
•
The Munda Production Target at a Base Case of AUD$2,600 per ounce gold
price is approximately:
•
•
1.716Mt at 2.2g/t producing 114.7koz gold recovered and an
undiscounted accumulated cash surplus of $76.9M
Mining at Munda is contemplated over an approximately 3-year period (13
calendar quarters).
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to report on its
activities during the 30 June 2023 Quarter and up to the date of this announcement.
Mark English, the Managing Director commented as follows:
“During the quarter, our main focus was the steps required to start mining at Jeffreys
Find. It is a milestone achievement for the Company and our shareholders to be
mining. The toll milling has commenced, post end of the quarter. We will in the
foreseeable future attain one of the Company’s key ambitions and objectives in
becoming a gold producer. Generating cash within the next six months with negligible
downside risk to Auric is a terrific result for us and our shareholders.” said Managing
Director Mark English.
page | 1
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
1.0 PRINCIPAL ACTIVITIES
The rapid development of the Jeffreys Find gold deposit continued during the quarter
with the start of open-pit mining and delivery of first ore to the Greenfields gold
processing plant in Coolgardie.
In the same period, a scoping study was completed for open-pit mining and tolltreatment of the Munda gold deposit. The study adds impetus to Auric’s plans for
growth through development of existing resources.
2.0 JEFFREYS FIND PROJECT
Mining began at Jeffreys Find in early May with more than 100,000 tonnes of gold ore
mined by 20 July 2023. More than 24,000 tonnes had been transferred to the
Greenfields mill in Coolgardie by that date and the first gold pour is imminent.
Reconciliation of the gold recovered from the first processing parcel of approximately
30,000 tonnes with the grade control model will greatly add to confidence in the
project economics.
Figure 1. Mining at Jeffreys Find.
Over the coming months BML Ventures Pty Ltd of Kalgoorlie, Auric’s mining joint venture
partner, will mine and haul between 150,000 tonnes and 180,000 tonnes of ore to
complete the first stage of the project.
After completing the initial pit, the partners will subtract all costs before splitting the
surplus proceeds on a 50:50 basis. This will provide Auric with a substantial cash boost,
expected towards the end of the September/October of 2023.
page | 2
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
Auric intends to use surplus cash generated from Jeffreys Find to continue
development of the Munda Gold deposit at Widgiemooltha and continue with
broader exploration.
Figure 2. Jeffreys Find ore zone is up to 20m wide near surface.
The total project life is short and final mining is expected to be completed by the end
of 2024. The project initially budgeted for revenue at a gold price of AUD$2,600/ounce.
A surging gold price has now placed the Company in a favourable position.
3.0 MUNDA PROJECT
A Scoping Study for open-pit mining and third-party toll treatment of the Munda gold
deposit, (Munda or the Project) was reported to ASX on 28 June 2023.
The study was undertaken by Minecomp Pty Ltd, a Kalgoorlie-based consulting firm
with extensive experience evaluating mining projects in the Eastern Goldfields.
A single third-party processing plant operating under a toll treatment agreement was
considered. This processing plant is located approximately 82km from Munda. A range
of outcomes were defined based on gold price.
The Production Target generated in the Scoping Study at gold prices from $2,400AUD
per ounce to $2,800AUD per ounce, ranges from approximately:
•
•
1.67Mt at 2.2g/t producing 112.0koz gold, to
2.18Mt at 1.9g/t producing 129.1koz gold.
The Production Target generates an undiscounted accumulated cash surplus after
payment of all working capital costs, but excluding pre-mining capital requirements,
based on the above gold prices of approximately $54.7M to $101.4M.
page | 3
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
Mining is contemplated over an approximately 3-year period (13 calendar quarters).
Project sensitivities were examined for a range of gold prices demonstrating that
project economics are robust with positive outcomes returned for gold prices ranging
from AUD$1,000 to AUD$4,000 per ounce.
A Base Case at AUD$2,600 per ounce gold price was used to assess the components
of Inferred and Indicated Mineral Resources. The Production Target at the Base Case
is approximately:
•
1.716Mt at 2.2g/t producing 114.7koz gold recovered and an undiscounted
accumulated cash surplus of $76.9M
These Mineral Resource tonnes are mined in conjunction with approximately 7,364k
BCM of sub-grade and waste representing a stripping ratio of 11.5:1.
Approximately 84% of the total Production Target resulting from the Scoping Study is
based on Indicated Mineral Resources, and approximately 16% is based on Inferred
Mineral Resources. Although some of the Inferred Mineral Resources occurs at shallow
depths, there is sufficient, easily mined and readily accessible Indicated Mineral
Resources within the optimum shell to enable the impact of any Inferred Mineral
Resources to be insignificant.
The AUD$2,600 pit crest and corresponding cross section are shown in Figures 3 and 4.
Figure 3. Munda Gold Deposit Optimised Pit Plan Over Geology.
page | 4
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
Figure 4. Munda Gold Deposit Cross Section Through Optimised Pit (refer Figure 3).
Pre-mining capital and start-up costs are estimated to be approximately $0.8M to
$1.7M.
Working capital requirements of approximately $3.9M to $8.1M were estimated based
on a Stage 1 starter pit design which would have a mine life of less than 3 months. The
Production Target for the Stage 1 design pit is estimated to comprise the following:
•
Approximately 98.7kt @ 2.4g/t for 7.2koz gold recovered and an undiscounted
accumulated cash surplus of $7.3M. The corresponding stripping ratio is 5.4:1.
Material Assumptions and Modifying Factors
The Scoping Study, and Production Targets derived from the study are based on the
material assumptions and modifying factors described in the following notes. They are
further detailed in the JORC (2012) Table 1 appended to the announcement
(ASX:AWJ) 28 June 2023; Positive Scoping Study for Munda Gold Project. 1
•
The Multiple Indicator Kriged (MIK) resource estimate model was provided by FSS
International Consultants (Australia) Pty Ltd. At a 0.5g/t cut-off, the resource
estimate was 2:
1 (ASX: AWJ) 28 June 2023; Positive Scoping Study for Munda Gold Project
2 (ASX; AWJ) 28 January 2022: Increase in Estimated Resources at Munda and Reclassification from Inferred to Indicated
page | 5
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Cut-off
(Au g/t)
0.5
Resource
Category
Indicated
Inferred
Total
Auric Mining Limited (ACN 635 470 843)
Tonnes
(million)
3.68
0.80
4.48
Au
(g/t)
1.38
1.39
1.38
Au
(koz)
163.1
35.6
198.7
Table 1. Munda – January 2022 Mineral Resource Estimate at 0.5g/t cut-off.
•
The resource estimate model is a recoverable resource model and as such, no
additional allowances are made for mining dilution and ore loss.
•
Auric does not hold the nickel or lithium rights at Munda and there is some
coincident gold and nickel mineralisation. In keeping with a conservative
approach, zero gold grade was assigned to any gold ore blocks which graded
1% nickel or greater. The assumption is that any >1% nickel blocks mined as a
consequence of mining the production target would be placed on a separate
ore stockpile and no gold recovered from that stockpile. This approach excluded
approximately 51,000t at 2.2g/t for 3.6koz gold from the optimal AUD $2,600 pit.
•
Bulk densities were determined by water displacement method on drill core. The
bulk densities as incorporated into the supplied resource estimate model were:
Regolith
Oxidised
Transitional
Fresh
Table 2. Munda – Bulk Densities.
Bulk Density
2.20
2.50
2.75
A bulk density dataset that accounts for spatial, lithological and weathering
variations continues to be built and will lead to further refinement of the bulk
density values used. At this stage, the bulk density values used in the resource
estimates are considered conservative.
•
The gold price of AUD $2,600/oz is also considered conservative. It was selected
for the base case with reference to the gold price through 8 months from
November 2022 to June 2023 over which period the minimum price was
AUD$2,599 per ounce and the maximum was AUD$3,056 per ounce. Sensitivity to
gold price was assessed by evaluating the Mineral Resources for a gold price
range of between AUD$1,000/oz and AUD$4,000/oz in $100 increments.
•
The study includes the Western Australian State Government royalty of 2.5% of
revenue applied to gold production in the state. No other royalties apply to
Munda.
•
The Scoping Study incorporates a metallurgical recovery of 95% regardless of
regolith. These figures are based upon metallurgical test work completed for
Auric by Upside Metallurgy and announced to the ASX on 11 May 2022 3.
3 (ASX: AWJ) 11 May 2022; Exceptional Result with Munda Preliminary Metallurgical Testwork Returning 96.57% Gold Extraction
page | 6
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
•
No allowances have been made for capital and start-up costs in the optimisation
analysis. The capital and start-up costs are comprised of but not limited to the
costs associated with pre-mining grade control and resource definition drilling,
mobilisation, site establishment, pre-mining earthworks, access and haulage
road construction and demobilisation. These costs were estimated by
Minecomp, on the basis of considerable current experience in the region and
first-pass evaluations of the specific requirements for Munda. Resource definition
drilling and pre-mining grade control associated with detailed design and mining
of a stage 1 pit forms a substantial component of the costs.
•
Operating mining costs, including grade control costs are based on Minecomp’s
cost database for comparable projects reflecting extensive recent experience
of comparable projects. They reflect conventional truck and excavator open pit
mining, utilising nominally Caterpillar 777 (approximately 90 tonne capacity)
dump trucks and associated ancillary equipment.
•
No minimum mining widths were applied, however, the resource model assumes
a 5m minimum width.
•
Overall wall angles of 45 degrees were deemed applicable for first pass
optimisation in similar geological settings and including perceived ramp
configurations applicable to a 777-haulage truck mining fleet. Further
geotechnical investigations are required and will be undertaken as study work
progresses.
•
Haulage costs reflect approximate costs of ore cartage from Munda to a
processing plant located approximately 82km from Munda along existing roads
after exit onto the Coolgardie-Esperance Highway.
•
Processing and administration costs reflect Minecomp’s extensive recent
experience of comparable projects, and Auric’s preliminary assessment of
processing costs for toll-treating. Auric has not entered into any formal
agreement, or detailed discussions with processing plant operators.
•
The Scoping Study assumes open pit mine development comprises several
mining stages developing an ultimate pit reflecting the base case optimal pit
shell generated by the Scoping Study. This optimal pit shell extends over a length
of approximately 690m, width of approximately 350m and reaches a maximum
depth of approximately 120m. The Stage 1 pit, for which Minecomp produced a
first-pass pit design extends over approximately 150m in length to a maximum
depth of around 30m.
•
The proposed mining area lies within Mining Lease M15/87. A Miscellaneous
Licence, L15/414, for an ore haulage road has been granted. The ore haulage
road will link Munda to the Coolgardie-Esperance Highway, a distance of
approximately 4.8km.
page | 7
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
•
Fauna and flora studies as well as surface and groundwater studies and a
detailed topographic survey will need to be completed as a component of
permitting applications and statutory approval for mining.
•
The proposed mining operation will not include any on-site storage of tailings.
Waste rock at Munda is typically non-acid forming. There is not expected to be
any environmental impacts of significance.
•
Two heritage surveys were completed prior to the 1999 development of the
Resolute trial pit and no heritage sites were recorded. The site will need to be
reassessed in terms of recent heritage legislation but there is no reason to expect
any issues in terms of heritage.
The cost parameters used for the study are considered to have an accuracy of +-35%.
Pre-mining costs ($1,000)
Capital and start-up costs
Mobilisation
Site establishment (offices, workshops etc)
Mining establishment, ore pad, waste dump
Haul road construction
Demobilisation
Total
$ 150
$ 350
$ 500
$ 100
$ 150
$1,250
Working capital costs ($1,000)
Mining
Grade Control
Haulage costs
Administration
Total
$2,570
$1,700
$1,428
$ 296
$5,995
Revenue parameters
Gold price per ounce
Western Australian State Government Royalty
Metallurgical recovery
$2,600
2.5%
95%
Summary of unit operating costs
Average mining costs per BCM (all material)
Mining (load, haul, dump)
Blasting
Ancillary extra costs
Rehabilitation
Total
$6.33
$2.80
$2.30
$0.18
$11.61
Costs per tonne of material processed
Grade Control
Haulage (82km)
Treatment
Administration
Total
$ 3.00
$14.48
$50.00
$ 3.00
$70.48
Table 3. Munda Scoping Study Material Assumptions.
page | 8
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
Study Results
The results of the study are positive and justify Auric committing to further work to refine
material inputs and enhance project economics.
4.0 HERITAGE
Auric maintains a good relationship with the two native title claimant groups in the
Widgiemooltha – Norseman area; Ngadju Native Title Claimant Group and Marlinyu
Ghoorlie Native Title Claimant Group.
5.0 SAFETY
There were no alternate duty injuries (“ADI”) and no medically treated injuries (“MTI”)
reported during the June quarter. There were no lost time incidents (“LTI”) recorded
during the June quarter.
6.0 ASX COMPLIANCE AND IPO
6.1 Compliance Statement
The information in this report that relates to exploration results, estimates of Mineral
Resources and to the Scoping Study for Munda is extracted from the Company’s
following ASX announcements which are available to view on the Company’s website:
ASX Announcements included in the June 2023 Quarter
(ASX; AWJ) 13 June 2023: First 30,000 Tonnes of Gold Ore Ready for Processing
(ASX; AWJ) 28 June 2023: Positive Scoping Study for Munda Gold Project
(ASX; AWJ) 11 July 2023: Mining at Jeffreys Find Maiden Gold Pour Only Weeks Away
(ASX;AWJ) 20 July 2023: Toll Milling Commenced from Jeffreys Find Gold Mine
ASX Announcements referred to from previous quarters
(ASX; AWJ) 28 January 2022: Increase in Estimated Resources at Munda and
Reclassification from Inferred to Indicated
(ASX: AWJ) 11 May 2022; Exceptional Result with Munda Preliminary Metallurgical
Testwork Returning 96.57% Gold Extraction
The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcements and,
in the case of estimates of Mineral Resources and Scoping Study, that all material
assumptions and technical parameters underpinning the estimates and underpinning
the Production Target, or the forecast financial information derived from the
Production Target in the relevant market announcements continue to apply and have
not materially changed. The Company confirms that the form and context in which
the Competent Persons’ findings are presented have not been materially modified
from the original market announcements.
page | 9
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
6.2 Forward Looking Statements
This Announcement contains forward-looking statements which are identified by
words such as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’, ‘expected’, or
‘intends’ and other similar words that involve risks and uncertainties. These statements
are based on an assessment of present economic and operating conditions, and on
a number of assumptions regarding future events and actions that, as at the date of
this Announcement, are considered reasonable. Such forward-looking statements are
not a guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions and other important factors, many of which are beyond the
control of the Company, the Directors and the management. The Directors cannot
and do not give any assurance that the results, performance or achievements
expressed or implied by the forward-looking statements contained in this
announcement will actually occur and investors are cautioned not to place undue
reliance on these forward-looking statements.
7.0 TENEMENTS
See attached Schedule 1 which lists the mining tenements held at the date of this
announcement, their location and equity ownership.
7.1 Tenements Applications
Two tenements applications were lodged during the quarter:
Tenement
Application Date
E63/2330
6 April 2023
P15/6808
11 April 2023
7.2 Granted Tenements
One tenement was granted during the quarter:
Tenement
Grant Date
L15/414
29 May 2023
7.2 Tenements Relinquished
Two tenements are in the process of being relinquished during the quarter:
Tenement
Note
E15/1505
Auric is in the process of handing back the
gold rights to WIN for minimal consideration
E15/1507
Auric is in the process of handing back the
gold rights to WIN for minimal consideration
7.4 Farm-in or Farm-out agreements
Auric is not party to any Farm-in or Farm-out agreements.
page | 10
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
8.0 RELATED PARTY PAYMENTS
The Company paid salaries, superannuation, annual leave and other employment
entitlements to Directors of $129,000. The Company also paid $16,000 to Directorrelated parties of the Company. These costs are included in administration costs and
working capital except when technical staff are working in the field. Those direct costs
are allocated to the tenements and projects.
Auric Mining
Auric Mining was established to explore for and develop gold and other mineral
deposits in the Widgiemooltha-Norseman area, of Western Australia.
Auric has four projects (Figure 5):
The Widgiemooltha Gold Project & Munda Gold Deposit
The Widgiemooltha Gold Project (“WGP”) located near the town of Widgiemooltha
combines 19 tenements, including 5 granted Mining Leases. All tenements are highly
prospective for gold mineralisation. This includes the Munda Gold Deposit. The
combined Inferred and Indicated Mineral Resource estimate for Munda at 0.5g/t cutoff is 4.48Mt @ 1.38g/t Au for 198,700oz gold 4.
The Chalice West Project
The Chalice West Project is adjacent to the Chalice Mine, a mine that produced
almost 700,000 ounces of gold and combines 7 tenements. It covers 534km², including
geology mirroring the Chalice Mine and is approximately 50km northwest of
Norseman.
The Jeffrey Find Project
The Jeffreys Find Project is 50km northeast of Norseman and combines 2 tenements
including 1 granted Mining Lease. It holds the Jeffreys Find gold deposit with gold
mineralisation extending from the surface to at least 110m in vertical depth and
thickest near the surface. The deposit is currently being mined in partnership with BML
Ventures Pty Ltd.
The Spargoville Project
The Spargoville Project is located 30km north of Widgiemooltha and combines 8
tenements. It lies in the same stratigraphy, along strike from the Wattle Dam Gold Mine
which produced 268,000oz gold @ 10g/t from 2006-13; one of Australia’s highest-grade
mines at that time.
Summary
Auric now has tenements covering 628km². Auric holds the rights to gold on all
tenements, including those held in the name of Mt Edwards Critical Metals Pty Ltd.
Further, at Munda it holds all mineral rights except nickel and lithium. For all other
tenements, excluding those held in the name of Mt Edwards Critical Metals Pty Ltd,
Auric holds 100% of all mineral rights.
4 (ASX:AWJ): Announcement 28 January 2022: Increase in Estimated Resources at Munda and Reclassification from Inferred to
Indicated.
page | 11
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
Figure 5. Auric’s projects in the Widgiemooltha-Norseman area.
Mark English
Managing Director
This announcement has been approved for release by the Board.
Further information contact:
Mark English
menglish@auricmining.com.au
page | 12
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Auric Mining Limited (ACN 635 470 843)
SCHEDULE 1
The following table lists the mining tenements held at today’s date and their location.
Tenement
Project
Location
Status
Registered Holder
Mineral Rights
Widgiemooltha
M15/074
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/075
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/698
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/699
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/87
Widgiemooltha
WA
Live
Widgie Gold
100% All Minerals except
Ni, Li
E15/1553
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1576
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1583
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6092
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6387
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6570
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6612
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6362
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1749
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
L15/414
Widgiemooltha
WA
Live
Widgie Gold
Infrastructure
P15/6539
Widgiemooltha
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
E15/1949
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
E15/1950
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
P15/6808
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
M63/242
Jeffreys Find
WA
Live
Jeffreys Find
100% All Minerals
L63/97
Jeffreys Find
WA
Live
Jeffreys Find
Infrastructure
E15/1689
Spargoville
WA
Live
Spargoville Minerals
100% All Minerals
E15/1665
Spargoville
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
E15/1688
Spargoville
WA
Live
Mariner Mining
100% All Minerals
P15/5905
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/5906
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6408
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6758
Spargoville
WA
Pending
Spargoville Minerals
100% All Minerals
M15/1899
Spargoville
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
Jeffreys Find
Spargoville
page | 13
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 28 July 2023
Tenement
Project
Auric Mining Limited (ACN 635 470 843)
Location
Status
Registered Holder
Mineral Rights
Chalice West
E15/1801
Chalice West
WA
Live
John Williams
100% All Minerals
E63/2199
Chalice West
WA
Live
Minerals Business Development
100% All Minerals
E63/2330
Chalice West
WA
Pending
Chalice West
100% All Minerals
E15/1945
Chalice West
WA
Pending
Chalice West
100% All Minerals
E15/1978
Chalice West
WA
Pending
Chalice West
100% All Minerals
E15/1979
Chalice West
WA
Pending
Chalice West
100% All Minerals
P15/6786
Chalice West
WA
Pending
Chalice West
100% All Minerals
page | 14
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
Share your feedback
Discover