Starter Pit Underway at Munda Gold Mine
Released
Released
Announcement PDF
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE
14 APRIL 2025
Munda Gold Mine
Starter Pit Underway
Highlights
•
Munda Mining Proposal and Mine Closure Plan approved.
•
Starter Pit site preparation commenced.
•
Munda will be mined by Auric, in its own right, with Auric employees.
•
Grade control drilling on a 5m x 5m pattern completed.
•
Contracts executed for mining fleet hire, drill and blast and key suppliers.
•
Mine camp for 12 people established near Munda.
Management Comment
Managing Director, Mark English, said: “This is a milestone moment for Auric. Our
whole team is full of optimism and excited to commence the Munda Gold Mine
Starter Pit.
“Munda is our major asset; containing a sizeable gold resource. We will start out
conservatively with a target to mine 125,000 tonnes of ore, producing around 6,100
ounces of gold at a projected AISC of A$2,635 per ounce.
“We are right on schedule and have mobilised all the necessary machinery and
infrastructure. Earth works have commenced, we will begin mining in a few days.
“The Starter Pit will take us approximately six months to complete.
“The project is another significant step, both in our ambition to become a substantial
gold producer in the district, and to develop Munda to its full potential.” said Mr
English.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE
14 APRIL 2025
Photo 1: MHM Contracting 40-tonne Moxy dump trucks on site at Munda Gold Mine.
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) advises it has begun
mobilising plant and equipment including a dry hire fleet to the Munda Gold Mine
site, 5km from Widgiemooltha, Western Australia. Site preparation is underway for
the imminent mining of a Starter Pit.
The Munda Starter Pit Mining Proposal and Mine Closure Plan have been approved
by the WA Government’s Department of Energy, Mines, Industry Regulation and
Safety (DEMIRS).
Survey mark-out of the pit crest, haul road, waste dump, ROM pads and site office
has been completed.
Auric has executed a contract to dry hire the mining fleet from MHM Contracting
Pty Ltd. The fleet will be operated by Auric employees.
A grade control program over the Starter Pit extents for those holes accessible from
surface on a 5m x 5m pattern has also been completed. A total of 428 holes for
14,670m were drilled by Kalgoorlie-based Total Drilling Services. Results have been
received allowing the mine geologists to define near surface ore blocks in advance
of mining. Further grade control drilling on a 5m x 5m pattern will be undertaken as
mining exposes new benches.
The Company will commence mining the Starter Pit this week, where it is estimated
125,000 tonnes of ore will be extracted at an estimated grade of 1.8g/t Au at an
AISC of A$2,635 per ounce (Tables 2 and 3). The Starter Pit will take approximately
six months to complete.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE
14 APRIL 2025
A project team including mine geologists, a site senior executive, administrative staff
and other employees have begun mobilising to site. Staff are being
accommodated at a 12-man camp established 6km from the mine site.
Photo 2: MHM Contracting Excavator being transported to the Munda Gold Mine.
The Starter Pit is the first stage in the Company’s plans to mine a substantially larger
part of the Munda Resources (Table 1). After completion of the Starter Pit and a full
analysis of the results, Auric will then commence pit optimisation and mine planning
for a much larger pit at Munda. Depending on the results of the Starter Pit and the
subsequent work, it is our ambition to be mining a larger pit by mid/late 2026.
The following table is extracted from the report Munda Gold Deposit Updated
Mineral Resources Precursor to Starter Pit Mining announced to the ASX on 10
December 2024:
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE
14 APRIL 2025
Table 1 November 2024 Munda gold deposit Mineral Resource estimates
Au g/t
Cut-off
Indicated
MTonnes Au g/t
0.20
0.30
0.40
0.50
0.60
0.70
0.80
0.90
1.00
7.56
5.51
4.24
3.35
2.71
2.24
1.89
1.62
1.41
0.72
0.89
1.06
1.22
1.38
1.53
1.67
1.81
1.94
Koz
MTonnes
Inferred
Au g/t
Koz
175
158
144
131
120
110
101
94
88
0.5
0.4
0.3
0.3
0.2
0.2
0.2
0.1
0.1
0.9
1.0
1.2
1.4
1.5
1.7
1.9
2.0
2.1
14
13
12
14
10
11
12
6
7
Indicated + Inferred
MTonnes Au g/t
Koz
8.06
5.91
4.54
3.65
2.91
2.44
2.09
1.72
1.51
0.73
0.90
1.07
1.23
1.39
1.54
1.69
1.82
1.95
189
171
156
145
130
121
114
101
95
Note - figures are rounded to reflect the precision of the estimates and include
rounding errors.
Tables 2 and 3 are extracted from the report Munda Gold Deposit Starter Pit Ore
Reserve announced to the ASX on 10 December 2024:
Table 2. Munda Starter Pit Probable Ore Reserve
Tonnage
(t)
0
Proved
Grade
(g/t)
0.0
Ounces
(ozs)
0
Tonnage
(t)
125,000
Probable
Grade Ounces
(g/t)
(ozs)
1.8
7,400
Tonnage
(t)
125,000
Total
Grade
(g/t)
1.8
Ounces
(ozs)
7,400
Note – Rounding errors may occur
Table 3. Key parameters defined by the Starter Pit Pre-Feasibility Study
Parameter
Unit
Pre-Feasibility Study November 2024
General
Start Date
Quarter
March 2025
Project Life (mining)
Months
5.0
Project Life (milling)
Months
5.0
Mining
Ore Tonnes
Kt
125
Grade
g/t
1.8
Contained Gold
Koz
7.3
Processing
Ore Processed
Kt
125
Grade
g/t
1.8
Recovery (average)
%
83
Gold Production
Koz
6.1
Financial
Gold Price Assumption
A$/oz
3,500
Upfront Project Capital Cost
A$M
6.5
AISC
A$/oz
2,635
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE
14 APRIL 2025
Compliance Statements
Information on the Resource Estimates for Munda is extracted from the report
Munda Gold Deposit Updated Mineral Resources Precursor to Starter Pit Mining
announced to the ASX on 10 December 2024 and is available to view on the
Company’s website; www.auricmining.com.au. The Company confirms that it is not
aware of any new information or data that materially affects the information
included in the original market announcement. The Company confirms that the
form and context in which the Competent Person’s findings are presented have not
been materially modified from the original market announcement.
Information on the Ore Reserve for the Munda Starter Pit is extracted from the report
Munda Gold Deposit Starter Pit Ore Reserve announced to the ASX on 10 December
2024 and is available to view on the Company’s website; www.auricmining.com.au.
The Company confirms that it is not aware of any new information or data that
materially affects the information included in the original market announcement.
The Company confirms that the form and context in which the Competent Person’s
findings are presented have not been materially modified from the original market
announcement.
Forward Looking Statement
This Announcement may contain forward-looking statements which are identified
by words such as ‘may’, ‘much’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’,
‘expecting’, or ‘intends’ and other similar words that involve risks and uncertainties.
These statements are based on an assessment of present economic and operating
conditions, and on a number of assumptions regarding future events and actions
that, as at the date of this Announcement, are considered reasonable. Such
forward-looking statements are not a guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions, and other important factors,
many of which are beyond the control of the Company, the Directors, and the
management. The Directors cannot and do not give any assurance that the results,
performance, or achievements expressed or implied by the forward-looking
statements contained in this Announcement will actually occur and investors are
cautioned not to place undue reliance on these forward-looking statements.
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE
14 APRIL 2025
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Investor Relations
Follow our
communications
Mark English
Managing Director
Auric Mining Limited
Alex Cowie
Director
NWR Communications
Click here to subscribe
to our updates
T +61 409 372 775
T +61 412 952 610
E menglish@auricmining.com.au E alexc@nwrcommunications.com.au
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Share your feedback