Highlights
• Two binding agreements executed, one subject to due diligence, to purchase two
leases, together the Union Jack Project.
• Union Jack has an Inferred Mineral Resource estimate of 3.12Mt @ 1.02g/t Au for 102,000
ounces, presenting a compelling near term, open pit gold mining opportunity.
• This acquisition substantially increases Auric’s current Mineral Resource inventory by
51%, to 7.5Mt @ 1.25g/t gold for 301,000 ounces.
• The Project is located on granted mining and prospecting leases, 5km east of Coolgardie
and only 15km from the Burbanks processing facility.
• Union Jack has the potential to extend the Burbanks Mill feed and production capacity.
• Initial consideration for both contracts totals A$6.6 million cash and A$3.0 million in
shares payable on completion.
• Importantly, gold mineralisation remains open and has strong growth potential, with
drilling to commence upon completion.
• Additional milestone payments contingent on resource growth up to 200,000 ounces.
Mr Mark English, Managing Director, said:
“The Union Jack Project dovetails perfectly with our strategy of acquiring near-term gold
production assets within trucking distance of the Burbanks Mill. It’s so close we could almost
wheelbarrow the gold!
“This is a material and compelling opportunity, and too good to pass up, adding
substantially to the ounces we already control in the region. Conveniently, the Project is
located just 15 kilometres from Burbanks, which we intend to re-establish as a strategic gold
processing hub by early 2028.
“Union Jack is a potential near-term, open pit mining project, that could be advanced as
an additional source of feed for Burbanks. It also represents a substantial step in de-risking
our growth and adds to our strategy of becoming a sustainable producer.”
Mark English has prepared a video presentation to accompany this announcement. To
watch, visit the Auric Mining investor hub here: https://auricmining.com.au/link/Pb6Y0P
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Union Jack Project
Auric Mining Limited (ASX: AWJ) (“Auric” or the “Company”) is pleased to announce it has
executed Binding Agreements to purchase two leases that together comprise the Union
Jack Project (“the Project”), with one lease subject to completion of due diligence.
The Project located 5 km due East of Coolgardie, WA, and directly abutting the Great
Eastern Highway, comprises granted mining and prospecting leases covering 89 hectares
(Figure 1).
Figure 1. Union Jack Project, located ~15km from Burbanks processing plant
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
The Project has near-term open-pit mining potential, improved by its location being
approximately 15 kilometres from the Burbanks processing plant.
Union Jack has an Inferred Mineral Resource estimate of 3.12Mt at 1.02g/t Au for 102,000
ounces of gold (using a 0.5g/t Au cut off, within a A$7,000/oz RPEEE pit optimisation),
reported in accordance with JORC 2012 (Table 1). Figure 2 shows drill hole traces relative to
the pit shell and to Project boundaries. All of the current resource is located on the granted
mining lease and approximately 16% of the mineralisation is weathered and 84% fresh rock.
Using a 0.65g/t Au cut-off within the same optimised pit shell, the Project contains an Inferred
Mineral Resource Estimate of 2.16Mt at 1.22g/t Au for 85,000 ounces of gold. This higher-
grade inventory highlights the potential for Union Jack to provide additional feed for the
Burbanks processing plant.
This gold deposit adds substantially to the Company’s global Mineral Resource inventory
which, upon completion, will increase by 51% on a contained metal basis to 7.5Mt at 1.25g/t
Au for 301,000 ounces of gold.
Current Mineral Resource Estimates
Deposit
Cut off Category Tonnes Grade Ounces
Au g/t (Thousand) (g/t Au) (k oz Au)
Munda in situ#
0.5 g/t
Indicated 3,500 1.45 163
Inferred 700 1.3 29
Munda Stockpiles# Indicated 76 0.81 2
SUBTOTAL 4,276 1.41 194
Jeffreys Find^ 0.5 g/t
Indicated 10 2.1 1
Inferred 70 1.8 4
SUBTOTAL 80 1.8 5
Union Jack* 0.5 g/t
Inferred 3,100 1.02 102
SUBTOTAL 3,100 1.02 102
Combined 0.5 g/t
Indicated 3,586 1.44 166
Inferred 3,870 1.08 135
TOTAL 7,456 1.25 301
Table 1. Auric Mining Limited Gold Resources. Rounding errors are apparent.
# ASX:AWJ 25 May 2026. Munda Gold Deposit Mineral Resource Increased by 32%
^ ASX:AWJ 30 April 2026. Annual Report 2025
* Subject to completion of due diligence
Cautionary Statement
The Union Jack Project is subject to completion of due diligence and is not yet owned by
Auric.
The Company intends to undertake a substantial drilling program aimed at both infilling and
expanding the Mineral Resource ahead of mining studies and production scheduling, with
the objective of adding additional Auric-owned ore to the operating life of the Burbanks
processing plant.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Figure 2. Union Jack historic workings, drill holes and resource pit outline relative to tenure
Immediate Opportunities
The gold mineralisation at Union Jack remains open both along strike and at depth and the
Company considers the Project to have strong resource growth potential. Auric will,
immediately upon settlement, undertake additional drilling targeting operational readiness
and open pittable resource growth. Previous drilling into the shallow deposit includes:
• 17m @ 4.57 g/t from 24m • 17m @ 3.99 g/t from 13m
• 15m @ 4.22 g/t from 62m • 5m @ 12.21 g/t from 56m
• 5m @ 9.64 g/t from 10m • 16m @ 2.99 g/t from 1m
• 10m @ 4.72 g/t from 19m • 18m @ 2.61 g/t from 26m
• 13m @ 3.55 g/t from 9m • 10m @ 4.54 g/t from 33m
• 5m @ 8.91 g/t from 19m • 12m @ 3.49 g/t from 11m
• 12m @ 3.26 g/t from 39m • 16m @ 2.26 g/t from 2m
• 11m @ 3.04 g/t from 11m • 6m @ 5.56 g/t from 48m
• 2m @ 16.51 g/t from 17m • 12m @ 2.7 g/t from 6m
• 10m @ 3.24 g/t from 26m
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
In addition, the Project has potential for extension at depth, and the underground potential
will also be tested, where limited previous drilling has included:
• 2m @ 6.54 g/t from 200m • 2m @ 5.75 g/t from 191m
• 16m @ 4.34 g/t from 184m • 3m @ 4.68 g/t from 150m
Auric is committed to infill drilling and testing resource extensions. The Company will spend
A$2,000,000 on drilling over the first 5 years from settlement to support potential resource
growth up to and above 200,000 ounces of gold.
Union Jack Mineral Resource Estimate
Matrix Resource Consultants Pty Ltd (“Matrix”) completed the estimate of Mineral Resources
for the Union Jack gold deposit on the basis of drilling information supplied by Auric. To
provide estimates with reasonable prospects of eventual economic extraction (RPEEE),
Mineral Resources are reported within an optimal pit shell generated at a gold price of
$7,000 AUD/oz.
Mineral Resource estimates at a range of gold cut-off grades are presented in Table 2. The
figures are rounded to reflect the precision of the estimates and include rounding errors.
Inferred Mineral Resource Estimates
Au (g/t) Cut-off Tonnes (‘Mt) Au grade (g/t) Ounces (‘koz)
0.20 7.63 0.60 147
0.30 5.41 0.75 131
0.40 4.08 0.88 116
0.50 3.12 1.02 102
0.60 2.44 1.15 90
0.65 2.16 1.22 85
0.70 1.93 1.28 79
0.80 1.55 1.41 70
0.90 1.26 1.54 62
1.00 1.03 1.67 55
Table 2. September 2026 Union Jack gold deposit Mineral Resource estimates at various cut-off grades
Consideration for M15/120 (Union Jack)
The Company has paid EazyOz Resources Pty Ltd (“EazyOz” or “The Vendor”), A$100,000
by way of a non-refundable deposit in consideration for which The Vendor has granted
Auric the exclusive right to complete due diligence on the Project for up to 20 business days
from date of signing of the binding agreement.
Subject to successful completion of the due diligence, upon execution of the Tenement
Sale Agreement (“TSA”) Auric will pay to The Vendor:
• A$6,500,000 (plus GST in cash) including the A$100,000 deposit;
• Issue of 12,500,000 fully paid ordinary shares at $0.24 per share (A$3,000,000), (plus
GST in cash);
• Auric will pay further milestone payments based upon growth of JORC-compliant
gold Mineral Resources at the Project, including:
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
o A$2,000,000 on definition of at least 125,000 ounces gold;
o a further A$2,000,000 on definition of at least 150,000 ounces; and
o a final A$3,000,000 on definition of at least 200,000 ounces.
Each milestone payment may be satisfied in cash or Auric shares by agreement, defaulting
to 50% cash and 50% shares, with any shares priced at the five-day VWAP prior to
notification of the relevant milestone. Applicable GST is payable in cash.
In addition to the above consideration, Auric agrees to grant The Vendor a gross royalty of
1.0% of all gold produced and sold from M15/120.
As part of the agreement, Auric also agrees to spend a minimum of A$2,000,000 in drilling
expenditure within the first five years from settlement, including a minimum of A$500,000 to
be spent within the first year of settlement.
Consideration for P15/6183
The Company has separately paid A$100,000 to an unrelated third party as consideration
for the acquisition of Prospecting Licence P15/6183, which adjoins the Union Jack mining
lease.
Information Material to the Estimates of Mineral Resources
Union Jack Summary
The Union Jack Project is host to numerous historic shafts and shallow workings. However,
there has been minimal and only intermittent modern exploration up until 2021 when EazyOz
undertook a succession of drilling programs. The drilling database informing the mineral
resource estimates comprises information from drilling of 241 holes for a total of 15,210m.
The EazyOz drilling represents 88% of the total meterage drilled and 96% of the sampled
intervals.
The Mineral Resource estimate is reported within an optimised pit shell generated by Matrix
from parameters supplied by Auric. This approach is appropriate for providing estimates
with Reasonable Prospects for Eventual Economic Extraction (RPEEE) in accordance with
JORC 2012 guidelines.
The optimal pit shell (resource pit) extends over around 570m of strike with a maximum width
of 390m and reaches a maximum depth of around 220m (Figures 3 and 4).
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Figure 3. Union Jack drilling relative to resource pit crest, referenced by drill phase
A Cross-sectional view of drill hole grades and estimated panel grades relative to the
resource pit is shown in Figure 4.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Figure 4. Representative cross section showing drill hole grade ranges and estimated panel grades relative to
resource pit shell. Panels scaled by proportion above 0.5g/t cut-off (coloured by the grade above that cut-off)
Geology and Geological Interpretation
The Project is hosted in the Coolgardie Domain in the Norseman-Wiluna Archaean Belt,
within the Bonnie Vale ultramafic belt, a sequence of komatiites (ultramafics) and basalts
with lesser porphyry intrusions, volcaniclastic sediments and black shales.
Two mineralised lodes are defined by drilling at Union Jack with most drilling concentrated
in the southern half of the western lode (Figure 3).
The rock units intersected in drill holes are dominated by tremolite, actinolite, talc and/or
serpentinite after ultramafics and high-magnesian or tholeiitic basalts. Gold mineralisation
dips near vertical to steeply west and is hosted in sheeted or stockworked quartz or albite-
quartz veins within ultramafics, metamorphosed in places to actinolite schists. Pyrite and
pyrrhotite are common in association with significant gold assays and visible gold is
occasionally observed.
Drilling Database
GeoPeko drilled 8 diamond holes and 9 RC holes in the mid-1980s. A further 6 shallow RC
holes were drilled in 2000 or shortly after by an unrecorded company and there was no
further modern exploration until 2021 when EazyOz Resources acquired the Project.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Since 2021, EazyOz have drilled a further 218 RC holes for 13,426m, including 122 close-
spaced (10m x 10m pattern) drill holes for 5,920m in 2026 (Table 3). The EazyOz drilling
represents 88% of the total meterage drilled and 96% of the sampled intervals.
Year Company Hole Type No Holes Metres Drilled
1985 GeoPeko DD 8 773
1985 GeoPeko RC 9 651
~2000 Unknown RC 6 360
2021 EazyOz RC 8 602
2022 EazyOz RC 11 800
2023 EazyOz RC 47 3019
2024 EazyOz RC 24 1967
2025 EazyOz RC 6 1118
2026 EazyOz RC 122 5920
TOTAL 241 15210
Table 3. Union Jack drilling summary by company and year drilled
Details for all drill holes used in the modelling and estimation of resources, including the
higher density drilling, are provided in Appendix A. The details include significant intercepts
composited to 2m minimum length, at a 0.5g/t cut-off.
Sampling and Sub-sampling Techniques
GeoPeko sampled both diamond and RC holes over 2m intervals. The RC holes drilled in the
year 2000 or thereabouts were sampled over 4m intervals. RC samples since have been
sampled over either 1m or 2m intervals. Diamond core was sampled as half core. No details
of sampling techniques are available for GeoPeko’s RC drilling or the 6 holes drilled around
the year 2000.
EazyOz sampled at the drill rig via a fixed-cone splitter, generating samples of
approximately 2.5-3.5kg.
Sample Analysis Methods
GeoPeko samples were analysed for gold at a Classic Comlabs facility using an acid digest
and AAS finish. All samples returning 1ppm gold or higher were re-analysed by fire assay.
Samples from 1 diamond drill hole (UD7) were also analysed for arsenic and copper.
EazyOz samples were analysed for gold at Jinning Testing and Inspection laboratory in
Kalgoorlie via a 50g fire assay.
QA Procedures and QC Data
There is no QA data available for samples taken prior to EazyOz’s participation in the Project,
representing less than 4% of the sampled intervals.
All of the EazyOz drilling programs were supervised by experienced consultancy, Barking
Outback Pty Ltd.
Standards were routinely submitted by Barking Outback in sequence with samples at a
nominal 1 in 60 ratio and duplicate splits were taken at the rig at a nominal 1 in 20 ratio,
although not submitted with all programs.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Duplicates for 646 samples show reasonable correlation with original assays (r2 = 0.71) and
no significant bias.
Analyses of standards (as submitted by both Jinning and Barking Outback) show reasonable
correlation with the expected values with no consistent bias.
Estimation Methodology
Mineral Resources were estimated by Multiple Indicator Kriging with block support
correction to reflect open pit mining selectivity. The estimates are based on 2m down-hole
composited gold assay grades from RC drilling available for the Project in September 2026.
The estimates are primarily informed by information from drilling completed since 2021 with
this sampling providing around 91% of the mineralised domain estimation dataset within the
pit shell constraining the MRE.
Micromine software was used for data compilation, domain wire framing, coding of
composite values and pit optimisation. GS3M was used for resource modelling. The
estimation methodology is appropriate for the mineralisation style.
The MIK modelling utilised two sub-vertical northwest trending mineralised envelopes
interpreted by Matrix capturing composites with gold grades of generally greater than 0.1
g/t designated as the eastern and western zones. The western zone is subdivided into a
comparatively lower-grade northern zone and higher-grade southern zone that was the
focus of 2026 RC drilling. The southwest domain is interpreted over around 180m of strike
with an average width of around 75m and the northwest zone extends over around 290m
of strike, averaging around 55m width. The eastern zone is interpreted over around 450m of
strike with an average width of around 45m.
Matrix interpreted a wire-framed surface representing the base of weathering from drill hole
logging which was used for density assignment and classifying the estimates by weathering
zone. Within the pit shell constraining the MRE the interpreted depth to base of weathering
averages around 23m.
Grade continuity was characterised by indicator variograms modelled at 14 indicator
thresholds. For determination of variance adjustment factors a variogram was modelled
from composite gold grades. The modelled variograms are consistent with geological
interpretations and trends shown by composite gold grades. Indicator class grades used for
MIK modelling of the mineralised domains were derived from the class means with between
1 and 2 high-grade outlier composite grades for each domain cut to the next highest
composite grade.
The MIK modelling utilised five progressively relaxed search passes selected on the basis of
the drill hole spacing and mineralisation trends to inform a reasonably large proportion of
the mineralised domains while allowing blocks to be estimated by reasonably close data
where possible.
The estimates include a variance adjustment to give estimates of recoverable resources
above gold cut-off grades for mining selectivity of around 3 by 5 by 2.5m (cross strike, strike,
vertical). In the Competent Person’s experience, the Mineral Resource estimates can be
reasonably expected to provide appropriately reliable estimates of potential mining
outcomes at the assumed selectivity without application of additional mining dilution or
mining recovery factors.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
No bulk density measurements are available for the deposit. Bulk densities of 2.4 and 2.8
t/bcm were assigned to weathered and fresh mineralisation from the Competent Person’s
experience of similar mineralisation styles.
Classification Criteria
The Mineral Resources are classified as Inferred reflecting the commonly broad drill spacing,
lack of density measurements and limited information available to substantiate the reliability
of some earlier sampling phases. The estimates are based on drilling spacings ranging from
around 10m for shallow mineralisation in the southwest domain to around 60m at depth.
Mineral resources are extrapolated to a maximum of generally around 30m from drilling with
comparatively rare extrapolation in areas of interpreted greater continuity to a maximum
of around 50m from drilling.
Potential for reasonable prospects of eventual economic extraction
To provide estimates with reasonable prospects of eventual economic extraction, Mineral
Resources are constrained within an optimal pit generated by Matrix utilising cost and
revenue parameters specified by Auric, including a gold price of A$7,000/oz, mining costs
of A$5.20/t combined processing and haulage costs of A$50/t, and metallurgical recovery
of 95%.
The pit shell, which reaches a maximum depth of around 220m extends over around 570m
of strike, with a maximum width of around 390m.
Cut-off grades
The resources have been estimated for a range of cut-off grades (Table 2) which are
considered appropriate in terms of the ‘reasonable prospects of eventual economic
extraction’ criterion for JORC 2012 compliance. The cut-off grades selected for reporting
reflect Auric’s view of potential project economics.
Mining and Metallurgical Factors
A model for the top of fresh rock was developed utilising the resource drill holes where
appropriate data was available. This was used in the subdivision of the data into weathered
and fresh rock subdomains for the current estimate of resources.
There is no metallurgical test work available. The MRE assumes recoveries of 95% on the basis
of Auric’s interpretation of information available for similar mineralisation in the region.
Competent Person Statement
The information in this announcement that relates to information informing Mineral
Resources is based on and fairly represents information and supporting documentation
compiled by Mr John Utley, who is a full-time employee of Auric Mining Limited. Mr Utley is
a Competent Person and a member of the Australian Institute of Geoscientists. Mr Utley has
sufficient experience that is relevant to the style of mineralisation and type of deposit under
consideration and to the activity being undertaken to qualify as a Competent Person as
defined in the 2012 Edition of the ‘Australasian Code for Reporting of Exploration Results,
Mineral Resources and Ore Reserves’. Mr Utley consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
The information in this announcement that relates to modelling of Union Jack Mineral
Resources is based on information compiled by Mr Jonathon Abbott, who is a Member of
The Australian Institute of Geoscientists. Mr Abbott is a director of Matrix Resource
Consultants Pty Ltd and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he is
undertaking to qualify as a Competent Person as defined in the 2012 edition of the
“Australasian Code for Reporting Exploration Results, Mineral Resources and Ore Reserves”.
Mr Abbott consents to the inclusion in the report of the matters based on his information in
the form and context in which it appears.
The information in this announcement that relates to Mineral Resource estimates for the
Munda gold deposit and for the Jeffreys Find gold deposit are extracted from the following
announcements all of which are available to view on the Auric website
www.auricmining.com.au. The Company confirms that it is not aware of any new
information or data that materially affects the information included in the original market
announcement and that all material assumptions and technical parameters underpinning
the estimates in the relevant market announcement continue to apply and have not
materially changed. The Company confirms that the form and context in which the
Competent Person’s findings are presented have not been materially modified from the
original market announcements:
• ASX: AWJ 25 May 2026. Munda Gold Deposit Mineral Resource Increased by 32%
• ASX: AWJ 30 April 2026. Annual Report 2025
Forward Looking Statements
This Announcement may contain forward-looking statements which are identified by words such
as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’, ‘expected’, or ‘intends’ and other
similar words that involve risks and uncertainties. These statements are based on an assessment
of present economic and operating conditions, and on several assumptions regarding future
events and actions that, as at the date of this Announcement, are considered reasonable. Such
forward-looking statements are not a guarantee of future performance and involve known and
unknown risks, uncertainties, assumptions, and other important factors, many of which are
beyond the control of the Company, the Directors, and the management. The Directors cannot
and do not give any assurance that the results, performance, or achievements expressed or
implied by the forward-looking statements contained in this Announcement will occur and
investors are cautioned not to place undue reliance on these forward-looking statements.
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
T +61 409 372 775
E menglish@auricmining.com.au
Gareth Solly
CEO and Executive Director
Auric Mining Limited
T +61 8 9548 9997
E gsolly@auricmining.com.au
Follow our
communications
Click here to subscribe to
our updates
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Appendix A
Resource Model Drill Hole Coordinates and Significant Intercepts at
0.5g/t Cut Off¹
Hole Collar coordinate (GDA 94) Hole Year Hole Orientation Intercept³
ID East North RL Depth (m) Drilled Type² Az./Incl.
EZCH_0001 327,759 6,578,410 421 50 2022 RC 90/-60 2m @ 0.59 g/t from 22m
EZCH_0001 2m @ 0.53 g/t from 30m
EZCH_0001 3m @ 1.99 g/t from 41m
EZCH_0001 4m @ 3.74 g/t from 45m
EZCH_0002 327,784 6,578,385 420 50 2022 RC 40/-60 4m @ 3.53 g/t from 8m
EZCH_0002 2m @ 0.81 g/t from 17m
EZCH_0002 3m @ 1.2 g/t from 22m
EZCH_0002 4m @ 4.98 g/t from 40m
EZCH_0003 327,741 6,578,417 421 100 2022 RC 50/-60 3m @ 0.89 g/t from 55m
EZCH_0004 327,773 6,578,395 421 100 2022 RC 50/-60 4m @ 2.73 g/t from 14m
EZCH_0004 2m @ 0.76 g/t from 21m
EZCH_0004 4m @ 1.18 g/t from 35m
EZCH_0004 8m @ 2.11 g/t from 42m
EZCH_0004 2m @ 0.89 g/t from 51m
EZCH_0004 2m @ 13.24 g/t from 90m
EZCH_0005 327,794 6,578,375 419 100 2022 RC 80/-60 2m @ 0.58 g/t from 0m
EZCH_0005 4m @ 0.79 g/t from 3m
EZCH_0005 5m @ 1.74 g/t from 7m
EZCH_0005 2m @ 0.66 g/t from 21m
EZCH_0005 3m @ 1.71 g/t from 79m
EZCH_0005 4m @ 1.25 g/t from 83m
EZCH_0005 9m @ 2.09 g/t from 87m
EZCH_0006 327,832 6,578,406 419 100 2022 RC 267/-61 2m @ 1.12 g/t from 4m
EZCH_0006 3m @ 1.14 g/t from 30m
EZCH_0006 2m @ 0.51 g/t from 53m
EZCH_0006 7m @ 3.93 g/t from 56m
EZCH_0006 2m @ 0.67 g/t from 63m
EZCH_0006 9m @ 2.35 g/t from 65m
EZCH_0006 3m @ 0.77 g/t from 75m
EZCH_0006 7m @ 1.44 g/t from 80m
EZCH_0006 3m @ 2.19 g/t from 87m
EZCH_0007 327,783 6,578,447 420 100 2022 RC 230/-60 5m @ 1.24 g/t from 16m
EZCH_0007 2m @ 1.55 g/t from 31m
EZCH_0007 3m @ 7.93 g/t from 55m
EZCH_0007 15m @ 4.22 g/t from 62m
EZCH_0007 2m @ 0.62 g/t from 82m
EZCH_0007 8m @ 1.18 g/t from 85m
EZCH_0008 327,587 6,578,488 425 100 2023 RC 16/-50 NSI
EZCH_0009 327,655 6,578,445 423 150 2023 RC 31/-50 8m @ 0.76 g/t from 103m
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 9 SEPTEMBER 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
EZCH_0009 2m @ 0.63 g/t from 113m
EZCH_0009 3m @ 2.99 g/t from 118m
EZCH_0009 2m @ 0.84 g/t from 137m
EZCH_0009 2m @ 0.82 g/t from 144m
EZCH_0010 327,740 6,578,411 421 150 2023 RC 28/-61 2m @ 0.56 g/t from 4m
EZCH_0010 2m @ 0.5 g/t from 8m
EZCH_0010 3m @ 0.84 g/t from 10m
EZCH_0010 3m @ 4.26 g/t from 58m
EZCH_0010 2m @ 0.51 g/t from 61m
EZCH_0010 3m @ 0.94 g/t from 69m
EZCH_0010 3m @ 1.16 g/t from 73m
EZCH_0010 2m @ 0.82 g/t from 76m
EZCH_0010 4m @ 0.56 g/t from 80m
EZCH_0011 327,748 6,578,392 420 132 2023 RC 21/-60 12m @ 2.05 g/t from 3m
EZCH_0011 5m @ 1.09 g/t from 26m
EZCH_0011 3m @ 1.05 g/t from 39m
EZCH_0011 2m @ 0.59 g/t from 61m
EZCH_0011 3m @ 0.62 g/t from 71m
EZCH_0011 6m @ 4.69 g/t from 75m
EZCH_0011 7m @ 3.89 g/t from 81m
EZCH_0011 5m @ 0.97 g/t from 92m
EZCH_0012 327,782 6,578,391 419 120 2023 RC 32/-60 7m @ 1.45 g/t from 1m
EZCH_0012 9m @ 0.76 g/t from 8m
EZCH_0012 3m @ 0.5 g/t from 52m
EZCH_0012 3m @ 1.09 g/t from 56m
EZCH_0012 2m @ 0.53 g/t from 71m
EZCH_0013 327,822 6,578,360 419 132 2023 RC 21/-60 2m @ 0.59 g/t from 3m
EZCH_0013 3m @ 2.82 g/t from 6m
EZCH_0013 17m @ 1.83 g/t from 17m
EZCH_0013 2m @ 0.82 g/t from 48m
EZCH_0013 2m @ 4.69 g/t from 119m
EZCH_0014 327,836 6,578,392 418 16 2023 RC 30/-60 3m @ 0.67 g/t from 0m
EZCH_0014 5m @ 4.43 g/t from 11m
EZCH_0015 327,871 6,578,381 418 100 2023 RC 39/-61 2m @ 1.06 g/t from 32m
EZCH_0015 2m @ 2.86 g/t from 34m
EZCH_0015 2m @ 0.69 g/t from 38m
EZCH_0015 3m @ 0.67 g/t from 41m
EZCH_0016 327,838 6,578,390 418 70 2023 RC 47/-61