Auric Updated Investor Presentation
Released
Released
Announcement PDF
Auric Emerging
as a Resource
Rising Star
On target to have gold production
from two mines in 2024-2025.
1 March 2024
Forward Looking Statements and Compliance Statement
This presentation does not include all available Information on Auric Mining Limited and should not be
used in isolation as a guide to investing in the Company. Any potential investor should also refer to
Auric Mining Limited’s Annual Reports and take independent professional advice before considering
investing in the Company. For further information about Auric Mining Limited, visit o website
auricmining.com.au.
Forward-Looking Statement
This Presentation contains forward-looking statements which are identified by words such as ‘may’,
‘could’, ‘believes’, ‘estimates’, ‘targets’, ‘expect’, or ‘intends’ and other similar words that involve risks
and uncertainties. These statements are based on an assessment of present economic and operating
conditions, and on a number of assumptions regarding future events and actions that, as at the date of
this Presentation, are considered reasonable. Such forward-looking statements are not a guarantee of
future performance and involve known and unknown risks, uncertainties, assumptions and other
important factors, many of which are beyond the control of the Company, the Directors and the
management. The Directors cannot and do not give any assurance that the results, performance or
achievements expressed or implied by the forward-looking statements contained in this Presentation
will actually occur and investors are cautioned not to place undue reliance on these forward -looking
statements.
Compliance Statement
The information in this presentation relating to exploration results, mineral resource estimates and the
Munda scoping study is extracted from the following announcements all of which are available to view
on the Auric website www.auricmining.com.au. The company confirms that it is not aware of any new
information or data that materially affects the information included in the original market
announcements and, in the case of estimates of Mineral Resources and of the scoping study, that all
material assumptions and technical parameters underpinning the estimates in the relevant market
announcements continue to apply and have not materially changed. The company confirms that the
form and context in which the Competent Person’s findings are presented have not been materially
modified from the original market announcements.
10 February 2021
Prospectus
2 March 2021
Auric Mining Limited Resource Summary and Exploration Update
28 January 2022
Increase in Estimated Resources at Munda and Reclassification from Inferred to
Indicated
Disclaimer
• Whilst care has been exercised in preparing and presenting this presentation, to the maximum
extent permitted by law, the Company and its representatives:
• Make no representation, warranty or undertaking, express or implied, as to the adequacy, accuracy,
completeness or reasonableness of this Presentation;
• Accept no responsibility or liability as to the adequacy, accuracy, completeness or reasonableness
of this Presentation; and
• Accept no responsibility for any errors or omissions from this Presentation.
11 July 2022
Positive Scoping Study for Jeffreys Find Project
22 August 2022
Agreement Executed to Commence Gold Mining at Jeffreys Find
28 June 2023
Positive Scoping Study for Munda Gold Project
27 October 2023
Grade Control Drilling at Munda Gold Project
1 December 2023
Auric banks another $1.3M, total cash now $4.77M
Mineral Resources Reporting Requirements
As an Australian Company with securities listed on the Australian Securities Exchange (ASX), Auric is
subject to Australian disclosure requirements and standards, including the requirements of the
Corporations Act 2001 and the ASX. Investors should note that it is a requirement of the ASX listing
rules that the reporting of mineral resources in Australia is in accordance with the JORC Code and that
Auric’s mineral resource estimates are reported in compliance with the JORC Code, 2012 edition. The
terms used in this announcement are as defined in the JORC Code.
30 January 2024
Numerous high grade gold intercepts at Munda Grade Control
31 January 2024
Quarterly Activities Report
22 February 2024
More than 300,000 tonnes to be mined at Jeffreys Find
2
A world-class
address.
•
Auric Mining
Projects
Auric’s tenements are between Kalgoorlie
and Norseman in the heart of The
Goldfields of Western Australia.
Brisbane
Kalgoorlie
Perth
•
The best infrastructure and support
services in Australia for gold mining.
Sydney
Melbourne
•
Considered the most attractive region in
the world for mining investment based on
supportive government policies and
mineral potential.
•
Outstanding location for mining
investment based on mineral potential.
3
Producing from two gold mines in 2024-25.
• Norseman
•
Mining underway for 2024 with expectation to
toll mill 300,000+ tonnes of gold ore.
Last year 175,000 tonnes mined at Jeffreys Find
Gold Mine for almost $10m in surplus cash for
JV.
• Widgiemooltha
Plan to mine gold resource at Munda with a
starter pit in late 2024/early 2025.
…and a cash pipeline
• Emerging road map for five years of
continuous gold production.
4
Jeffreys Find Gold Mine
Rapid timeline to cash creation
ACQUISTION
ASX
METALLURGY
MINE STUDY
CONTRACTOR
APPROVALS
Sep 2020
Acquisition of
Jeffreys Find
tenement from
Mincor Resources.
Feb 2021
Auric Mining listed
on the Australian
Stock Exchange.
May 2022
Company
confirms strong
test results
Jul 2022
Scoping study
predicts a
profitable mine
Feb 2023
BML Ventures of
Kalgoorlie
appointed as
contractor and
JV partner.
Apr 2023
All necessary
approvals
granted.
START
FIRST GOLD
CASH
HIGH YIELD
RESULT
May 2023
First Stage mining
commences.
Aug 2023
Maiden parcel of
36,000t from
Jeffreys Find yields
1,720 ounces of
gold.
Oct 2023
Auric receives first
cash.
Nov 2023
First Stage mining
concludes producing
9,741 ounces of gold
Dec 2023
Final result from
Stage One mining
sees Auric bank
$4.77 million.
5
Jeffreys Find already
a $10m earner with
much more to come
in 2024
Auric management were hosted at the Perth Mint refinery
where gold bars from Jeffreys Find mine were poured
Jeffreys Find Gold Mine
Stage One - Finished
•
•
•
The Jeffreys Find tenements are 42kms east of
Norseman in the Goldfields of WA.
A tremendous investment
•
Total cash cost to Auric to date only $1.425 million.
•
Stage One of mining was completed in November 2023.
Two campaigns produced 9,741 ounces of gold at an
average yield of 1.86 g/t. From Stage One Auric banked
$4.77m.
BML Ventures of Kalgoorlie as the JV Contractor bears
the brunt of risk and assumes all overheads. Auric shares
50:50 in cash surpluses.
•
Approximately 176,000 tonnes of ore was processed in
Stage One. A contract to process a minimum of 300,000
tonnes of ore has been signed for 2024.
Project is performing well and with gold prices above
$3,000+ an ounce project has proved to be a wellexecuted investment for Auric.
•
Cash generated from Jeffreys Find ensures Auric is
self-funding throughout 2024.
Stage Two - Underway
•
Mining now commenced for final phase with project due
for completion in early 2025.
2023
2024
2025
First Phase
Final Pit
Finish
7
All roads lead to
Munda.
Flagship asset holds approximately
200,000 ounces of mineral
resources.
Munda Gold Project
1. Flagship asset adjacent to the township of Widgiemooltha
estimated to contain approximately 200,000 ounces of gold
resources.
2. Munda’s average grade exceeds 2g/t at a 0.5g/t cut-off.
Once mined, ore would be hauled to a nearby mill for toll
treating.
3. A scoping study in mid-2023 envisaged extracting between
112,000 and 129,000 ounces of gold from the project over
a three to five-year mine life.
4. The scoping study base case suggested a free cash surplus
for the project to be $77 million based on a gold price of
$2,600 an ounce.
5. Grade control drilling completed in January 2024 has
further advanced the project.
6. Planning is now well advanced to commence shallow, openpit mining in Q4 2024 or Q1 2025 before expanded mining
from 2025 onwards.
2023
2024
2025
Grade Control
Drilling
Starter
Pit
3-5 Year
Mine Life
9
Highest Grade Intersections at
Munda Gold Project
Best 15 holes from Grade Control Drilling
Hole ID
From (m)
To (m)
Length
(m)
Au (g/t)
Grade x
Length
EMD002
102
148
46.00
8.40
386.2
MIRC004
51
52
1.00
321.00
321.0
MND1406
53
70
17.00
17.65
300.1
MGCR0401
8
24
16.00
12.54
200.6
MGCR0057
18
27
9.00
21.37
192.3
AMRC012
60
73
13.00
14.62
190.1
MND1405
72
83
11.00
16.51
181.6
MND1417
111
130
19.00
9.29
176.6
MND1508
96
114
18.00
9.09
163.6
MND1407
70
76
6.00
26.98
161.9
MIRC009
46
51
5.00
31.23
156.2
MIRC014
40
48
8.00
16.07
128.5
MND1636
94
100
6.00
20.44
122.6
MND1628
5
17
12.00
9.65
115.8
MND1669
47
61
14.00
7.18
100.5
(Intersections greater than 100 gram x metres per tonne)
10
Munda is part of the
Widgiemooltha Gold Project.
•
Auric has substantial coverage at the north end of the
Widgiemooltha Dome, proximal to a number of gold, nickel
and lithium deposits.
•
Even with the extensive mining history in the area,
considerable exploration prospectivity remains.
•
Significant gold projects discovered or developed in the past
ten years, including:
•
•
Karora Resources (TSX:KRR); Higginsville Gold
Operations (resources of 38.08Mt @ 1.7g/t for
2,015,000oz Au)¹;
•
Karora Resources; Beta Hunt (resources of 29.32Mt at
2.5g/t for 2,403,000oz Au)²
Total of 22 tenements including 5 granted Mining Leases.
1 (TSX:KRR) Karora Resources 31 January 2022
2.(TSX:KRR) Karora Resources 13 February 2023
11
Spargoville Project
•
Auric’s tenements are just north and along strike to
the Wattle Dam Gold Mine.
•
Wattle Dam was a prolific mine, producing 268,000
ounces of gold at 10.6 g/t during the period 20062013.
•
Tenements E15/1688 and E15/1689 are also
positioned along strike and south of Spargos
Reward currently being mined by Karora Resources.
•
The Spargoville tenements are in close proximity to
Astral Resources 1.3M oz Mandilla Gold Project
and surrounded by tenements held by Kali Metals,
Marquee Resources and Maximus Resources,
exploration companies with a focus on lithium.
12
Next Steps.....
• Stay gold-focused
• Look to acquire gold assets only in the
heart of The Goldfields of WA.
• Rigorous exploration including drill
programs at our promising tenements.
• Continue to acquire projects.
• Remain open to M&A discussions.
A management team
with credibility and
vision.
From left to right:
Mark English, Managing Director
Steven Morris, Non-Executive Chairman
John Utley, Technical Director
At the Perth Mint in October 2023 holding gold bars from the
Jeffreys Find Gold Mine.
14
Auric’s directors
With a track record of successful discovery, development and production from gold
deposits, Auric’s management team is ahead of the pack.
They are now steering the Company towards becoming a highly profitable gold
producer with a cash pipeline for years to come.
Steven Morris
Mark English
John Utley
Non-Executive Chairman
Managing Director
Technical Director
Steven has over 25 years’ experience in financial
markets. He was Head of Private Clients
(Australia) for Patersons Securities, Managing
Director of Intersuisse Ltd, Founder and
Managing Director of Peloton Shareholder
Services and held senior executive roles in the
Little Group.
Mark has a Bachelor of Business degree, is a
Chartered Accountant and a member of the
Australian Institute of Company Directors. Mark
has 40-year career in the resources sector and in
corporate services.
John holds a Master’s degree in earth sciences from the
University of Waikato in New Zealand. He has a 35 year
career in mining and exploration focussed on the gold
sector and is a member of the Australian Institute of
Geoscientists (AIG) and the Australian Institute of Mining
and Metallurgy (AusIMM).
Steven spent nine years on the board of the
Melbourne Football Club.
Steven was a Non-Executive Director of De Grey
Mining Ltd (“DEG”) from 2014 to 2019 and
Chairman of ASX-listed Purifloh Ltd (“PO3”) from
2013 to 2019.
As Managing Director he spearheaded Auric’s
march to an ASX listing and on a day-to-day
basis has particular responsibility for Company
strategy, financial management, corporate
development and acquisition opportunities. Mark
was a founding Director of Bullion Minerals Ltd
(now Devex Resources Ltd (“DEV”)), that he
managed for 10 years including completing an
IPO.
John has worked in Australia, South America, Papua New
Guinea and in Canada where he was Chief Geologist for
Atlantic Gold Corporation, during exploration and
development of the Touquoy Gold Mine and other gold
deposits in Nova Scotia, prior to its acquisition by St
Barbara. John previously worked with Plutonic Resources
Ltd, where he was head of the exploration team at Darlot
Gold Mine, during the discovery and development of the
2.3 million ounce Centenary gold deposit.
15
Key Corporate Statistics
130.8
million
Shares on Issue
822
Number of shareholders
51.5%
16.82
million
Options ($0.15 exercise price)
48.5%
Shareholders
on grouped
basis
48.5%
Top 20 shareholders
(expire 31 March 2024)
$15.0
million
Market Cap (22.2.2024)
$4.7
million
Cash at Bank (31.12.2023)
Top 20 - including Directors
Other Shareholders
16
Auric ticks all the right boxes
Right Place
Right Mineral
Right People
• World-class address in the
heart of WA’s Goldfields.
• The best infrastructure in
Australia for gold mining.
• Nestled amongst some of the
largest gold, nickel and lithium
projects on the globe.
• Considered the most attractive
region in the world for mining
investment based on
supportive government policies
and mineral potential.
• Gold focused.
• Nearly 10,000 ounces of gold
produced in 2023 from
Jeffreys Find with plan to
double tonnage mined in
2024/25
• Nearly 200,000 ounces of gold
resource at Munda with mining
to commence in 2024 and an
aim to extract up to 120,000
ounces.
• Board and leadership team
with track record of delivering
success for shareholders.
• Capability to identify and
acquire viable projects and
tenements at competitive
prices.
• Emerging pipeline for five
years of positive cashflow and
profits.
Excellent Pipeline
Brownfields – Widgiemooltha and Spargoville
Development – Munda
Production – Jeffreys Find
Right Structure
• Remarkable progression from
IPO and ASX listing to mining
and cash in the bank in just
three years.
• Company is self-funding for
2024.
• Top 20 shareholders own
substantial stake of company
• Directors with skin in the game
holding a 17% interest.
17
The quest to find and
mine a million ounces
of gold just got a whole
lot more exciting at
Auric Mining.
Thank You
Follow our communications
18
Share your feedback
Discover