Munda Starter Pit
Final Golden Results
Highlights
• 8,886 ounces produced from Munda Starter Pit, 46% above budget.
• Campaign Two Gold in Circuit (GIC) 411 ounces.
• 126,000 tonnes processed for average head grade of 2.46g/t
(Campaign Two 3.18g/t).
• Average total recovery rate of 89.5% (Campaign Two 88.67%).
• Results confirm Munda as a substantial gold resource.
• Cash, Bullion and Listed Investments total A$43.0M at 18 March 2026.
Management Comment
Managing Director, Mark English, said:
“It’s been a truly stellar finish for us now we have the final Gold in Circuit number.
With production being 46% above budget, puts a golden bow on our Munda Starter
Pit results.
“A total of 8,886 ounces produced from 126,000 tonnes going through in two milling
campaigns at Black Cat’s Lakewood Mill surpassed all our expectations.
“Positive news for us too, with successive outturns outperforming budget estimates
for grade and recovery over the duration of this second campaign running late
January to mid-February.
“Best of all, these outstanding results indicate that Munda hosts a larger, higher
grade gold deposit than previously thought,” said Mr. English.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 19 MARCH 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to provide a final
report on our Munda Gold Mine Starter Pit. Completion of the Gold in Circuit (GIC)
calculation follows the fourth and final gold outturn from the Starter Pit processed at
Black Cat Syndicate Ltd.’s (ASX: BC8) (Black Cat) Lakewood Mill.
The final GIC calculation of 411 ounces completes Campaign Two. Commenced in
late January and running through to 17 February 2026, 68,154 tonnes of ore were
treated at Lakewood Mill.
Adding the final GIC ounces to the prior campaigns brings the overall Starter Pit final
total to 8,886 ounces. This compares to the budgeted 6,100 ounces, a 46% increase
in ounces and a superlative result, outperforming predicted grade and tonnes.
The reconciled average head grade for the Starter Pit came in at 2.46g/t against a
predicted grade of 1.80g/t. Recovery was at 89.5% against a predicted recovery of
83.3%.
Campaign Two processed ore from the bottom half of the Starter Pit, where higher
grades were intercepted, which contributed to the higher 3.18g/t head grade.
The finalised numbers are summarised in the tables below. Cash flowing to Auric
from both campaigns demonstrates the Company’s ability to generate near-term
value for shareholders. The ore treatment arrangement with Black Cat proved a
highly cost-effective pathway to monetise the Munda Starter Pit ore while
positioning Auric for long-term growth.
Details Ounces Produced
BUDGET¹ 6,100
Results for Campaign One² 2,718
First Gold Outturn Campaign Two³ 1,147
Second and Third Gold Outturns Campaign Two⁴ 3,672
Fourth Gold Outturn Campaign Two⁵ 938
Residual gold in circuit (GIC)⁶ 411
FINAL 8,886
¹ (ASX: AWJ) 10 December 2024. Starter Pit Ore Reserve for Munda Gold Deposit.
² (ASX: AWJ) 01 December 2025. Munda Gold Mine Campaign One Results.
³ (ASX: AWJ) 12 February 2026. First 2026 Munda Starter Pit Gold Outturn.
⁴ (ASX: AWJ) 27 February 2026. Outstanding 2026 Gold Outturns and Munda Update.
⁵ (ASX: AWJ) 09 March 2026. Munda Starter Pit Outperforms with Exceptional Results.
⁶ (ASX: AWJ) 19 March 2026. Munda Starter Pit Final Golden Results.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 19 MARCH 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Final Production Metrics Campaign 1 Campaign 2 Total
Dry Tonnes Milled 57,900 68,154 126,054
Reconciled Head Grade g/t 1.61 3.18 2.46
Mill Recovery 90.67% 88.67% 89.50%
Gold Recovered - Ounces 2,718 6,168 8,886
In addition, a further 18,000t of ore from the Starter Pit at an estimated grade of
1.8g/t remains on the ROM pad at Munda. This represents a further estimated 935
ounces after processing. Combined with the 8,886 ounces recovered from the two
processing campaigns, the Starter Pit has provided 61% more ounces above the
Reserve estimate.
Much of the increase in ounces can be attributed to the influence of localised very
high gold grades. These have been difficult to model but are clearly contributing
more to resources than previously estimated. Resources will be remodelled for
Munda. Results and data from the Starter Pit justify further mining and a much larger
pit.
Auric’s total combined value of Cash (ex GST), Bullion and Listed Investments stands
at A$43.0 million as of 18 March 2026.
Work on the Starter Pit has provided invaluable insights into the Munda ore body in
terms of resource estimation, mining techniques and processing. With reconciliation
of gold recovered from the two campaigns now combined with mining and
processing data, the Company has commenced detailed scoping and planning for
the Munda Main Pit.
The Munda Main Pit represents a major opportunity and reinforces Auric’s ambition
to become an integrated, sustainable and significant gold producer.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 19 MARCH 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Forward Looking Statement
This Announcement may contain forward-looking statements which are identified
by words such as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’,
‘expecting’, or ‘intends’ and other similar words that involve risks and uncertainties.
These statements are based on an assessment of present economic and operating
conditions, and on several assumptions regarding future events and actions that, as
at the date of this Announcement, are considered reasonable. Such forward-
looking statements are not a guarantee of future performance and involve known
and unknown risks, uncertainties, assumptions, and other important factors, many of
which are beyond the control of the Company, the Directors, and the
management. The Directors cannot and do not give any assurance that the results,
performance, or achievements expressed or implied by the forward-looking
statements contained in this Announcement will occur and investors are cautioned
not to place undue reliance on these forward-looking statements.
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
T +61 409 372 775
E menglish@auricmining.com.au
Investor Relations
Alex Cowie
Director
NWR Communications
T +61 412 952 610
E alexc@nwrcommunications.com.au
Follow our
communications
Click here to subscribe
to our updates
Share your feedback
Discover