Investor Presentation
Released
Released
Announcement PDF
1
Building a
Standalone Gold
Producer
RESOURCE GROWTH & REGIONALLY STRATEGIC MILL
1 3 N o v e m b e r 2 0 2 6
auricmining.com.au ASX : AWJ
2
● Western Australian-focused gold producer seeking to transition into an integrated gold mining
platform, with 628km² of prospective tenure and a growing portfolio of gold assets
● Munda Gold Mine provides a cornerstone production pathway, initially producing 25 – 40kozpa Au
with multi-year operation targeted to commence in Q4 2027
● 100% owner of the Burbanks Gold Processing Facility, provides fully permitted downstream
infrastructure to control processing and capture more of the mine-to-mill value chain, with
commissioning and first gold targeted for Q1 2028
● An initial Burbanks-Munda integrated study has shown compelling economics with significant upside
assessing only the Munda open-pit while the resource remains open along strike and at depth
● Recent acquisitions increase global resource to ~370,000oz gold4 with four operational areas with
strong resource growth and mining potential (subject to completion)
● Demonstrated operating capability through successful mining at the Jeffreys Find and the Munda
Starter Pit operations, which have generated a combined A$176m of gold sales
Auric at a glance
Building an integrated gold mining and processing platform in Western Australia’s Eastern Goldfields
1: Proforma (30 September 2026 + Placement Funds) - excludes the cash consideration paid on 7 October 2026 for Union Jack Acquisition (A$6.5m)
2: Proforma including Placement Shares (pre-issue of shares for Union Jack acquisition (12.5 million))
3: Proforma @ Placement Price - undiluted market capitalisation 4: Pro-forma resource number, assuming completion of Iron Maiden and conversion of JORC resources
2
~A$49m
Cash 1
~280m
Shares on issue 2
~A$52m
Market Cap 3
1. Iron Maiden project is subject to Completion
3
A Board with a track record of successful gold
discovery, development and production
Experienced leadership team
Steven Morris
Founding Non-Executive Chairman
• Steven has over 25 years’ experience in financial markets, including senior roles at Patersons Securities, Intersuisse,
Peloton Shareholder Services and the Little Group. He served nine years on the board of the Melbourne Football Club
and has held directorships at De Grey Mining (ASX: DEG) and Purifloh (ASX: PO3). He is currently a Non-Executive
Director of EverGold Minerals (ASX: EG1).
Mark English
Founding Managing Director
• Mark is a Chartered Accountant and experienced resources executive with over 45 years’ experience across the
resources sector and corporate services. As co-founder and Managing Director of Auric, he led the company to its ASX
listing and is responsible for strategy, financial management, corporate development and acquisitions.
Gareth Solly
CEO & Executive Director
• Gareth has more than 25 years’ experience in the mining industry, predominantly in gold. He has held senior roles at
Silver Lake Resources and Saracen Minerals and was the founding Managing Director of Black Cat Syndicate, leading its
transition from a junior explorer to a multi-asset gold producer.
John Utley
Founding Technical Director
• John is a geoscientist with over 40 years’ experience in gold exploration and mining across Australia, South America,
Papua New Guinea and Canada. He was Chief Geologist at Atlantic Gold Corporation and previously led exploration at
Plutonic Resources’ Darlot Gold Mine, including during the discovery and development of the 2.3Moz Centenary
deposit.
Scott Bailey
Processing Manager
• Scott has extensive experience in Western Australian gold processing, including senior roles at Black Cat Syndicate,
Westgold Resources and KCGM. At Black Cat, he played a key role in the acquisition and recommissioning of the
Lakewood processing plant and the ahead-of-schedule restart of the Paulsens Gold Mine.
4
Proven execution
capability and relevant
management
● Auric has successfully mined and monetised Jeffreys Find and the Munda Starter Pit, demonstrating ability to convert deposits into cash
● High confidence in Munda – Starter Pit provided operating-scale validation & reduced uncertainty, with gold recovered 46% above Reserve estimate
● Gareth Solly and Scott Bailey bring relevant and recent WA gold development, plant restart and operating experience
Brownfield advantage
at Burbanks
● Brownfield redevelopment follows a proven growth pathway of Australian gold producers – analogous with BC8, SLR, RMS, NST and EVN startups
● Permitted 180ktpa processing facility with connected power, water licence, bitumen access, mining leases and established tailings infrastructure
● New 600ktpa CIL circuit planned on existing footprint, with key infrastructure designed for future expansion to ~1.2Mtpa
Munda underwrites a
defined path to owner-
operated production
● Munda provides initial feed for Burbanks, with the base case recovering 141koz over ~5 years at 25-40kozpa
● The integrated development moves Auric to control of its own processing and cash flow, targeting first gold in Q1 2028
Attractive base-case
economics and a strong
funding base
● The study outlines A$437m LOM EBITDA, AISC of A$2,843/oz and a ~2.3-year payback at A$5,750/oz gold
● Auric’s proforma A$49m cash1 balance provides a meaningful starting contribution toward the A$145m peak funding requirement
Material Munda
resource and mine-life
upside
● The current study incorporates only the Munda open pit, while mineralisation remains open along strike and at depth
● Resource extension, grade-control and geotechnical drilling are planned to further improve grade confidence and support estimation of Ore Reserves
Regional growth and
consolidation platform
● Auric controls a substantial Eastern Goldfields portfolio containing multiple potential future ore sources within trucking distance of Burbanks
● New discoveries, growing resources, M&A and third-party deposits provide pathways to extend mine life and support eventual 1.2Mtpa expansion
● Acquisition of Union Jack and Iron Maiden increase global gold resources to ~370,000oz, and add multiple potential mining fronts
Investment highlights
Brownfield projects rapidly progressing towards production
1: Proforma cash (30 September 2026 + Placement Funds ) - excludes the cash consideration paid on 7 October 2026 for Union Jack Acquisition (A$6.5m)
5
• Eastern Goldfields gold processing at capacity, more local capacity urgently required
• Multi-year approval timeframes deter new mill construction, with Brownfield sites
expediting years of Greenfields approvals being scarce and highly valuable
• Re-establishing Burbanks creates a long-life, monetisable asset in tier-one province
• Multiple companies with millions of ounces in resources within 200km of Burbanks,
actively pursuing toll treatment
• Auric uniquely positioned to provide processing options to the growing pipeline of
stranded projects
Burbanks – regionally strategic infrastructure
Regional mill capacity is under pressure with multiple gold projects without committed processing arrangements
Company Project Mill Mill Capacity
FY26
Processing
FY26 Head
Grade
Resource
(Cont. Au)
Resource
grade
Munda Burbanks 0.18Mtpa 370koz1 1.28g/t
Norseman Phoenix 1.2Mtpa 1.1Mt 2.4g/t 4,685koz 3.3g/t
Beta Hunt Higginsville 1.6Mtpa (expanding) 1.8Mt 2.2g/t 5,392koz 2.2g/t
St Ives Lefroy 4.7Mtpa 4.4Mt 2.5g/t 3,364koz 3.6g/t
Mount Monger Randalls 1.3Mtpa 1.3Mt 2.0g/t ~3,583koz ~3.6g/t
Kal East Lakewood 1.2Mtpa (expanding) ~1.2Mt ~1.6g/t 1,217koz ~2.1g/t
Coolgardie Three Mile 1.2Mtpa ~1.4Mt ~1.9g/t 2,680koz 1.87g/t
Mungari Mungari 4.2Mtpa 4.1Mt 1.9g/t 7,200koz 1.31g/t
Davyhurst Davyhurst 1.2Mtpa (expanding) 1.3Mt 2.9g/t 3,690koz 2.4g/t
Processing status of regional processing plants reflects public disclosures as of November 2026 (see peer comparison sources in appendix). This slide is for illustrative purposes only.
1: Pro-forma resource number, assuming completion of Iron Maiden and conversion of JORC resources
1
6
Burbanks processing platform & infrastructure
Established power, water, access and tailings infrastructure support redevelopment as a 600ktpa processing facility
180 Ktpa
600 Ktpa
1.2 Mtpa
$138m
Scalable plant, designed
for expansion to 1.2 Mtpa
A brownfield restart that leverages existing plant infrastructure for a low CAPEX pathway to owner-operator production boasting expansion potential from a
600ktpa to a 1.2 Mtpa CIL facility supporting growth beyond the current Munda mine plan
Infrastructure expansion (including Plant & TSF)
100% owned plant
180ktpa CIL plant 9 km from Coolgardie, acquired for
A$4.4 million in September 2025; front end
infrastructure recently acquired for $1.2 million1
Brownfield operation with near-term restart pathway,
with a clear accelerated development timeline
Permitted
Operating history in processing gold, with granted
mining and infrastructure leases
>130 years
Three-phase grid power, water licenses and bitumen
road access
Connected
Including tailings storage facility, water bores and
borefields, shedding and administrative facilities etc
Pre-existing
infrastructure
1: Refer AWJ ASX announcement 16 September 2026
7
Burbanks-Munda integrated platform
Integrated mine-to-mill strategy allowing Auric to capture and control the full gold value chain
● Initial open-pit plan mines 2.8 Mt @1.75 g/t over 2.7 years
● Geotechnical drilling currently underway to calculate Ore Reserves
● Mining using conventional open pit methods (200t/120t dig fleets)
● ~87km haul via sealed road to Burbanks processing facility
Munda Gold
Mine
● Initial processing rate of 600ktpa, scalable to 1.2Mtpa
● Conventional CIL processing at 89.5% recovery
● Regional processing capacity in the Goldfields is scarce and
strategically valuable
Burbanks
● ~141koz gold recovered over 56 months (25 – 40kozpa)
● Bring on other deposits, including Union Jack, Lindsays & Iron Maiden
● Capitalise on new opportunities - stranded deposits & acquisitions
Gold
production
8
Munda Open Pit Unit Result
Mineralised Material Mined Mt 2.77
Grade Mined g/t Au 1.75
LOM Contained Gold
Production
koz 155
Strip Ratio W:O 11:1
Burbanks Processing
ROM Processed Mt 2.84
Feed Grade g/t Au 1.73
Recovery % 89.5
LOM Gold Produced koz 141
Average annual production kozpa 25 - 40
Financials
Gold Price A$/oz 5,250 5,750 6,250
Gross Revenue A$M 742 812 883
AISC A$M 400 402 404
AISC A$/oz 2,830 2,843 2,857
Pre-production Capital A$M 138 138 138
Peak funding requirement A$M 147 145 145
Payback years 2.5 2.3 2.1
1.25 g/t
1.58 g/t
1.36 g/t
1.58 g/t 1.55 g/t
1.67 g/t
1.48 g/t 1.53 g/t
1.93 g/t
2.14 g/t
1.71 g/t
-
0.50
1.00
1.50
2.00
2.50
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11
Quarterly Ore Mined Tonnes and Grade by Classification
Inferred
Indicated
Total Grade
Integrated Burbanks-Munda study outcomes
1: Refer ASX announcement 27 July 2026
Production profile & capex 1
Integrated scoping study outlines positive economics and a short payback period
33
40
83
- -
25
32
40
34
10
-
20
40
60
80
100
Year 1* Year 2 Year 3 Year 4 Year 5
Ounces Mined and Gold Produced
Mined Ounces (koz) Gold Produced (koz)
Study outcomes1
94.3
35.8
7.5
Pre-production capital (A$m)
Processing Plant (EPCM)
Processing related owners costs
Mining related owners costs
~$138m
tonnes grade
Revenue $M 145.9 184.6 229.2 195.2 57.3
Sus. cost $M (112.5) (120.9) (86.5) (48.0) (33.8)
AISC $/oz 4,290 3,765 2,169 1,414 3,390
EBITDA $M 33.4 76.9 153.8 149.2 23.5
Grow production by
mining Union Jack &
Iron Maiden
9
• Initial study includes only Munda open pit (155koz of Munda’s MRE of 191koz)
• Munda remains open along strike and at depth with ongoing RC drilling targeting
potential resource extensions and ~90,000m of GC drilling underway
• Recent high-grade intercepts from drilling include:
Hole Type Length (m) Grade (g/t Au) From (m)
Grade Control
14 115.67 21
14 14.51 11
10 40.31 35
15 5.56 61
4 14 91
9 7.82 171
Current resource
46 8.40 102
17 17.65 53
13 14.62 60
11 16.51 72
19 9.29 111
18 9.09 96
6 26.98 70
5 31.23 46
8 16.07 40
6 20.44 94
Western extension 4 10.49 461
Munda growth and study upside
Material exploration upside remains around existing large economic resource
Multiple +100-gram x meter intercepts materially above the MRE grade
1: Refer ASX announcement 24 September 2026
10
Union Jack - 15km from Burbanks
Recent acquisition significantly increases mineral inventory and provides second mining area
• Granted mining/prospecting leases, 15km from Burbanks
• Compelling near term, open pit mining opportunity with potential to extend
Burbanks production
• Extensive historical workings evident across the project
• Minimal recent exploration with drilling only recently commenced
• Strong shallow mineralisation in an area of prolific open pit mining
• Current Inferred Mineral Resource 3.12Mt @ 1.02g/t Au for 102,000oz
• Aiming to bring online as second production hub after completion of mining at
Munda using Auric’s in-house mining team
Tenement & Drill Hole Map
Transaction Overview 1
Project Overview
• $6.6M cash paid and tenement transfer underway
• 12.5M shares (at $0.24) to be issued subject to shareholder approval
• Additional milestone payments conditional on further resource growth
• 1% royalty on gold sold from M15/120
1:Refer “Union Jack Project Strategic Acquisition and Resource Upgrade” announcement 09 September 2026
11
Union Jack - A new shallow untouched deposit
Strong historical mining but exploration drilling only recently commenced
Tenement & Drill Hole Map
Immediate priority targets 1
Abundant thick, high-grade, shallow drilling 1
• Mineralisation remains open with strong growth potential
• Historical workings provide additional undrilled trends
• Extensive drilling program to commence in November 2026
• Targeting resource growth and upgrade ahead of mining studies
• Prepare resource for mining after Munda open pit
1:Refer “Union Jack Project Strategic Acquisition and Resource Upgrade” announcement 09 September 2026
• 17m @ 4.57 g/t from 24m,
• 15m @ 4.22 g/t from 62m,
• 5m @ 9.64 g/t from 10m,
• 10m @ 4.72 g/t from 19m,
• 13m @ 3.55 g/t from 9m,
• 5m @ 8.91 g/t from 19m,
• 12m @ 3.26 g/t from 39m,
• 11m @ 3.04 g/t from 11m,
• 2m @ 16.51 g/t from 17m,
• 10m @ 3.24 g/t from 26m,
• 2m @ 5.75 g/t from 191m, and
• 17m @ 3.99 g/t from 13m,
• 5m @ 12.21 g/t from 56m,
• 16m @ 2.99 g/t from 1m,
• 18m @ 2.61 g/t from 26m,
• 10m @ 4.54 g/t from 33m,
• 12m @ 3.49 g/t from 11m,
• 16m @ 2.26 g/t from 2m,
• 6m @ 5.56 g/t from 48m,
• 12m @ 2.7 g/t from 6m,
• 2m @ 6.54 g/t from 200m,
• 16m @ 4.34 g/t from 184m.
12
1: Cautionary Statement: these estimates are not reported in accordance with the JORC Code 2012; a Competent Person has not done sufficient work to classify them in accordance with the JORC Code 2012; it is possible that following evaluation and/or further exploration work the estimates may materially change and
hence will need to be reported afresh under and in accordance with the JORC Code 2012; nothing has come to the attention of Auric that causes it to question the accuracy or reliability of Accent’s estimates, but Auric has not independently validated them and is not to be regarded as reporting, adopting or endorsing them
2: Refer “Iron Maiden Gold Project” announcement 10 November 2026
Iron Maiden - A hard rock, high-grade gold asset
Strategic mining asset added to growing portfolio
• Granted and pending mining/prospecting leases, 180km from Burbanks
• Strategically located on the Mt Henry Shear between the multi-million-ounce Norseman and
Mt Henry fields
• Historical workings forming strong trends throughout the tenure
• Multiple mineralisation styles with only shallow testing are open, with strong growth potential
• Historical JORC 2004 Mineral Resource 1.4Mt @ 1.5g/t Au for 69,000oz1, 86% measured and
indicated
• Resource drilling, followed by mine planning activities to commence in early in 2027
Tenement Location
Transaction Overview 2
Project Overview
• Binding share sale agreement executed, to purchase Boomerang Mining Capital Pty Ltd (BMC),
which owns the Project
• A$1M cash consideration to BMC vendors and repayment of $3M loan funds used to acquire
the project
• Completion is subject to due-diligence
13
Iron Maiden - Underexplored and ready to grow
A strongly mineralised section of the prolific Mt Henry Shear
Deposit Map
And little drilling elsewhere – underexplored for decades.
Shallow high-grade historical results at Iron Duke and Surprise………..
1:Refer “Iron Maiden Gold Project” announcement 10 November 2026
• 19m @ 10.51g/t Au from 28m,
• 19m @ 8.22g/t Au from 36m,
• 18m @ 5.46g/t Au from 17m,
• 5m @ 13.49g/t Au from 24m,
• 22m @ 2.84g/t Au from 4m,
• 4m @ 14.80g/t Au from 0m,
• 12m @ 4.14g/t Au from 22m,
• 11m @ 4.19g/t Au from 45m,
• 7m @ 6.35g/t Au from 21m.
• 11m @ 22.00g/t Au from 39m,
• 10m @ 19.85g/t Au from 16m,
• 14m @ 8.96g/t Au from 26m,
• 27m @ 3.07g/t Au from 25m,
• 19m @ 3.53g/t Au from 28m,
• 7m @ 8.49g/t Au from 38m,
• 10m @ 5.58g/t Au from 6m,
• 9m @ 5.25g/t Au from 27m,
• 12m @ 3.75g/t Au from 44m, and
14
Multiple targets with exploration upside
Seven prospective gold projects spread over 628km2 in the heart of the Western Australian Goldfields
Lindsays Project
Spargoville Project Higginsville Tenements
• Near-term open pit opportunity 60km NE of Kalgoorlie
• Positioned as a major growth asset with strong potential
based on historical 2004 resources
• Longer-term underground mining potential
• Tenure matters expected to be resolved between Q4
2026 and Q2 2027
• High-grade exploration targets between major gold mines
(Wattle Dam and Spargos Reward)
• >700m gold anomaly with limited historical exploration
• Fugitive: 2m @ 10.69g/t Au from 81m; 7m @ 4.88g/t Au
from 45m; 1m @ 12.1g/t Au from 132m
• Significant exploration potential with AC and RC drilling
programs planned
• Multiple gold targets located near +1Moz Trident deposit
• Amorphous: 2m @ 10.27g/t Au from 28m; 2m @ 8.63g/t
Au from 22m; 5m @ 5.16g/t Au from 18m
• Foote’s Find: 3m @ 4.99g/t Au from 41m; 3m @ 4.65g/t
Au from 30m; 4m @ 3.06g/t Au from 31m
• Drill planning underway for priority targets
15
Calendar Year 2026 2027 2028
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
Studies & Growth
Starter Pit Mining
Resource Update
Initial studies
Acquire Union Jack - ~100,000oz
Acquire Iron Maiden - ~70,000oz 1
Drilling Programs
Munda Grade Control - de-risking ops
Munda Resource Growth
Union Jack Resource Growth and Infill
Iron Maiden Resource Growth
Approvals
Munda
Burbanks
Construction
Munda Infrastructure
Burbanks Construction
Burbanks Commissioning
Operations
Munda Mining
Haulage
Burbanks Processing
Execution timeline (Burbanks and Munda)
Burbanks commissioning and first gold is forecast for Q1, 2028
1: Iron Maiden resource is JORC 2004 and subject to completion
16
Resource and Reserve Growth
Ongoing Mine Life Extensions
Completion of Burbanks Gold Processing Plant
Establish Production and Rerate in-line with Producing Peers
Key Catalysts
Complete Iron Maiden Acquisition
Estimation of maiden Munda Ore Reserve
Discovery and Resource Growth Drilling
~90,000m Grade Control Programme
Secure all Project Approvals
Commencement of Open Pit Mining Q4 2027
Burbanks Commissioning & First Gold Q1 2028
Execute on Additional Inorganic Growth Opportunities
Key catalysts over next 15 months Medium Term Value Drivers
Regional Consolidation and M&A
Recent acquisition significantly increases mineral inventory and provides second mining area
Munda
Union Jack
Iron Maiden
Munda
Burbanks
Consistent Gold Production
Union Jack Resource Upgrade and Mining Study
17
Capital Raise
18
Equity Raising Summary
$M
$17m Placement and proposed $3m SPP1
Offer Size and Structure
The Company has commitments to raise approximately A$17.0 million by way of a two-tranche placement via the issue of approximately 91.9 million new fully paid ordinary
shares in the Company (“New Shares”) at A$0.185 (“Offer Price”) per New Share (the “Placement” or “Offer”):
• Tranche 1 to comprise approximately 47.0 million New Shares to raise approximately A$8.7 million utilising the Company’s available placement capacity under ASX Listing
Rules 7.1 and 7.1A (“Tranche 1”);
• Tranche 2 to comprise approximately 44.9 million New Shares to raise approximately A$8.3 million (“Tranche 2”). Tranche 2 will be subject to shareholder approval to be
sought at a General Meeting (“GM”), scheduled to be held on 14 December 2026 and is expected to settle after the GM, mid to late December.
The Company also intends to undertake a A$3m Share Purchase Plan (“SPP”) on the same terms as the Offer, subject to the granting of a waiver by ASX.
• The Offer will not be underwritten.
Placement Price
Fixed Placement price of A$0.185 per New Share, which as at 10 November 2026, represents a discount of:
• 24.5% to the last closing price of A$0.245 per Share;
• 21.5% to the 5-day volume weighted average price (VWAP) of A$0.236; and
• 20.2% to the 15-day VWAP of A$0.232;
Use of Proceeds
Proceeds from the Offer, alongside existing cash, will be used towards the following:
• Munda grade control and extensional drilling to grow the Mineral Resource;
• Extensional and resource growth drilling at the Union Jack Project;
• Acquisition costs associated with the Iron Maiden Project;
• Relocation of the recently purchased second hand crushing circuit and equipment for Burbanks; and
• General working capital and ongoing business development.
Syndicate
Canaccord Genuity (Australia) Limited (Canaccord), Taylor Collison Limited (Taylor Collison) and MA Moelis Australia Advisory Pty Ltd (Moelis) are Joint Lead Managers to the
Offer. Lazarus Advisory Pty Ltd (Lazarus) is Co-Manager to the Offer.
1: The SPP will not be underwritten and is subject to receiving ASX waiver approval.
19
Sources and uses of funds
Maintaining production timeline and growing resources Sources and Uses
Opening Cash (1 October 2026) 33.0
Placement Funds (net of offer costs) 16.0
Total Sources (excludes $3M SPP1) 49.0
Drilling (exploration, resource growth and operations) -16.2
Burbanks Development (maintains schedule for 1st gold) -13.6
Acquisitions (Union Jack and Iron Maiden, incl. duty) -11.6
Working Capital (including tax of $4M) -7.6
Total Uses (excludes $3M SPP1) 49.0
$M
Drilling Operations – 33%
• 90,000m of early grade control to derisk Munda restart
• Sterilisation drilling for Munda infrastructure
• Growth drilling at Union Jack, Iron Maiden and Munda
• Regional exploration including Spargoville and Higginsville
Burbanks Development – 28%
• Maintain development schedule to first gold
• Ongoing approval support and detailed engineering
• Dismantle and move crushing infrastructure to Burbanks
• Order long lead items
• Burbanks demolition works
Acquisitions – 24%
• Union Jack - 100,000oz
• Iron Maiden - 68,500oz (JORC Code 2004)
• Includes stamp duty
Working Capital – 15%
• Business continuity throughout 2027
• $4M income tax
• Operational readiness activities for production
Dual purpose funding targeting future production and near-term growth
1: The SPP will not be underwritten and is subject to receiving ASX waiver approval.
20
Key Dates for Placement and SPP
Key Event
SPP1 Record Date 5pm (AWST) Wednesday, 11 November 2026
Settlement of the New Shares issued under Tranche 1 of the Placement Tuesday, 17 November 2026
Allotment and application for trading of New Shares issued under Tranche 1 Wednesday, 18 November 2026
Lodgment of SPP booklet and opening of SPP Offer Thursday, 19 November 2026
Closing Date of SPP Offer 5pm (AWST) Tuesday, 15 December 2026
General Meeting of shareholders to approve the issue of New Shares under Tranche 2 Monday, 14 December 2026
Settlement of New Shares issued under Tranche 2 Mid to late December 2026
Allotment of New Shares issued under Tranche 2 and SPP shares Mid to late December 2026
Date and Time
Dual purpose funding targeting future production and near-term growth
Note: 1:The SPP timeline is subject to receiving ASX waiver approval. This timetable is indicative only and subject to change. Late applications will not be accepted. However, AWJ reserves the right to alter the dates, including the SPP Closing Date without prior notice, subject to the ASX Listing Rules, the Corporations Act 2001
(Cth) and other applicable law. The commencement of trading and quotation of SPP Shares is subject to ASX confirmation. Material changes to the timetable will be announced to ASX as soon as practicable.
21
$17m placement plus $3m SPP1 along with existing cash enables advancement of Burbanks and further exploration activities
Auric has delivered two successful mining campaigns, with Munda producing >46% more gold than forecast
Key takeaways
New management, Gareth Solly (CEO) and Scott Bailey (Processing Manager), bring relevant and recent WA gold
development and processing experience
Burbanks provides permitted brownfield infrastructure for a new 600ktpa plant, expandable to ~1.2Mtpa
Munda remains open and underpins the initial operation, with 141koz of recovered gold, A$437m LOM EBITDA,
A$2,843/oz AISC and a 2.3-year payback
Recent Union Jack and Iron Maiden acquisitions increase resources by 85% and are near-term mining opportunities,
potentially extending processing life
Auric’s 628km2 portfolio, including Lindsays, provides further resource, mine-life and regional growth, with drilling
underway
1
2
3
4
5
6
7
1: The SPP will not be underwritten and will be subject to receiving ASX waiver approval.
22
Appendices
23
Steven Morris | Non-Executive Chairman
Mark English | Managing Director
Gareth Solly | CEO & Executive Director
John Utley | Technical Director
Scott Bailey | Processing Manager
Share price and trading data
Corporate Snapshot
ASX: AWJ Unit Current
Ordinary shares outstanding mm 188
Fully diluted shares outstanding mm 222 2
Last share price – 12-Nov-2026 A$ / sh 0.20
Undiluted market capitalisation A$m 38 3
Total Debt A$m ~0
Total Cash and Cash Equivalents A$m 33 4
Undiluted Enterprise Value (A$m) A$m 5 5
• Capital structure
Pre Placement Capitalisation 1
Board and management
Top 20
(excl directors)
36%
Directors
12%
Other
52%
Pre Placement Share register Research Coverage
1:Market data 12 November 2026 2: Assumes performance rights and ‘in-the-money’ options are dilutive as per the Treasury Stock Method. Excludes shares to be issued as part of the Union Jack Acquisition (12.5 million)
3: Excludes dilutive securities in market capitalisation calculation (A$0.20/sh x ~188 million = ~A$38m) 4: 30/09/2026 quarterly. Excludes the cash consideration paid on 7 October 2026 for Union Jack Acquisition (A$6.5m)
5. Excludes 1.9koz on stockpile, owned camp and corporate office and warehouse, Burbanks and infrastructure package etc
0.0
1.0
2.0
3.0
4.0
5.0
6.0
7.0
$0.00
$0.05
$0.10
$0.15
$0.20
$0.25
$0.30
$0.35
$0.40
$0.45
Nov-25 Jan-26 Mar-26 May-26 Jul-26 Sep-26 Nov-26
Volume (m)
Price ($)
Market Volume Share Price
24
Auric has demonstrated execution ability with a de-risked pathway to larger development
● Starter Pit mined 2025/2026 on schedule and budget
● 8,886oz sold generated A$64 million in revenue and $39 million in profit
● Established site with fully equipped 20-man camp, water rights, access roads,
offices and remaining ore stockpiles containing 1.9koz
● Post mining, resource increased 32% to 194koz, despite Starter Pit depletion
● Geological, metallurgical & operating data de-risks the development pathway
● Consistent positive reconciliations from a conservative resource model
● Munda underpins Burbank's base case enabling potential financial upside
● Jeffreys Find mined between 2023 and 2025 on schedule and budget
● 29,537oz sold generating A$112 million in revenue and $33 million in profit1
● Illustrates AWJ's ability to exploit small-scale, high-grade gold deposits in the
Eastern Goldfields
● Dual mining campaigns validate geological model, reducing geological risk
inherent to narrow vein high-grade orebodies
METRIC FORECAST ACTUAL VARIANCE
Dry Tonnes Milled 125,000t 126,057t +1%
Reconciled Grade 1.80 g/t 2.46 g/t +37%
Mill Recovery 83% 89.5% +8%
Gold Recovered 6,100oz 8,886oz +46%
Auric Mining – successful track record
Jeffrey’s Find – A$112M Gold Sales Campaign 1
Munda Starter Pit – De-risking the Integrated Development
1. 50% profit split to AWJ
Jeffreys Find mining campaign 2024
25
Note: Numerical differences occur due to rounding
# ASX:AWJ 25 May 2026. Munda Gold Deposit Mineral Resource Increased by 32%; ^ ASX:AWJ 30 April 2026. Annual Report 2025; * ASX:AWJ 9 September 2026. Union Jack Acquisition and Major Resource Upgrade
Current Mineral Resources
Current JORC 2012 Mineral Resource Estimates
Deposit
Cut off Category Tonnes Grade Ounces
Au g/t (Thousand) (g/t Au) (k oz Au)
Munda in situ#
0.5 g/t
Indicated 3,500 1.45 163
Inferred 700 1.3 29
Munda Stockpiles# Indicated 76 0.81 2
SUBTOTAL 4,276 1.41 194
Jeffreys Find^ 0.5 g/t
Indicated 10 2.1 1
Inferred 70 1.8 4
SUBTOTAL 80 1.8 5
Union Jack* 0.5 g/t
Inferred 3,100 1.02 102
SUBTOTAL 3,100 1.02 102
Combined 0.5 g/t
Indicated 3,586 1.44 166
Inferred 3,870 1.08 135
TOTAL 7,456 1.25 301
2004 Mineral Resource Estimates
Deposit
Cut off Category Tonnes Grade Ounces
Au g/t (Thousand) (g/t Au) (k oz Au)
Iron Maiden% 0.5 g/t
Measured 750 1.6 39
Indicated 410 1.5 20
Inferred 221 1.4 10
TOTAL 1,380 1.5 69
Note: Numerical differences occur due to rounding
% Subject to Completion - ASX:AWJ 10 November 2026. Iron Maiden Gold Project – refer to AXS:ACS 26 November 2012 for original resource report.
Cautionary Statement: the Iron Maiden estimates are not reported in accordance with the JORC Code 2012; a Competent Person has not done sufficient work to classify them in accordance with the JORC Code 2012; it is possible that following evaluation and/or further exploration work the estimates
may materially change and hence will need to be reported afresh under and in accordance with the JORC Code 2012
26
The information in