Integrated Study Advances Burbanks and Munda
Released
Released
Announcement PDF
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 1
auricmining
ASX Announcement
27 July 2026
ASX: AWJ | ACN 635 470 843
Integrated Study Supports the Development of Burbanks and Munda
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to present the outcomes of the
Integrated Burbanks and Munda Scoping Study that support the re-establishment of the Burbanks
processing facility (Burbanks) and the restart of mining at the Munda gold deposit (Munda), located
in the Goldfields region of Western Australia (the Project).
Re-establishment of Burbanks provides a pathway to establishing a standalone integrated gold
producer. The capital estimate for the Burbanks re-establishment has been completed to PFS-level
accuracy. The overall Integrated Burbanks and Munda Study is a Scoping Study, reflecting the
additional technical, permitting and development work required at Munda.
Cautionary Statement
The Scoping Study referred to in this announcement has been undertaken to determine the viability
of the re-establishment of the Burbanks processing facility, south of Coolgardie, and open pit mining
of the Munda gold deposit within the Widgiemooltha Gold Project. It is a preliminary technical and
economic study of the potential viability of the Project. It is based on low level technical and
economic assessments that are not sufficient to support estimation of ore reserves. Further evaluation
work and appropriate studies are required before Auric will be in a position to estimate any ore
reserves or to provide any assurance of an economic development case.
The Scoping Study is based on the material assumptions outlined in this document. These include
assumptions about the availability of funding. While Auric considers all of the material assumptions to
be based on reasonable grounds, there is no certainty that they will prove to be correct or that the
range of outcomes indicated by the Scoping Study will be achieved.
To achieve the outcomes indicated in this Scoping Study, funding will be required. Investors should
note that there is no certainty that Auric will be able to raise capital when needed. It is also possible
capital may only be available on terms that may be dilutive to or otherwise affect the value of Auric’s
shares. It is also possible that Auric could pursue other ‘value realisation’ strategies such as a sale,
partial sale or joint venture of the Project. If it does, this could materially reduce Auric’s proportionate
ownership of the Project.
Given the uncertainties involved, investors should not make any investment decisions based solely
on the results of the Scoping Study.
The Mineral Resource Estimate underpinning the Scoping Study was prepared by a Competent
Person under JORC 2012 as required under LR 5.16.2.
There is a low level of geological confidence associated with inferred mineral resources and there is
no certainty that further exploration work will result in the determination of indicated mineral
resources or that the production target itself will be realised.
The Scoping Study contains a production target based on approximately 93% Indicated and 7% of
Inferred Mineral Resources in the first 56 months of operation. An Inferred Mineral Resource has a
lower level of confidence than an Ore Reserve or a Measured and Indicated Mineral Resource and
there is no certainty that further exploration work will result in the conversion of the Inferred
mineralisation into an ore reserve or measured or indicated mineral resource or that the production
target itself will be realised.
For full details, including a Competent Person statement, refer to the JORC tables and disclosures
within this announcement.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 2
SUMMARY
• Re-establishment of Burbanks provides a pathway to establishing a standalone integrated gold
producer, initially sourcing mineralised material from the Munda gold deposit.
• Located approximately 87 km from Munda, Burbanks provides Auric with strategic control of
critical processing infrastructure in a region with limited available gold treatment capacity,
positioning the Company to unlock value from Munda while also creating a platform to capture
future organic and inorganic opportunities.
• The quality and profitability of the Munda deposit was recently tested through the mining of a
Starter Pit. A total of ~202,000t of mineralised material at 1.84 g/t Au was mined, of which 126,000t
at 2.46 g/t Au was treated in conventional third-party gold plants. All gold produced was sold at
an average price of A$7,178/oz. The Starter Pit provided detailed information into the geology,
recovery and mining characteristics of the mineralisation, which was used to update the mineral
resource and also to calculate mining factors applied to open pit designs at a gold price of
A$5,500/oz. The overperformance of the Starter Pit also provides confidence in the profitability of
the integrated development of Munda and Burbanks.
• A larger singular open pit at Munda has been considered in the study, providing:
• 2,769,177t of mineralised material at a grade of 1.75g/t Au for 155,844 ounces
• Existing Starter Pit stockpiles at Munda total 76kt @ 0.81g/t Au for 1,980 ounces
• 93.1% of the resource within the designed pit is Indicated with the balance being Inferred
• Recovered ounces of 141,254oz (89.5% recovery, inclusive of existing stockpiles)
• The overall strip ratio of the designed pit is 11:1
• Mining is planned over 32 months using conventional, owner operated equipment
• Burbanks has been redesigned to target a nominal 600,000tpa throughput rate, allowing it to
process all available material from Munda over a period of 56 months. The plant is also designed
to be scalable to 1.2Mtpa through a series of simple upgrades in the future.
• The capital cost estimate for the re-instatement of Burbanks as a 600,000tpa gold processing
facility is $94.3M. This estimate has been completed to PFS-level, accurate to ±15%, by Interquip
Pty Ltd, as an EPCM plant build.
• Owner's capital costs are estimated at $35.8M, to an accuracy level of ±25%. Auric Mining
personnel completed the owners' costs using quotes from multiple suppliers and contractors.
• The capital cost estimate for the establishment of the Munda open pit is estimated at $7.5M, to
a Scoping Study level (±25% accuracy), including upgrades to offices, camp, clearing and topsoil
stockpiling. Recent mining of the Munda Starter Pit and already established infrastructure provide
additional confidence in this cost estimate, even while additional studies are being completed.
• Working capital requirements for the integrated project are estimated at $17.4M, comprising 4
months of mining and haulage to establish sufficient processing stocks ahead of mill start-up,
together with the commissioning and ramp-up of processing at Burbanks. This is partially offset by
gold revenue of approximately $9.3M during the commissioning period.
• The integrated project provides a robust financial outcome. Metrics include (at A$5,750/oz Base):
• Revenue of $812M
• Peak Funding Requirement of $145M
• Payback of 2.3 years
• AISC of $2,843/oz
• EBITDA of $437M
• Sensitivities of the base scenario have been assessed, and the project economics are robust
across a broad range of gold prices and operating and capital cost assumptions.
• The average annualised EBITDA for the initial project is ~$94Mpa, providing strong cash flow and
ample time for Auric to bring additional feed sources online through discovery and/or acquisition.
• This study contemplates only the resource at Munda and does not include the possible benefits
of production from any of Auric's other tenements. Auric owns 521km2 of highly prospective
ground, with exploration activity accelerating. Munda remains open along strike and at depth.
RC drilling has commenced in July 2026, targeting resource extensions.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 3
Auric’s Managing Director Mark English said: “This study is another important step in Auric’s
evolution. It shows a clear pathway to becoming a standalone gold producer, with Munda providing
the initial feed and Burbanks giving us control of a strategically important processing facility in the
Goldfields.
“Just as importantly, this is not simply a single-mine opportunity. Burbanks gives Auric a platform for
continued growth. With strong forecast cash flow, a scalable plant design and 521km2 of prospective
ground, we see a real opportunity to build a much larger gold business over time through exploration
success, resource growth and potential regional consolidation and acquisitions.
“The Starter Pit has given us valuable operating experience and added confidence in Munda. We
now have a strong base from which to progress the next stage of approvals, development and
execution while continuing to grow the pipeline of future feed for Burbanks.”
PHYSICAL and FINANCIAL SUMMARY
The results from the integrated Study demonstrate a robust economic outcome. This paves the way
for Auric to transition into a standalone integrated gold producer. Key metrics include:
Table 1. Physical and financial summary
Mining & Production unit Result
Munda Open Pit
Initial Mining Period years 2.7
Mineralised Material Mined Mt 2.77
Grade Mined g/t Au 1.75
Ounces Mined koz 155
Strip Ratio W:O 11:1
Burbanks Processing
ROM Processed Mt 2.84
Feed Grade g/t Au 1.73
Recovery % 89.5
Gold Produced koz 141
Financials A$/oz 5,250 5,750 6,250
Pre-production Capital A$M (138) (138) (138)
Peak Funding Requirement A$M (147) (145) (145)
Payback years 2.5 2.3 2.1
Total Gross Revenue A$M 742 812 883
Operating Cost - Mining A$M (153) (153) (153)
Operating Cost - Haulage A$M (55) (55) (55)
Operating Cost - Processing A$M (108) (108) (108)
Operating Cost - G&A A$M (38) (38) (38)
Royalty A$M (20) (22) (24)
Sustaining Capital A$M (26) (26) (26)
AISC A$/oz 2,830 2,843 2,857
EBITDA A$M 368 437 506
All material scheduled for processing is sourced from the Munda gold deposit, which has a current
JORC 2012 resource estimate of 4.3Mt @ 1.42g/t Au for 194,000 ounces, of which 84% is classified as
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 4
Indicated. Within the study approximately 93% of material to be processed is classified as Indicated,
with 7% being Inferred resources. Investors are cautioned that there is a low level of geological
confidence in Inferred resources and there is no certainty that further drilling will result in the
determination of Measured or Indicated resources or that a production target will be realised. The
inclusion of Inferred resources is not considered to be a determining factor in the project’s viability
and there is no undue reliance on the Inferred resources in the initial years of the study, as shown
below.
Table 2. Mine production split by resource classification
Quarterly Mine Production by Classification unit Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11
Indicated kt 72 160 174 272 195 154 193 256 591 463 48
Inferred kt 4 0 4 2 0 0 0 0 30 134 15
Total kt 76 161 178 274 196 154 193 256 621 597 63
% Inferred Resource % 4.8 0.2 2.2 0.8 0.1 0.0 0.0 0.1 4.8 22.5 24.3
Figure 1. Mine production split by resource classification
Cautionary Statement
This announcement and the Scoping Study have been prepared in compliance with the JORC Code
(2012) and the ASX Listing Rules Chapter 5, the ASX November 2016 Interim Guidance Note on
“Reporting Scoping Studies” and ASIC Regulatory Guide 170. The forecast financial information
included in the Scoping Study is derived from a 56-month operational period. This information has
been prepared and presented in accordance with the requirements of ASX Listing Rule 5.17. All
material assumptions on which the forecast financial information is based have been made on
reasonable grounds and the material assumptions are set out below. Auric believes that it has a
reasonable basis for providing the forward-looking statements and the forecast financial information.
While Auric considers all the material assumptions to be based on reasonable grounds, there is no
certainty that they will prove to be correct or that the range of outcomes indicated by the Scoping
Study will be achieved.
Margin for Error: The overall Scoping Study has a ±25% level of accuracy, however the design and
costing of the processing facility specifically has been completed to a ±15% level of accuracy.
Modifying Factors: The Scoping Study is based on the material assumptions outlined in the body of
the Study report attached to this announcement. All relevant modifying factors have been assessed
and analysed for ore extraction at Munda using open pit mining methods. The various technical
factors have been studied to a high degree and financial inputs are based on quoted contract
costs/rates and/or direct analogues from the local Goldfields mining area and based on the
experience of senior management and technical consultants.
-
100,000
200,000
300,000
400,000
500,000
600,000
700,000
Q1 Q2 Q3 Q4 Q5 Q6 Q7 Q8 Q9 Q10 Q11
Quarterly Ore Mined (tonnes) by RESCAT
Inferred
Indicated
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 5
Further Work Required: The Study has been undertaken to determine the potential viability of building
a 600kpta processing facility at Burbanks and open pit mining at Munda. Scoping Studies are
preliminary technical and economic assessments of the potential viability of the operation and are
based on low level technical assessments for the mine that are not yet sufficient to support the
estimation of Ore Reserves. Further environmental, geotechnical and hydrological studies may be
required before the estimation of Ore Reserves or to provide any assurance of an economic
development case.
Funding: To achieve the range of outcomes indicated in the Scoping Study, funding of approximately
$145M (being the peak funding requirement) will be required to commence initial production. This
funding is assumed. In addition, approximately $2.2M of pre-development expenditure (approvals,
engineering and early works) is planned before the build phase commences in early 2027, funded
from the Company’s existing cash and not included in the peak funding requirement. Investors
should note that there is no certainty that Auric will be able to generate or raise that amount of
funding when needed. It is also possible that such funding may only be available on terms that may
be dilutive to or otherwise affect the value of Auric Mining’s existing shares. The Company believes
that it is reasonable to assume there will be equity/debt funding available to commence mining and
processing when required, because:
• The Company has a strong current cash balance;
• The board and management have a strong track record of raising equity and debt funding;
• The board and management team have extensive experience in successful mine
development and operations in the resources industry.
• The projects are in a stable regulatory environment, on granted mining leases with established
infrastructure;
• The prevailing spot gold price is strong in Australian dollar terms;
• There is strong investor interest in supporting gold development opportunities;
• The forecast future cash generation is very strong creating a self-funding business; and
• The proposed development has an initial short life span (<5 years) with potential for extension
and is also in an area with significant growth potential, particularly for owners of processing
infrastructure.
Economic Viability: Auric Mining considers the combined operation, subject to the Study, to be
economically viable based on a range of gold prices with a potential AISC of ~A$2,843. The current
spot price is approximately A$5,750/oz, providing significant cash flow margins.
Uncertainty: Given the level of uncertainties involved in a Scoping Study, investors should not make
any investment decision based solely on the results of the Study.
All dollars are Australian dollars unless otherwise stated.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 6
INTEGRATION STUDY for BURBANKS and MUNDA
Introduction
Auric Mining Limited (Auric or the Company) controls a 521km2 tenement package around the
regional city of Kalgoorlie-Boulder, in the Goldfields region of Western Australia. The principal assets
within this portfolio include the Munda gold mine (Munda), 100% owned except for Lithium minerals,
5km west of Widgiemooltha, and the Burbanks processing plant (Burbanks), 9km south of Coolgardie.
The haulage route from Munda to Burbanks is approximately 87km. Munda contains a current JORC
2012 resource estimate of 4.3Mt @ 1.42g/t Au for 194,000 ounces, while Burbanks is currently a non-
operational 180,000tpa CIL gold processing plant.
Auric has completed an integration study that assesses the re-establishment and upgrade of the
Burbanks processing plant to allow mining of a large open pit at Munda.
Figure 2. Munda and Burbanks Location Plan
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 7
Executive Summary
Auric’s Integrated Burbanks and Munda Scoping Study supports a clear pathway for the Company
to transition to a standalone integrated gold producer by mining the Munda gold deposit and re-
establishing the Burbanks processing facility in the Western Australian Goldfields. The strategy gives
Auric control of scarce regional processing capacity, eliminates reliance on third-party mills, and
creates a scalable production platform with potential to support both internal resource growth and
regional consolidation opportunities.
The study is based on open pit mining at Munda, followed by haulage of material approximately
87km to Burbanks for processing through a redesigned 600,000tpa CIL facility. Munda contains a
current JORC 2012 resource estimate of 4.3Mt at 1.42g/t Au for 194,000 ounces, with the study mine
plan incorporating approximately 2.7Mt of mineralised material at 1.75g/t Au for 155,000 mined
ounces. Processing is expected to recover approximately 141,000 ounces over approximately 56
months, with annual gold production of between 25,000 and 40,000 ounces per annum over the first
four years and lower-grade stockpiles processed in year five.
The Munda Starter Pit provided an important de-risking reference point. Approximately 202,000
tonnes at 1.84g/t Au were mined, including 126,000 tonnes at 2.46g/t Au processed through
conventional third-party plants. The campaign generated valuable operating, geological,
metallurgical and reconciliation data. Gold was sold at an average realised price of A$7,178/oz.
These outcomes provide confidence in the planned mining approach, processing assumptions and
resource performance, although the current study remains a Scoping Study and does not support
estimation of Ore Reserves.
Project economics are robust at a range of gold prices, with A$5,750/oz used in the base case. Key
outcomes include life-of-mine revenue of approximately A$812 million, undiscounted pre-tax
operating cash flow of approximately A$437 million, peak funding requirement of approximately
A$145 million, payback of approximately 2.3 years and all-in sustaining costs of approximately
A$2,843/oz. The capital estimate includes approximately A$94.3 million for the Burbanks processing
plant upgrade, A$35.8 million in processing-related owner’s costs, approximately A$7.5 million for
Munda open pit establishment and approximately A$17.4 million in working capital requirements
(further offset by $9.3M of gold sales during commissioning period).
Execution is planned through a staged program of permitting, detailed engineering, procurement,
construction, mining and commissioning. Final approval submissions are targeted during 2026,
Burbanks construction is expected to commence following approvals in early 2027, and first gold is
targeted for early 2028. Mining is forecast to begin ahead of mill commissioning to establish
processing stocks for ramp-up. The processing plant has also been designed with a pathway to
expand to approximately 1.2Mtpa, positioning Burbanks as a strategic regional processing hub.
The principal risks are typical of a Scoping Study and include gold price exposure, resource and
grade variability, metallurgy and recovery, capital and operating cost escalation, labour and
equipment availability, construction delivery, regulatory approvals, water and environmental
approvals, and funding availability. These risks are partly mitigated by the recent Starter Pit operating
history, use of established mining leases and infrastructure, the limited early reliance on Inferred
Resources, consultant input across key technical disciplines, and the strong Australian dollar gold
price environment.
Overall, the integrated Munda and Burbanks development provides Auric a financially attractive
and strategically significant pathway to production, with strong forecast cash flow, scalable
infrastructure and multiple upside pathways. The immediate priorities are to advance approvals,
complete further technical studies, progress financing, commence resource extension, geotechnical
and grade control drilling, refine the mine schedule, and secure long-lead procurement items to
maintain the targeted first-gold schedule.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 8
Study Parameters
JORC 2012 Resources across Auric’s tenements currently total 4.4Mt @ 1.42g/t Au for 200,000 ounces
with 97% contained within the Munda gold deposit. This study is based on a single, staged open pit
at Munda using conventional mining techniques, with haulage to and processing at the upgraded
Burbanks processing facility. The study considers the following:
• Owner operator mining at Munda using quoted equipment hire rates
• EPCM model upgrade of Burbanks to a nominal 600,000tpa
• Quoted haulage rates
• First principles costs build up for open pit and processing using current quotes
• Project implementation managed by Auric
External Consultants
Table 3. Consulting groups who assisted with the Scoping Study
Discipline Area Consultants
Mining
Mine Design Minecomp Pty Ltd
Scheduling Intermine Engineering Consultants
Geotechnical Peter O’Bryan & Associates
Processing
Processing Design Interquip Pty Ltd
Metallurgy JT Metallurgical Services
Tailings Storage Facility Geo Analytica
Power Studies Resources WA / Western Power
Water Studies Rockwater Pty Ltd
Infrastructure
Camp/Accommodation Rapid Camps / Nextgen Building Pty Ltd
Dangerous Goods Ashton Safety Health Environment
Mineral Tenure AMETS Tenements & Geoservices
Environmental
Botanica Consulting
Leanne James Environmental
Hydrogeology/Hydrology Rockwater Pty Ltd
OHS Health/Hygiene Red Ohms Group
Heritage M Watts Legal
Approvals
Botanica Consulting
Leanne James Environmental
Geology and Mineral Resources
JORC 2012 estimated resources across Auric’s tenements currently total 4.4Mt @ 1.42g/t Au for
200,000 ounces with 97% of this within the Munda gold deposit.
The Munda gold deposit is hosted predominantly within basalts (92%) and to a lesser extent in
overlying ultramafic flows (8%). Gold mineralisation, even at very high grades, is quite inconspicuous
in hand specimen, with subtle albite and quartz alteration and only rare sulphide minerals except
where nickel mineralisation is present. The distribution of gold mineralisation is interpreted to be
controlled by the intersection of a south-easterly dipping fault or shear and layering in the basalts
and ultramafics subparallel to the basalt-ultramafic contact.
Table 4. The JORC 2012 Mineral Resource Estimate for the Munda gold deposit:
Deposit
Cut off Category Tonnes Grade Ounces
Au g/t (thousand) g/t Au koz Au
Munda
0.5 g/t
Indicated 3,500 1.45 163
Inferred 700 1.30 29
Stockpiles Indicated 80 0.86 2
0.5 g/t TOTAL 4,280 1.42 194
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 9
The Munda resource is estimated from a Multiple Indicator Kriged (MIK) model provided by Matrix
Resource Consultants Pty Ltd and is quoted at a 0.5g/t cut-off, as described in an announcement
to the ASX on 5 June 2026.
The resource estimate model is a recoverable resource model and as such, no additional allowances
are made for mining dilution and mining loss.
Figure 3. Plan of the Munda area showing geology, pit design and drill hole locations
Figure 4. Cross section through the Munda deposit
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 10
Auric does not hold the lithium rights at Munda. During mining of the Starter Pit, no economic lithium
was observed. Resource drilling suggests there is unlikely to be any economic lithium within the future
open pit. If any economic lithium mineralisation is encountered, it will be separately stockpiled.
Bulk densities were determined by immersion density measurements of diamond core. The density
assigned to oxidised mineralisation, which provides around 0.6% of Mineral Resources is consistent
with experience of similar mineralisation. The bulk densities as incorporated into the resource estimate
model were:
Table 5. Bulk densities used in Mineral Resource model
Regolith Bulk Density
Oxidised 2.20
Transitional 2.50
Fresh - mafic 2.93
Fresh - ultramafic 2.83
A surface water hydrology and groundwater hydrogeological assessment of the site was completed
prior to mining of the Starter Pit which determined that flood-water flows in the vicinity of the Starter
Pit are easily managed and that groundwater flows are restricted by low to very low hydraulic
conductivity.
An update of the assessment is currently underway to determine interaction of the proposed larger
open pit with groundwater flows and of associated infrastructure with flood-water flows.
The Munda gold deposit remains open along strike and at depth and Auric considers there to be
potential for resource growth which may lead to additional open pit opportunities and underground
mining in the future. A large drilling program has commenced in July 2026, targeting resource
extension in addition to acceleration of mining development.
Auric holds 521km2 of highly prospective tenements with large exploration drilling programs
underway providing opportunities for additional resource discovery that may lead to long term
development for processing at Burbanks.
In addition, Auric has the Lindsays Gold Project under contract to purchase. Settlement and
completion is subject to satisfactory resolution of various plaints in the Wardens Court.
Mining – Open Pit
Pit optimisations were completed by Minecomp Pty Ltd utilising Whittle and Surpac optimisation
software and mine planning software. The study is based on the May 2026 recoverable resource
model. The resource model was prepared by a competent person in accordance with the 2012
JORC code and includes estimates classified as Indicated and Inferred.
Mining costs were obtained from a variety of sources including experienced consultants and mining
contractors, current rates from recent mining at Munda and new quotes as appropriate. Processing
costs were built from first principals as described in detail in the Processing section.
Equipment selection is based on conventional truck and excavator open pit mining, utilising a 120-
tonne excavator to mine mineralised areas and a 200-tonne excavator to mine waste, with a fleet
of Caterpillar 777 (~90-tonne capacity) dump trucks and associated ancillary equipment. Following
month fourteen, as the proportion of mineralised zones increase, the 200-tonne excavator will be
replaced by a 120-tonne excavator.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 11
Figure 5. 3D model of the final open pit design (A$5,500/oz)
Pit wall geotechnical parameters are those used for design of the Starter Pit, as determined by Peter
O’Bryan & Associates based on a site-specific geotechnical investigation and experience in similar
environments. Further geotechnical investigation is underway to refine the pit wall parameters which
for the current design are as follows:
Table 6. Geotechnical slope parameters
Northern Walls NS to 365m RL 365-310m RL 310-250m RL
Face Height 10 m 15 m 15-20 m
Berm Width 5 m 6 m 6 m
Batter Angle 55° 65° 65°
Ramp Width 23 m 23 m 15 m
Overall Slope Angle 50°
Southern Walls NS to 360m RL 360-310m RL 310-250m RL
Face Height 10 m 15 m 15-20 m
Berm Width 5 m 6 m 6 m
Batter Angle 55° 60° 65°
Ramp Width 23 m 2 3m 15 m
Overall Slope Angle 26° including ramps
A range of gold price shells were modelled, with the A$5,500/oz shell selected for detailed mine
design purposes and taking a conservative long-term view of the Australian dollar gold price. The
resultant design contains 2.7Mt of mineralised material at a grade of 1.75g/t Au for 155,000oz with a
waste to mineralised material strip ratio of 11:1.
Open pit staging and scheduling was completed by Intermine Engineering Consultants, using Geovia
Minesched software, to optimise processing stocks to Burbanks. The schedule provides a minimum of
~50,000 tonnes of mineralised material per month for haulage and processing at Burbanks. Further
adjustments to the Munda mining schedule are expected after the next round of grade control
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 27 July 2026
Auric Mining Limited (ACN 635 470 843) | ASX:AWJ page | 12
drilling which may lead to further improvements in grade availability and early project economics.
Using the selected equipment, as de