Updated Resources for Munda Gold Deposit - Clarification
Released
Released
Announcement PDF
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Clarification Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) refers to the announcement
on 10 December 2024 entitled “Updated Resources for Munda Gold Deposit” (the
“Announcement”). In discussions with the Company subsequent to the release of
the Announcement, the Australian Securities Exchange (“ASX”) have requested the
below changes:
•
Inclusion of the updated mineral resources estimate for which the drillhole
collar information and assay results for the holes used in the update MRE.
As a result, the Company has updated the announcement to include the above.
To avoid any potential
announcement.
confusion,
the
Company
attaches
the
revised
Approved for release by the Board of Auric Mining Limited.
Catherine Yeo
Company Secretary
Auric Mining Limited
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Munda Gold Deposit
Updated Mineral Resources
Precursor to Starter Pit Mining
Highlights
•
Current estimates of resources are pit-constrained to reflect reasonable
prospects for eventual economic extraction.
•
Munda Gold Deposit resources (Indicated and Inferred) re-estimated at 3.65Mt
at 1.23g/t at a 0.5g/t cut-off for 145,000 oz Au.
•
Estimates incorporate new data from 10m x 10m spaced drilling over a shallow
portion of the deposit.
•
Resource model being used to optimise a starter pit mining near surface gold
mineralisation.
Management Comment
Mr. Mark English, Managing Director:
“We have steadily progressed our understanding of the Munda gold deposit with
infill drilling and this resource update as part of that progression. We’re pushing hard
to start mining a starter pit early in 2025”
Mr. John Utley, Technical Director:
“The 10m x 10m drill program reaffirmed the style of gold mineralisation at Munda,
notably very high grades against a background of much lower grades. It is prudent
to take a conservative approach to the contribution of the high grades to the
mineable grades at Munda in our planning for a starter pit such that any variations
should be on the upside”
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to announce an
updated estimate of gold resources for the Munda gold deposit.
Matrix Resource Consultants Pty Ltd (“Matrix”) have completed a new estimate of
Mineral Resources for the Munda gold deposit as a precursor to defining an Ore
Reserve for a trial pit. To provide estimates with reasonable prospects of eventual
economic extraction, Mineral Resources are reported within an optimal pit shell
generated at a gold price of $AUD3,200/oz.
Mineral Resource estimates at a range of gold cut-off grades are presented in Table
1. The figures are rounded to reflect the precision of the estimates and include
rounding errors.
Table 1 November 2024 Munda gold deposit Mineral Resource estimates
Au g/t
Cut-off
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
MTonnes
7.56
5.51
4.24
3.35
2.71
2.24
1.89
1.62
1.41
Indicated
Au g/t
0.72
0.89
1.06
1.22
1.38
1.53
1.67
1.81
1.94
Koz
175
158
144
131
120
110
101
94
88
MTonnes
0.5
0.4
0.3
0.3
0.2
0.2
0.2
0.1
0.1
Inferred
Au g/t
0.9
1.0
1.2
1.4
1.5
1.7
1.9
2.0
2.1
Koz
14
13
12
14
10
11
12
6
7
Indicated + Inferred
MTonnes Au g/t
Koz
8.06
0.73
189
5.91
0.90
171
4.54
1.07
156
3.65
1.23
145
2.91
1.39
130
2.44
1.54
121
2.09
1.69
114
1.72
1.82
101
1.51
1.95
95
Since the previous estimate, described in an ASX announcement on 28 January
2022. Auric has completed a close-spaced drill program on a 10m x 10m pattern
over a shallow portion of the Munda gold deposit. That information and
conservative treatment of outlier assay grades has resulted in a slight reduction in
estimated grade relative to previous Mineral Resources. The reporting of resources
within an optimal pit shell reduces the tonnes compared with the earlier estimate.
For comparison, Table 2 presents the January 2022 Mineral Resource estimates. The
figures in this table are also rounded to reflect the precision of the estimates and
include rounding errors.
Table 2. January 2022 Munda gold deposit Mineral Resource estimates
Au g/t
Cut-off
0.20
0.30
0.40
0.50
0.60
0.80
1.00
Indicated
MTonnes Au g/t
8.928
0.75
6.113
0.98
4.598
1.19
3.684
1.38
3.052
1.55
2.240
1.86
1.737
2.14
Auric Mining Limited
ACN 635 470 843
Koz
215.3
193.0
176.3
163.1
152.0
133.9
119.4
Inferred
MTonnes
Au g/t
2.807
0.61
1.597
0.88
1.070
1.15
0.797
1.39
0.633
1.61
0.450
1.98
0.353
2.28
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
Koz
54.7
45.4
39.5
35.6
32.7
28.7
25.9
Indicated + Inferred
MTonnes Au g/t
Koz
11.735
0.72
270.0
7.710
0.96
238.4
5.668
1.18
215.8
4.481
1.38
198.7
3.685
1.56
184.7
2.690
1.88
162.6
2.090
2.16
145.3
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Information Material to the Estimates of Mineral Resources
Munda Summary
The Munda Gold Project is situated on mining lease M15/87, approximately 5km west
of Widgiemooltha and is linked to the Coolgardie-Esperance Highway by
miscellaneous licence L15/414.
There have been numerous phases of exploration and resource drilling at Munda
since the 1960’s. The majority of this work was undertaken by Western Mining
Corporation with subsequent programs by seven different companies including
excavation of a small pit by Resolute Mining in 1999. The most recent drilling was by
Auric with 55 deeper RC holes drilled in 2021-22 followed by 361 shallow infill holes
drilled on a 10m x 10m pattern in 2023-24 (Figure 1).
Figure 1. Munda drilling relative to resource pit crest with resource drill holes referenced by
exploration company and hole type.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Mineral Resources are reported within an optimised pit shell generated by Matrix
from parameters supplied by Auric. This approach is appropriate for providing
estimates with reasonable prospects for eventual economic extraction in
accordance with JORC 2012 guidelines.
The optimal pit shell (resource pit) extends over around 650m of strike with a
maximum width of 300m and reaches a maximum depth of around 150m (Figures 2
and 3).
Cross sectional views of drill hole grades and estimated panel grades relative to the
resource pit are shown in Figures 2 and 3.
Figure 2. Cross section 360390mE – Showing drill hole grade ranges and estimated panel
grades relative to resource pit shell. Panels scaled by proportion above 0.50 g/t cut off and
coloured by the grade above that cut-off.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Figure 3. Cross section 360470mE – Showing drill hole grade ranges and estimated panel
grades relative to resource pit shell. Panels scaled by proportion above 0.50 g/t cut off and
coloured by the grade above that cut-off.
Geology and Geological Interpretation
The Munda gold deposit is hosted predominantly within basalts and to a lesser
extent in overlying ultramafic flows. Gold mineralisation, even at very high grades is
quite inconspicuous in hand specimen, with subtle albite and quartz alteration and
only rare sulphide minerals except where nickel mineralisation is present. The
distribution of gold mineralisation is interpreted to be controlled by the intersection
of a south-easterly dipping fault or shear and layering in the basalts and ultramafics
subparallel to the basalt-ultramafic contact.
Drilling Database
The drilling database informing the estimates comprises information from drilling
completed by previous tenement holders between 1967 and 2024 including
Anaconda, WMC, Resolute, Estrella, Titan, Widgie Nickel and Auric Mining. WMC's
RC and diamond drilling provides the largest proportion of this drilling (Table 3).
Resource drilling tests the currently defined Munda mineralisation over around 940m
of east west strike to around 45m depth but is particularly sparse below
approximately 230m depth below natural surface.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Table 3. Drill hole database compiled by company and hole type
Group
Resource
Infill
(Auric 202324)
Subtotal
Auric
Total
1
Phase
Anaconda 1967-75
WMC 1995-99
Resolute 1999-2000
Eureka 2016
Estrella 2019
Titan 2005-06
Widgie Nickel 2021-23
Auric 2021-22
Subtotal
Central
Southern
Subtotal
Total
RC
Number
241
35
15
36
16
55
398
355
6
361
416
Metres
21,811.0
1,893.0
1,177.0
4,125.0
2,939.0
6,780.0
38,725.0
11,156.0
145.0
11,301.0
18,081.0
759
50,026.0
Diamond1
Number Metres
41
5,825.3
57
10,921.2
2
243.9
2
321.3
26
6,917.8
16
6,001.4
144
30,230.9
144
30,230.9
Total
Number Metres
41
5,825.3
298
32,732.2
37
2,136.9
15
1,177.0
2
321.3
62
11,042.8
32
8,940.4
55
6,780.0
542
68,955.9
355
11,156.0
6
145.0
361
11,301.0
416
18,081.0
903
80,256.9
Widgie Nickel diamond drilling includes RC pre-collars.
From that database, the resource modelling utilised a mineralised domain
interpreted by Matrix which captures two metre down-hole composites from RC and
diamond drilling with gold grades of generally greater than 0.1 g/t. WMC drill holes
contributed around 40% of the dataset informing resources while Titan and Auric drill
holes contributed around 11% and 41% respectively. The estimation dataset is
dominated by samples from RC drilling with diamond drilling contributing around
8%.
Details for all drill holes used in the modelling and estimation of resources, including
the higher density drilling, are provided in Appendix A. The details include length
weighted significant intercepts at 0.5g/t gold cut-off.
Sampling and Sub-sampling Techniques
No details of sampling techniques are available for Anaconda’s diamond drilling or
WMC’s RC drilling. Sampling and assaying of the other significant drilling phases
employed industry standard methods, as follows:
A small proportion of the core drilled by WMC is in storage and accessible. The core
is NQ in diameter, has been sampled over nominally 1m intervals and has been sawn
with mostly half core removed. Sample intervals are generally well marked.
For Resolute’s drilling, RC and diamond core samples were generally collected over
1m down-hole intervals by riffle-splitting, or halving with a diamond saw respectively
and submitted to Kal Assay Laboratory for gold analysis by aqua regia digest with
AAS determination.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
For Titan’s drilling, 1m riffle split RC samples were submitted for analysis as individual
samples or 4 m down-hole composites, and half or quarter core samples were
collected over generally 1 m intervals. The samples were assayed by ALS or
Genalysis for gold by fire assay.
Estrella drilled two HQ diameter diamond holes. Holes were sampled over nominal
1m lengths with half or quarter, generally sawn core submitted for assay.
Auric sampled RC holes at 1m intervals via a rig-mounted cyclone and fixed-cone
splitter. The individual samples, typically weighing between 2.5kg and 3.5kg were
submitted for assay.
Sample Analysis Methods
The assay methodology used by WMC is not recorded. Resolute and Estrella sample
aliquots of 25g or 50g were assayed via an aqua regia digest with gold
concentrations determined by AAS or ICP-MS. Titan and Auric utilised a 50g fire
assay with gold concentrations for Titan and Auric samples determined by ICP-OES
or ICP_AES.
QA Procedures and QC Data
Prior to Auric’s infill drilling program, approximately half (57%) of the sample intervals
represented in the resource database had no associated qualifying data, that is, no
record of QA procedures or QC data. The remainder have at least some associated
QC data; duplicate assaying and/or sample standards.
There is a significant spatial overlap between the data which have qualifying
information and those that do not. Based on analysis of the univariate and spatial
statistical properties of the qualified and unqualified data, it is considered
reasonable to use the combined qualified and unqualified drill hole data to
generate qualified estimates of Mineral Resources.
Resource Modelling
Munda gold Mineral Resources were estimated by Multiple Indicator Kriging (“MIK”)
with block support correction to reflect open pit mining selectivity, a method that
has been demonstrated to provide reliable estimates of resources recoverable by
open pit mining for a wide range of mineralisation styles.
The estimates are based on 2 m down-hole composited gold assay grades from RC
and diamond drilling by Auric and previous tenement holders, including 10 by 10 m
infill drilling undertaken by Auric. Mineral Resources are primarily informed by
information from RC drilling with diamond providing around 8% of mineralised
domain composites within the pit shell constraining Mineral Resources.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Micromine software was used for data compilation, domain wire framing and
coding of composite values and GS3M was used for resource estimation. The
resulting estimates were imported into Micromine for pit optimisation and resource
reporting. The estimation methodology is appropriate for the mineralisation style.
The MIK modelling utilised a northerly dipping mineralised domain capturing
composites with gold grades of greater than 0.1 g/t which extends over around 940
m of strike with an average horizontal width of around 120 m. Wire-framed surfaces
representing the base of oxidation and top of fresh rock and contact between
ultramafic and mafic rocks interpreted by Auric geologists from drill hole logging
were used for density assignment. Within the mineralised area, the base of complete
oxidation averages around 4 m depth with fresh rock occurring at an average
depth of around 16 m.
Grade continuity was characterised by indicator variograms modelled at 14
indicator thresholds. The modelled variograms are consistent with geological
interpretations and trends shown by composite gold grades. For estimation, search
ellipsoids and variograms were aligned with local mineralisation trends defined by
three zones of consistent orientation. Class grades used for MIK modelling were
derived from class mean grades with the exception of the upper bin grades which,
for the mineralised domain were determined by oxidation zone and selected from
either the bin median (oxide zone) or bin mean excluding small number of outlier
composites (transitional and fresh zones).
Bulk densities of 2.20 and 2.50 t/bcm were assigned to oxidised and transitional zones
respectively, with densities of 2.93 and 2.83 t/bcm allocated to fresh mafic and
ultramafic respectively. The densities assigned to transitional and fresh material
reflect immersion density measurements of diamond core. The density assigned to
oxidised mineralisation, which provides around 0.6% of Mineral Resources is
consistent with Matrix’s experience of similar mineralisation.
The estimates include a variance adjustment to give estimates of recoverable
resources above gold cut-off grades for open pit mining selectivity of around 5 by 5
by 2.5 m. In Matrix’s experience, the Mineral Resource estimates can be reasonably
expected to provide appropriately reliable estimates of potential mining outcomes
at the assumed selectivity without application of additional mining dilution or mining
recovery factors.
Mineral Resource Classification
Estimates for mineralisation tested by drilling spaced at around 20 m and closer are
classified as Indicated. Estimates for more broadly sampled mineralisation,
extrapolated up to generally around 30 m from general drilling areas are classified
as Inferred.
To provide estimates with reasonable prospects of eventual economic extraction,
Mineral Resources are reported within an optimal pit shell generated at a gold price
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
of $AUD3,200/oz which extends over around 650 m of strike to a maximum depth of
around 150 m.
Cut-off Grades
Gold mineralisation at Munda is widely disseminated with higher-grade pockets
within a broad halo of lower grade mineralisation. This style is most appropriate to
potential development via open pit mining.
The resources have been estimated for a range of cut-off grades (Table 1) which
are considered appropriate in terms of the ‘reasonable prospects of eventual
economic extraction’ criterion for JORC 2012 compliance.
Mining and Metallurgical Factors
A model for the base of oxidation and top of fresh rock was developed utilising the
resource drill holes where appropriate data was available and validated using the
10m x 10m infill drill holes. This was used in the subdivision of the data into oxidised,
transitional and fresh rock subdomains for the current estimate of resources.
Bottle roll testwork on samples by Titan in 2006, and by Auric in 2020 returned
average recoveries of 96.5% and 92% respectively. A fresh rock composite sample
submitted by Auric in 2022 for gravity separation and cyanide leaching reported
gold extraction of 96.6% after 24 hours. Recent testwork on both oxide/transitional
and fresh rock composites representing the principal lithologies identified a
refractory gold component in fresh mafics with recoveries ranging from 82.1% under
standard cyanide concentrations to 96.8%. Follow-up intense cyanide leaching
(LeachWELL method) of 26 fresh mafic samples including the samples used to make
up the metallurgical testwork samples provided recoveries ranging from 79.8% to
97.4% and averaged 92.0%. Whist encouraging, the overall recovery will be best
determined via a starter pit.
COMPETENT PERSONS STATEMENTS
The information in this announcement that relates to exploration results and
information informing Mineral Resources is based on and fairly represents information
and supporting documentation compiled by Mr John Utley, who is a full-time
employee of Auric Mining Limited. Mr Utley is a Competent Person and a member
of the Australian Institute of Geoscientists. Mr Utley has sufficient experience that is
relevant to the style of mineralisation and type of deposit under consideration and
to the activity being undertaken to qualify as a Competent Person as defined in the
2012 Edition of the ‘Australasian Code for Reporting of Exploration Results, Mineral
Resources and Ore Reserves’. Mr Utley consents to the inclusion in the report of the
matters based on his information in the form and context in which it appears.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
The information in this announcement that relates to Mineral Resource estimation is
based on information compiled by Mr Jonathon Abbott, who is a Member of The
Australian Institute of Geoscientists. Mr Abbott is a director of Matrix Resource
Consultants Pty Ltd and has sufficient experience which is relevant to the style of
mineralisation and type of deposit under consideration and to the activity which he
is undertaking to qualify as a Competent Person as defined in the 2012 edition of
the “Australasian Code for Reporting Exploration Results, Mineral Resources and Ore
Reserves”. Mr Abbott consents to the inclusion in the report of the matters based on
his information in the form and context in which it appears.
FORWARD LOOKING STATEMENTS
This Announcement may contain forward-looking statements which are identified
by words such as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’,
‘expecting’, or ‘intends’ and other similar words that involve risks and uncertainties.
These statements are based on an assessment of present economic and operating
conditions, and on a number of assumptions regarding future events and actions
that, as at the date of this Announcement, are considered reasonable. Such
forward-looking statements are not a guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions, and other important factors,
many of which are beyond the control of the Company, the Directors, and the
management. The Directors cannot and do not give any assurance that the results,
performance, or achievements expressed or implied by the forward-looking
statements contained in this Announcement will actually occur and investors are
cautioned not to place undue reliance on these forward-looking statements.
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Investor Relations
Mark English
Managing Director
Auric Mining Limited
Alex Cowie
Director
NWR Communications
T +61 409 372 775
E menglish@auricmining.com.au
T +61 412 952 610
E alexc@nwrcommunications.com.au
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
Follow our
communications
Click here to
subscribe to our
updates
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
Appendix A
Resource Model Drill Hole Coordinates and Significant
Intercepts at 0.5g/t Cut Off¹
Hole
AMRC001
Collar coordinate (GDA 94)
Hole
East
North
RL
Depth (m)
360,560
6,513,840
376
162
Company
Auric
Hole
Orientation
Intercept³
Type²
Az./Incl.
Down hole, Au g/t
RC
182/-60
5m @ 0.6 g/t from 103 m
AMRC001
7m @ 1.89 g/t from 132 m
AMRC002
360,560
6,513,880
373
180
Auric
RC
182/-60
3m @ 0.57 g/t from 166 m
AMRC003
360,340
6,513,800
382
174
Auric
RC
185/-60
7m @ 1.66 g/t from 98 m
AMRC003
9m @ 7.43 g/t from 105 m
AMRC004
360,300
6,513,800
385
156
Auric
RC
181/-60
5m @ 0.54 g/t from 119 m
AMRC005
360,253
6,513,750
395
162
Auric
RC
182/-60
9m @ 1.99 g/t from 86 m
AMRC006
360,180
6,513,688
391
174
Auric
RC
181/-59
3m @ 0.64 g/t from 91 m
AMRC006
3m @ 0.57 g/t from 113 m
AMRC007
360,199
6,513,699
390
168
Auric
RC
180/-62
4m @ 0.55 g/t from 96 m
AMRC008
360,241
6,513,699
387
166
Auric
RC
180/-60
4m @ 0.56 g/t from 106 m
AMRC009
360,335
6,513,635
382
120
Auric
RC
181/-59
3m @ 0.54 g/t from 97 m
AMRC009
4m @ 0.52 g/t from 109 m
AMRC010
360,120
6,513,518
376
102
Auric
RC
183/-61
NSI
AMRC011
360,120
6,513,561
382
120
Auric
RC
179/-59
6m @ 0.62 g/t from 28 m
AMRC012
360,119
6,513,609
386
162
Auric
RC
180/-59
4m @ 0.51 g/t from 47 m
AMRC012
18m @ 10.61 g/t from 58 m
AMRC012
5m @ 0.59 g/t from 76 m
AMRC013
360,646
6,513,797
384
228
Auric
RC
182/-61
AMRC013
AMRC014
3m @ 0.61 g/t from 148 m
5m @ 0.51 g/t from 215 m
360,624
6,513,770
380
198
Auric
RC
183/-60
22m @ 3.03 g/t from 85 m
AMRC014
12m @ 1.52 g/t from 107 m
AMRC014
12m @ 0.67 g/t from 180 m
AMRC014
3m @ 0.58 g/t from 194 m
AMRC015
360,799
6,513,639
365
168
Auric
RC
182/-61
AMRC015
AMRC016
5m @ 1.85 g/t from 91 m
10m @ 1.71 g/t from 155 m
360,682
6,513,746
372
186
Auric
RC
186/-61
AMRC016
4m @ 0.58 g/t from 139 m
5m @ 0.59 g/t from 145 m
AMRC017
360,679
6,513,639
377
78
Auric
RC
180/-60
7m @ 0.84 g/t from 18 m
AMRC018
360,680
6,513,680
380
108
Auric
RC
182/-60
NSI
AMRC019
360,661
6,513,674
380
42
Auric
RC
183/-61
3m @ 0.62 g/t from 20 m
AMRC020
360,920
6,513,820
359
84
Auric
RC
273/-59
11m @ 1 g/t from 37 m
AMRC020
6m @ 0.78 g/t from 66 m
AMRC021
360,959
6,513,820
357
84
Auric
RC
272/-60
5m @ 0.52 g/t from 68 m
AMRC022
360,999
6,513,820
357
90
Auric
RC
272/-60
NSI
AMRC023
360,820
6,513,315
363
96
Auric
RC
183/-60
9m @ 0.85 g/t from 28 m
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
AMRC024
360,799
6,513,349
366
114
Auric
RC
184/-59
4m @ 3.45 g/t from 47 m
AMRC025
360,798
6,513,540
365
120
Auric
RC
182/-61
NSI
AMRC026
360,875
6,513,545
361
102
Auric
RC
180/-58
6m @ 0.53 g/t from 36 m
AMRC027
361,221
6,514,050
373
120
Auric
RC
274/-60
NSI
AMRC028
360,867
6,513,868
362
100
Auric
RC
274/-59
NSI
AMRC029
360,918
6,513,869
359
100
Auric
RC
272/-60
5m @ 0.55 g/t from 40 m
AMRC029
AMRC030
3m @ 0.51 g/t from 67 m
360,965
6,513,869
357
100
Auric
RC
269/-60
3m @ 0.53 g/t from 79 m
AMRC030
8m @ 0.93 g/t from 84 m
AMRC030
5m @ 0.53 g/t from 95 m
AMRC031
360,843
6,513,821
363
114
Auric
RC
271/-59
NSI
AMRC032
360,895
6,513,820
360
100
Auric
RC
273/-60
24m @ 0.7 g/t from 1 m
AMRC032
AMRC033
3m @ 0.53 g/t from 47 m
360,939
6,513,820
358
84
Auric
RC
271/-60
AMRC033
AMRC034
3m @ 0.52 g/t from 56 m
5m @ 0.5 g/t from 61 m
360,858
6,513,821
362
84
Auric
RC
090/-60
6m @ 0.76 g/t from 30 m
AMRC034
6m @ 0.72 g/t from 41 m
AMRC034
3m @ 0.51 g/t from 69 m
AMRC035
360,867
6,513,769
362
100
Auric
RC
269/-60
10m @ 0.5 g/t from 10 m
AMRC036
360,920
6,513,769
360
100
Auric
RC
271/-60
NSI
AMRC037
360,966
6,513,768
357
100
Auric
RC
269/-60
NSI
AMRC038
360,446
6,513,834
376
42
Auric
RC
182/-60
3m @ 0.55 g/t from 9 m
AMRC039
360,407
6,513,851
378
42
Auric
RC
182/-72
8m @ 0.55 g/t from 12 m
AMRC040
360,406
6,513,868
378
42
Auric
RC
179/-72
NSI
AMRC041
360,323
6,513,787
384
140
Auric
RC
181/-60
8m @ 3.02 g/t from 99 m
AMRC042
360,250
6,513,771
395
210
Auric
RC
177/-60
7m @ 0.81 g/t from 128 m
AMRC042
AMRC043
8m @ 0.58 g/t from 135 m
360,274
6,513,751
392
150
Auric
RC
183/-59
3m @ 0.52 g/t from 100 m
AMRC043
23m @ 1.11 g/t from 103 m
AMRC043
3m @ 0.53 g/t from 128 m
AMRC043
6m @ 0.57 g/t from 134 m
AMRC044
360,226
6,513,697
387
126
Auric
RC
183/-60
360,198
6,513,625
386
100
Auric
RC
182/-60
AMRC044
AMRC045
6m @ 0.52 g/t from 106 m
AMRC045
AMRC046
6m @ 0.51 g/t from 96 m
17m @ 0.78 g/t from 32 m
7m @ 0.81 g/t from 53 m
360,198
6,513,651
387
120
Auric
RC
184/-60
AMRC046
4m @ 0.85 g/t from 59 m
7m @ 0.65 g/t from 67 m
AMRC047
360,097
6,513,598
390
100
Auric
RC
186/-59
9m @ 0.78 g/t from 53 m
AMRC048
360,098
6,513,623
390
120
Auric
RC
190/-59
6m @ 0.61 g/t from 52 m
AMRC048
AMRC049
3m @ 0.61 g/t from 78 m
360,121
6,513,637
388
138
Auric
RC
184/-60
AMRC049
AMRC050
8m @ 0.73 g/t from 74 m
360,120
6,513,585
384
120
Auric
RC
185/-58
AMRC050
AMRC051
12m @ 0.56 g/t from 48 m
9m @ 1.61 g/t from 44 m
7m @ 0.54 g/t from 54 m
360,174
Auric Mining Limited
ACN 635 470 843
6,513,598
385
138
Auric
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
RC
188/-60
3m @ 0.53 g/t from 25 m
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN STOCK EXCHANGE
12 DECEMBER 2024
AMRC051
10m @ 2.59 g/t from 28 m
AMRC051
6m @ 0.8 g/t from 48 m
AMRC052
360,223
6,513,720
390
150
Auric
RC
190/-60
3m @ 0.6 g/t from 137 m
AMRC053
360,248
6,513,723
391
150
Auric
RC
184/-60
8m @ 0.64 g/t from 97 m
AMRC053
AMRC054
3m @ 0.6 g/t from 125 m
360,410
6,513,767
380
96
Auric
RC
225/-89
AMRC054
AMRC055
10m @ 0.61 g/t from 47 m
11m @ 0.97 g/t from 75 m
360,596
6,513,787
381
150
Auric
RC
182/-60
DDM1
360,673
6,513,898
371
207.72
Anaconda
DD
208/-60
NSI
DDM10
360,436
6,513,836
377
135.09
Anaconda
DD
000/-90
NSI
DDM11
360,566
6,513,959
369
204.95
Anaconda
DD
207/-60
NSI
DDM13
360,510
6,514,012
367
258.17
Anaconda
DD
195/-60
NSI
DDM15
360,638
6,513,971
368
259.99
Anaconda
DD
207/-60
NSI
DDM16
360,701
6,513,960
366
259.9
Anaconda
DD
197/-60
NSI
DDM17
360,701
6,514,242
365
69.46
Anaconda
DD
182/-60
NSI
DDM17A
360,681
6,514,212
365
463.6
Anaconda
DD
187/-62
NSI
DDM2
360,446
6,513,946
372
201.72
Anaconda
DD
180/-60
NSI
DDM3
360,743
6,513,703
371
112.78
Anaconda
DD
270/-80
NSI
DDM5
360,608
6,513,926
372
210.98
Anaconda
DD
207/-60
NSI
DDM6
360,738
6,513,899
368
231.65
Anaconda
DD
208/-57
NSI
DDM8
360,551
6,513,806
378
130.45
Anaconda
DD
240/-86
NSI
DDM9
360,504
6,513,825
379
132.1
Anaconda
DD
001/-90
3.1m @ 0.56 g/t from 110.74 m
AMRC055
4m @ 0.59 g/t from 40 m
3m @ 0.54 g/t from 133 m
DDM9
3.7m @ 0.52 g/t from 114.27 m
DEM1
360,865
6,513,706
365
162.15
Share your feedback
Discover