QUARTERLY ACTIVITY
REPORT
31 MARCH 2026
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 1
Highlights
Munda Gold Mine
• 8,886 ounces produced from the Munda Starter Pit, 46% above budget of 6,100 ounces.
• A total of 126,054 tonnes processed at a reconciled head grade of 2.46g/t and 89.5% recovery.
• Campaign Two representing the deeper portion of the Starter Pit delivered 6,168 ounces from
68,154 dry tonnes milled at a reconciled head grade of 3.18g/t.
• All Campaign Two bullion sold at an average of A$7,178 per ounce.
• Results suggest Munda is a larger, higher-grade gold deposit than previously estimated.
• Planning commenced for the Munda Main Pit.
Jeffreys Find Gold Mine
• Final cash distribution of $2.2 million received from BML Ventures Pty Ltd on 11 March 2026.
• Total cash to Auric from the Jeffreys Find joint venture is ~$16.5 million against a cash
investment of ~$1.2 million.
• The project produced 29,537 ounces, sold to the Perth Mint at an average of $3,792 per ounce,
generating total sales of $112 million.
Burbanks Gold Processing Plant
• Technical evaluation of the Burbanks plant continued during the quarter, with consultants
assessing development options.
• A detailed assessment to Scoping Study level has been initiated with Mr Scott Bailey appointed
to lead that process along with development and construction of the optimal plant design.
• The Burbanks processing plant remains central to Auric's strategy to become a fully integrated
gold producer, providing an in-house processing solution for ore from Munda, Lindsay's and
nearby projects.
Lindsay's Gold Project
• Wardens' Court proceedings relating to M27/169 is progressing, with Auric managing the
litigation on that tenement.
• Wardens’ Court proceedings relating to M27/34 and M27/486 is progressing, with Top Global
Mining managing the litigation on these tenements.
• Drill hole data compilation and structural mapping were conducted on the Lindsay's tenements
during the quarter.
Corporate
• Cash and sole debtor totals A$46 million at 31 March 2026, following sale of all Munda gold.
• Audited financial statements released on 30 March 2026: net profit after tax of $5.2 million,
revenue of $20.6 million, and free cashflow of $6.5 million.
• The Company has no debt and is unhedged.
• Current issued capital is 187,093,602 shares.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 2
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to report on its activities
during the 31 March 2026 Quarter.
Managing Director, Mark English
"The March Quarter, without question, has been the most successful in Auric's history. Campaign
Two at Munda delivered 6,168 ounces at a reconciled head grade of 3.18g/t, well above budget and
anything we anticipated when the Starter Pit was designed
"The Starter Pit has produced 8,886 ounces in total — 46% above the original reserve estimate. The
quality of these results has given us enormous confidence in the scale of the Munda Main Pit.
"With all bullion from Campaign Two sold at an average of A$7,178 per ounce, the total combined
cash, and debtor owing by Black Cat exceeds A$46 million, Auric is now in the strongest financial
position in the Company's history. We are very well placed to progress the Main Pit and to continue
building a sustainable, integrated gold producer," said Mr English.
1.0 PRINCIPAL ACTIVITIES
Munda Gold Mine activity dominated the March Quarter, with the successful completion of Campaign
Two toll processing at Black Cat Syndicate Ltd's Lakewood Mill. The full reconciliation of the
Campaign and the sale of all gold produced was completed this quarter. Mining operations at the
Munda Starter Pit were completed on 26 January 2026 with Campaign Two processing starting on
the same day.
A total of 68,154 dry metric tonnes was processed in Campaign Two, producing 6,168 ounces of gold
at a reconciled head grade of 3.18g/t combined with the 2,718 ounces from Campaign One, the overall
Starter Pit total of 8,886 ounces compares to a budget of 6,100 ounces — a 46% outperformance.
All Campaign Two bullion was sold through Auric's metal account at ABC Refinery at an average
realised price of A$7,178 per ounce. A further 18,000 tonnes of ROM stockpile material at Munda at
an estimated grade of 1.8g/t remains available for future processing, representing approximately an
additional 935 ounces after processing.
The Jeffreys Find Gold Mine joint venture with BML Ventures Pty Ltd concluded during the quarter
following receipt of the final cash distribution of $2.2 million on 11 March 2026, bringing total cash
received by Auric from the project to approximately $16.5 million (ex GST).
The Company released its audited financial statements for the year ended 31 December 2025 on 30
March 2026, reporting net profit after tax of $5.2 million and free cashflow of $6.5 million.
Corporate
The Company's cash position (plus sole debtor from Black Cat Syndicate) totalled A$46 million The
Company has no debt and is unhedged. Issued capital at 31 March 2026 is 187,093,602 shares.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 3
2.0 MUNDA GOLD MINE
2.1 Campaign Two — Mining and Haulage
Mining operations at the Munda Starter Pit were completed on 26 January 2026, following a short
recommencement of operations in early January to mine additional ore at the base of the pit. A total
of approximately 67,000 tonnes of high-grade ore had been stockpiled on the Munda ROM pad
entering the quarter. Ore haulage to Black Cat Syndicate Ltd's (ASX: BC8) Lakewood Mill commenced
on 10 January 2026,
2.2 Campaign Two — Toll Processing and Gold Production
Toll processing for the second campaign commenced on 26 January 2026, on target with the schedule
communicated to the market. Processing was conducted under the ore purchase agreement with
Black Cat Syndicate at the Lakewood Mill and was completed on 18 February 2026. A total of 68,154
dry metric tonnes were treated during the campaign.
The campaign produced four gold pours and corresponding refinery outturns, together with a final
Gold in Circuit calculation:
Gold Outturn Ounces Produced
First Outturn (10 Feb 2026) 1,147
Second Outturn (17 Feb 2026) 1,585
Third Outturn (26 Feb 2026) 2,087
Fourth Outturn (2 Mar 2026) 938
Gold in Circuit (GIC) 411
Campaign Two Total 6,168
Plus Campaign One 2,718
Starter Pit Total 8,886
Budget (ASX:AWJ 10 Dec 2024) 6,100
Variance to Budget +46%
The reconciled head grade for Campaign Two came in at 3.18g/t against a budgeted grade of 1.80g/t.
Mill recovery was 88.67% against a predicted recovery of 83.3%. Successive outturns outperformed
budget estimates for grade over the duration of the campaign. Campaign Two processed ore from
the lower half of the Starter Pit, where higher-grade intersections contributed to the elevated head
grade.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 4
The finalised production metrics for both campaigns are summarised below:
Final Production Metrics Campaign 1 Campaign 2
Dry Tonnes Milled 57,900 68,154
Reconciled Head Grade g/t 1.61 3.18
Mill Recovery 90.67% 88.67%
Gold Recovered – Ounces 2,718 6,168
2.3 Gold Sales
Auric established a metal account with ABC Refinery during the quarter, enabling the Company to
control the timing of gold sales in response to gold price movements. All bullion from Campaign Two
was sold from this account at an average realised price of A$7,178 per ounce. Following receipt of all
gold sales proceeds and after full payment of all mining, haulage, processing and related costs, the
cash at bank plus the sole debtor amount due from Black Cat Syndicate totalled A$46 million at 31
March 2026.
2.4 ROM Stockpile
In addition to the 8,886 ounces recovered from the two processing campaigns, approximately 18,000
tonnes of ore from the Starter Pit at an estimated grade of 1.8g/t remains on the ROM pad at Munda.
This represents an estimated 935 ounces after processing. Combined with the 8,886 ounces already
recovered, the Starter Pit has produced ounces approximately 61% above the original Reserve
estimate, reflecting the influence of localised very high gold grades that were difficult to fully model
prior to mining.
2.5 Development Pathway — Munda Main Pit
The Starter Pit has provided Auric with invaluable insights into the Munda orebody in terms of
resource estimation, mining techniques and processing performance. With reconciliation of gold
recovered from both campaigns now completed, the Company has commenced detailed planning for
the Munda Main Pit.
Results from the Starter Pit justify re-estimation and potentially expansion of resources at Munda that
will justify a much larger ‘Main Pit’. Resources will be remodelled to incorporate the learnings from
the Starter Pit campaigns. Detailed design work and further economic analysis is expected to lead to
permitting of the Main Pit in due course.
3.0 JEFFREYS FIND GOLD MINE
The Jeffreys Find Gold Mine joint venture concluded during the March Quarter. On 11 March 2026,
Auric received the final cash distribution of $2.2 million from BML Ventures Pty Ltd, representing
Auric's share of surplus proceeds from the final toll milling campaign at the Jeffreys Find Gold Mine
near Norseman in Western Australia. This payment concludes all matters pertaining to the joint
venture arrangement between Auric and BML Ventures Pty Ltd.
Since mining commenced in May 2023, 633,302 tonnes of ore were mined at a head grade of 1.58g/t
with recovery averaging 92%. The project produced 29,537 ounces of gold sold to the Perth Mint at
an average realised price of $3,792 per ounce, generating total gold sales revenue of $112 million
(ex GST). Auric received approximately $16.5 million (ex GST) as its 50% share of project cash
surplus from an initial investment of approximately $1.2 million.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 5
Jeffreys Find Gold Mine Stage One 2023 Total Project
Gold Recovered — Ounces 9,741 29,537
Average Sale Price per ounce AUD $3,006 $3,792
Cash to Auric $4.76M ~$16.5M
The Jeffreys Find project transformed Auric, moving from explorer to gold producer. The strong
financial outcome from Jeffreys Find significantly strengthened Auric's balance sheet and supported
the transition from JV partner at Jeffreys Find to owner-miner at the Munda Gold Project.
4.0 BURBANKS GOLD PROCESSING PLANT
The acquisition of the Burbanks Gold Processing Plant was completed by Auric on 30 September
2025. The plant is located approximately 8 kilometres south of Coolgardie and represents a key long-
term strategic asset in Auric's ambition to become a fully integrated gold producer. The plant is fully
permitted and last operated as a 180,000 tonne-per-annum Carbon-in-Leach (CIL) processing circuit
with access to grid power, a water licence, and sealed-road access.
During the March Quarter, metallurgical and engineering consultants continued technical evaluation
of the Burbanks facility. Work progressed on assessing various development and throughput options
at a desktop (pre-scoping study) level. This assessment is examining the optimal pathway to
recommission the plant for the treatment of Auric-owned ore from Munda, Lindsay's and potentially
other projects.
The Burbanks plant will provide Auric with an in-house processing solution that materially reduces
future reliance on third-party toll milling arrangements. Once refurbished, the plant would enable Auric
to capture the full margin on gold production from its own operations, representing a significant step
in the Company's evolution toward becoming a fully integrated, sustainable gold producer. No
processing activities were conducted at Burbanks during the quarter.
Key plant attributes include:
• Capacity: 180,000 tpa CIL processing circuit
• Location: 8km south of Coolgardie, WA — proximal to Munda and Lindsay's projects
• Infrastructure: Grid power connection, water licence, sealed-road access
• Permitting: Fully permitted for gold processing operations
• Tenure: 13 tenements including 3 granted Mining Leases and 5 General Purpose leases
5.0 LINDSAY'S FIND ACQUISITION
The Lindsay's Gold Project is located approximately 65 kilometres northeast of Kalgoorlie and
represents a strategically attractive addition to Auric's growing tenement package. Auric executed the
Tenement Sale Agreement on 19 November 2025, completing settlement on four tenements —
L27/82, L27/84, E27/624 and P27/2406 — for a total consideration of $300,000.
The acquisition also encompasses three additional tenements — M27/169, M27/34 and M27/486 —
that are currently subject to Wardens' Court proceedings brought by third parties. Auric assumed
management and responsibility for the Wardens' Court proceedings relating to tenement M27/169 as
part of the November 2025 agreement. The vendors, Top Global Mining, retain management
responsibility for proceedings relating to M27/34 and M27/486 until those matters are resolved.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 6
Under the agreed acquisition terms:
• Subject to successful resolution of litigation on M27/169, Auric will make a further cash payment
of A$1.3 million and issue A$2.0 million in Auric shares to the vendor.
• A cash payment of $300,000 is payable to the vendor following the successful resolution of
litigation on M27/34 and M27/486.
• The vendor retains management of M27/34 and M27/486 until successful resolution of the
Wardens' Court litigation.
• Payment of a net smelter royalty of 3.5% gold produced from the Lindsay’s Project.
The Wardens' Court proceedings relating to M27/169 remained ongoing during the March Quarter.
Drill hole data compilation and structural mapping were conducted on the Lindsay's tenements during
the period. The Lindsay's project is prospective for gold mineralisation and, together with the Burbanks
processing plant, forms part of Auric's broader strategy to develop a pipeline of near-infrastructure
gold projects capable of early production.
6.0 FY2025 FINANCIAL RESULTS
Auric released its audited financial statements for the year ended 31 December 2025 on 30 March
2026. The results represent a defining year for the Company, reflecting its successful transition from
explorer to miner and gold producer.
Key Financial Metrics FY2025 FY2024
Total Revenue $20,620,000 $8,450,000
Net Profit After Tax $5,170,000 $2,690,000
Total Assets $34,773,000 $21,621,000
Total Equity $29,746,000 $17,937,000
Free Cashflow $6,504,000 $2,837,000
Revenue grew 144% to $20.6 million and net profit after tax rose 92% to $5.2 million, marking the
third consecutive year of profitability. In addition, the previously announced acquisition of the
Burbanks Processing Facility will provide Auric with long-term processing capacity to support its
strategy of becoming a fully integrated gold producer. With a strong balance sheet, increasing
production profile, and exposure to a favourable gold price environment, Auric is well positioned for
continued growth.
7.0 OTHER EXPLORATION
No other significant exploration activities were undertaken during the March 2026 Quarter. Planning
is continuing for RC and aircore drilling campaigns across Higginsville (Loded Dog), Chalice West,
Spargoville and Widgiemooltha tenements, with these activities anticipated in Q2 and Q3 in 2026.
8.0 HERITAGE
No heritage surveys or ground-disturbing heritage activities were undertaken during the March 2026
Quarter. All operations at the Munda Gold Mine were conducted within previously cleared and
approved disturbance areas. No exploration or development activities were carried out on newly
acquired tenements during the period.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 7
9.0 SAFETY
There were no alternate duty injuries (ADI) and no medically treated injuries (MTI) reported during the
quarter. There were no lost time incidents (LTI) recorded during the quarter.
10.0 ASX COMPLIANCE
10.1 Compliance Statement
The information in this report that relates to exploration results and gold production is extracted from
the Company's following ASX announcements, which are available to view on the Company's website,
www.auricmining.com.au:
Date Details
14 Jan 2026 Munda Gold Mine — Mining and Processing Update
27 Jan 2026 Munda Gold Mine — Status Update
27 Jan 2026 December 2025 Quarterly Activities Report
12 Feb 2026 First 2026 Munda Starter Pit Gold Outturn
27 Feb 2026 Outstanding 2026 Gold Outturns and Munda Update
9 Mar 2026 Munda Starter Pit Outperforms with Exceptional Results
12 Mar 2026 Golden Finish for Jeffreys Find — Auric Banks Final $2.2M
19 Mar 2026 Munda Starter Pit Final Golden Results
24 Mar 2026 Shining Finale to Munda Starter Pit
30 Mar 2026 31 December 2025 Financial Year — $5.2 Million Profit After Tax
ASX Announcements referred to from previous quarters
Date Details
10 Dec 2024 Munda Gold Deposit Starter Pit Ore Reserve
1 Dec 2025 Munda Gold Mine Campaign One Results
The Company confirms that it is not aware of any new information or data that materially affects the
information included in the original market announcements released during the quarter. The Company
further confirms that the form and context in which the Competent Persons' findings are presented
have not been materially modified from those original announcements. With respect to ASX Listing
Rules 5.3 and 5.5, the Company confirms that it continues to be classified as a mining exploration
entity.
Mining, ore haulage, toll milling, gold production and gold sales were undertaken at the Munda Gold
Mine during the March 2026 Quarter under the Ore Purchase and Processing Agreement with Black
Cat Syndicate Ltd (ASX: BC8). Auric confirms that it is operating in its own right at Munda and that all
technical parameters, production metrics and operational assumptions disclosed in prior market
announcements remain current and unchanged, except where updated by announcements released
during the quarter.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 8
10.2 Forward Looking Statements
This Announcement contains forward-looking statements which are identified by words such as 'may',
'could', 'should', 'believes', 'estimates', 'targets', 'expected', or 'intends' and other similar words that
involve risks and uncertainties. These statements are based on an assessment of present economic
and operating conditions, and on a number of assumptions regarding future events and actions that,
as at the date of this Announcement, are considered reasonable. Such forward-looking statements
are not a guarantee of future performance and involve known and unknown risks, uncertainties,
assumptions and other important factors, many of which are beyond the control of the Company, the
Directors and the management. The Directors cannot and do not give any assurance that the results,
performance or achievements expressed or implied by the forward-looking statements contained in
this Announcement will actually occur and investors are cautioned not to place undue reliance on
these forward-looking statements.
11.0 TENEMENTS
The attached schedule lists the mining tenements held at 31 March 2026. Applications for two
tenements were lodged and for three tenements withdrawn during the March 2026 Quarter. Auric
continues to hold interests across the Widgiemooltha Gold Project (including Munda), Jeffreys Find,
Spargoville, Chalice West, Burbanks Gold Processing Plant, and Lindsay's Gold Project.
New tenement applications during March 2026 Quarter
Tenement Project Mineral Rights
E15/2174 Spargoville 100% All Minerals
E27/759 Lindsay’s 100% All Minerals
Relinquished tenements during March 2026 Quarter
Tenement Project Mineral Rights
P24/5842 Spargoville 100% All Minerals
E15/2069 Widgiemooltha 100% All Minerals
E15/2073 Widgiemooltha 100% All Minerals
11.1 Farm-in or Farm-out Agreements
Auric is not party to any Farm-in or Farm-out agreements.
12.0 RELATED PARTY PAYMENTS
The Company paid salaries, superannuation, annual leave and other employment entitlements to full
time employee Directors and related parties of the Company of approximately $295,000 during the
quarter. The Company also paid $16,666 to Director-related parties of the Company. These costs are
included in administration costs and working capital except when technical staff are working in the
field, in which case those direct costs are allocated to the relevant tenements and projects and are
included in the 31 March 2026 Appendix 5B.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 9
Figure 1. Auric’s projects in the Widgiemooltha-Norseman area.
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 10
Auric Mining Ltd
Auric Mining Ltd was established to explore for and develop gold and other mineral deposits in the
Widgiemooltha–Norseman area of Western Australia. Auric has tenements covering 521km². Auric
holds the rights to gold on all tenements, including those held in the name of Mt Edwards Critical
Metals Pty Ltd. At Munda it holds all mineral rights except lithium. For all other tenements, excluding
those held in the name of Mt Edwards Critical Metals Pty Ltd, Auric holds 100% of all mineral rights.
The tenements are separated into six projects:
The Widgiemooltha Gold Project including the Munda Gold Mine
Located near the town of Widgiemooltha, the Widgiemooltha Gold Project combines 35 tenements
including 5 granted Mining Leases. All tenements are highly prospective for gold mineralisation. The
Munda Gold Mine has now completed two successful toll-milling campaigns from the Starter Pit and
is progressing into detailed planning for the much larger Munda Main Pit.
The Jeffreys Find Gold Mine
The Jeffreys Find Gold Mine is located 50km northeast of Norseman and combines 3 tenements
including 1 granted Mining Lease. Open pit mining was completed via a joint venture with BML
Ventures Pty Ltd, with all surplus cash distributions concluded during the March 2026 Quarter.
The Spargoville Project
The Spargoville Project is located 30km north of Widgiemooltha and combines 12 tenements. It lies
in similar stratigraphy, proximal to the Wattle Dam Gold Mine, which produced 268,000oz gold at
10g/t from 2006–13, one of Australia's highest-grade mines at that time.
The Chalice West Project
Located 50km southwest of Widgiemooltha, the Chalice West Project combines 4 tenements and
covers 245km², including geology mirroring the Chalice Gold Mine, which produced almost 700,000
ounces of gold. The project is also prospective for Rare Earth Elements (REE) and Ni-Cu and Pt-Pd
deposits.
The Burbanks Gold Processing Plant
The Burbanks Gold Processing Plant is located 8km south of Coolgardie and combines 13 tenements
including 3 granted Mining Leases and 5 General Purpose leases. The plant is fully permitted with
access to grid power, sealed road, and a water licence. It provides Auric with an in-house processing
solution for gold ore from Munda, Lindsay's and other nearby projects, and is central to the Company's
ambition to become a fully integrated gold producer.
The Lindsay's Gold Project
The Lindsay's Gold Project is located 65km northeast of Kalgoorlie and currently combines 6
tenements. Auric has the right to purchase 3 further tenements subject to resolution of Wardens' Court
proceedings by third parties against those tenements.
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
T +61 409 372 775
E menglish@auricmining.com.au
Investor Relations
Alex Cowie
Director
NWR Communications
T +61 412 952 610
E alexc@nwrcommunications.com.au
Follow our communications
Click here to subscribe to our
updates
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 11
Schedule of Tenements
The following table lists the mining tenements held by Auric Mining Limited and its subsidiaries as at
31 March 2026.
Tenement Project Location Status Registered Holder Mineral Rights
Widgiemooltha Gold Project (including Munda Gold Mine and Loded Dog Tenements)
M15/74 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
M15/75 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
M15/698 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
M15/699 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
M15/87 Widgiemooltha WA Live Widgie Gold
100% All Minerals except
Ni, Li
E15/1553 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
E15/1576 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
E15/1583 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
E15/1749 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
E15/1864 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% All minerals
E15/1949 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1950 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/2042 Widgiemooltha WA Pending Widgie Gold 100% All minerals
E15/2043 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/2151 Widgiemooltha WA Pending Widgie Gold 100% All minerals
P15/6362 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
P15/6387 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
P15/6539 Widgiemooltha WA Pending
Mt Edwards Critical
Metals
100% Au Rights
P15/6570 Widgiemooltha WA Live
Mt Edwards Critical
Metals
100% Au Rights
P15/6808 Widgiemooltha WA Live Widgie Gold 100% All minerals
P15/6853 Widgiemooltha WA Pending Widgie Gold 100% All minerals
P15/6994 Widgiemooltha WA Pending Widgie Gold 100% All minerals
P63/2279 Widgiemooltha WA Live Widgie Gold 100% All minerals
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 12
P63/2280 Widgiemooltha WA Live Widgie Gold 100% All minerals
L15/414 Widgiemooltha WA Live Widgie Gold Infrastructure
L15/495 Widgiemooltha WA Pending Widgie Gold 100% All Minerals
L15/496 Widgiemooltha WA Live Widgie Gold 100% All Minerals
E15/1489 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1523 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1588 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1773 Widgiemooltha WA Live Widgie Gold 100% All minerals
E63/1780 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1919 Widgiemooltha WA Live Widgie Gold 100% All minerals
E15/1957 Widgiemooltha WA Live Widgie Gold 100% All minerals
E63/2103 Widgiemooltha WA Live Widgie Gold 100% All minerals
Jeffreys Find Gold Mine
M63/242 Jeffreys Find WA Live Jeffreys Find 100% All Minerals
E63/2535 Jeffreys Find WA Pending Jeffreys Find 100% All Minerals
L63/97 Jeffreys Find WA Live Jeffreys Find Infrastructure
Spargoville Project
M15/1899 Spargoville WA Pending
Mt Edwards Critical
Metals
100% All Minerals
E15/1665 Spargoville WA Pending
Mt Edwards Critical
Metals
100% All Minerals
E15/1688 Spargoville WA Live Spargoville Minerals 100% All Minerals
E15/1689 Spargoville WA Live Spargoville Minerals 100% All Minerals
E15/2123 Spargoville WA Pending Spargoville Minerals 100% All Minerals
E15/2174 Spargoville WA Pending Spargoville Minerals 100% All Minerals
E26/262 Spargoville WA Live Spargoville Minerals 100% All Minerals
P15/5905 Spargoville WA Live Spargoville Minerals 100% All Minerals
P15/5906 Spargoville WA Live Spargoville Minerals 100% All Minerals
P15/6408 Spargoville WA Live Spargoville Minerals 100% All Minerals
P15/6758 Spargoville WA Live Spargoville Minerals 100% All Minerals
P24/5842 Spargoville WA Live Spargoville Minerals 100% All Minerals
Chalice West Project
E15/1801 Chalice West WA Live Chalice West 100% All Minerals
E15/1945 Chalice West WA Live Chalice West 100% All Minerals
E63/2483 Chalice West WA Live Chalice West 100% All Minerals
E63/2484 Chalice West WA Live Chalice West 100% All Minerals
Burbanks Gold Processing Plant
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 13
M15/1273 Burbanks WA Live BBL Milling 100% All Minerals
M15/1369 Burbanks WA Live BBL Milling 100% All Minerals
M15/1370 Burbanks WA Live BBL Milling 100% All Minerals
G15/10 Burbanks WA Live BBL Milling 100% All Minerals
G15/11 Burbanks WA Live BBL Milling 100% All Minerals
G15/12 Burbanks WA Live BBL Milling 100% All Minerals
G15/13 Burbanks WA Live BBL Milling 100% All Minerals
G15/25 Burbanks WA Live BBL Milling 100% All Minerals
L15/109 Burbanks WA Live BBL Milling 100% All Minerals
L15/110 Burbanks WA Live BBL Milling 100% All Minerals
L15/189 Burbanks WA Live BBL Milling 100% All Minerals
L15/234 Burbanks WA Live BBL Milling 100% All Minerals
L15/284 Burbanks WA Live BBL Milling 100% All Minerals
Lindsay's Gold Project
E27/624 Lindsay's WA Live LMG (WA) 100% All Minerals
E27/246 Lindsay's WA Pending LMG (WA) 100% All Minerals
E27/759 Lindsay's WA Pending LMG (WA) 100% All Minerals
P27/2406 Lindsay's WA Live LMG (WA) 100% All Minerals
L27/82 Lindsay's WA Live LMG (WA) 100% All Minerals
L27/84 Lindsay's WA Live LMG (WA) 100% All Minerals
Quarterly Report 31 March 2026
Auric Mining Limited | ASX: AWJ | auricmining.com.au 14
Auric Mining Limited
Level 1, 1 Tully Road
East Perth WA 6004
Australia
T +61 8 9548 9997
E info@auricmining.com.au
auricmining.com.au
ASX: AWJ
Share your feedback
Discover