HIGHLIGHTS
JEFFREYS FIND GOLD MINE
•
Stage One mining completed. Sold 9,741 ounces of gold, for $29.28 million
gross revenue.
•
Net surplus cash generated of $9.53 million.
•
Total cash proceeds to Auric $4.77 million being 50% share of surplus
cash.
MUNDA GOLD PROJECT
•
Grade control drilling program commenced on 1 November 2023 and was
completed in early January 2024.
•
A total of 351 Reverse Circulation (RC) holes drilled. Assay results for 244
of these holes received.
•
RC drilling underway testing targets within 1km east of Munda. Grade
control follow-up holes planned based on assays received to date.
CORPORATE
•
Auric finished the year with $4.49 million cash at bank.
•
Auric has sufficient cash to complete all proposed activities in 2024.
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to report on its
activities during the 31 December 2023 Quarter and up to the date of this announcement.
Managing Director, Mark English said: “It was a fantastic and breakout quarter for Auric. With
our JV partner, BML Ventures Pty Ltd, we finished Stage One mining at Jeffreys Find and
banked cash from the sale of gold. We hit a near record gold price on the 31 October 2023
when we sold 1,264 ounces at $3,131/ounce. The total cash Auric banked from our 50% share
of gross cash surplus was $4.77M (ex GST). This cash injection is terrific news for Auric, our
page | 1
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
shareholders, and our future development. Recommencing mining at Jeffreys Find in the first
quarter of 2024 will also be a great step forward.
“We also progressed the development at Munda by undertaking a large 351 hole grade
control/resource definition drilling program starting on 1 November 2023. We acquired Munda
in September 2020 and it’s our main and flagship asset.
“It is our intention to progress the development of Munda throughout 2024 with our key ambition
being to commence mining late in 2024/early 2025. There is still a lot of work to be done, but
it’s an exciting time for the Company. We have the necessary funds to undertake all the pre
mining work we need to without requiring any further equity funding,” said Mr English.
1.0 PRINCIPAL ACTIVITIES
The first stage of open pit mining at Jeffreys Find produced 9,741 ounces of gold from 175,865
dry metric tonnes of ore milled. Auric received $4.77 million being its share of the total surplus
cash proceeds.
The grade control drilling program at Munda Gold Project commenced on 1 November 2023
and was completed in early January 2024. 351 Reverse Circulation (RC) holes were drilled
for 10,895m. Assay results for 244 of these holes have been received as of 19 January 2024.
An RC drill program is underway which will test several drill targets approximately 1km east
of the Munda Gold Project and will then drill 10 further grade control holes at Munda.
2.0 JEFFREYS FIND GOLD MINE
Stage one of Mining at Jeffreys Find has been completed with 175,865 tonnes of ore mined
and processed at the Greenfields Mill in Coolgardie, yielding a total of 9,741 ounces of gold at
a reconciled head grade of 1.86 g/t and a recovery rate of 92.67%.
Stage One – Production and Revenue Statistics
Item
First Campaign
Second Campaign
Total Stage One
Dry Tonnes Milled
36,180
139,685
175,865
Grade g/t Au
1.58
1.93
1.86
Mill Recovery %
93.04
92.58
92.67
Ounces Gold Produced
1,721
8,020
9,741
Average Sale Price
$2,939
$3,021
$3,006
Total Gold Revenue
$5,057,527
$24,227,127
$29,285,024
page | 2
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
Figure 1. Jeffreys Find Mine Site at completion of the stage 1 pit – note Run of Mine ore stockpiles
lower right.
In the first campaign, 36,180 dry tonnes were processed at a reconciled head grade of 1.58g/t
for 1,721 ounces gold and a calculated recovery of 93.04%. The head grade in turn reconciled
well with estimated mine grade for the ore parcel.
The second campaign commenced on 10 September 2023. 139,685 dry tonnes were
processed, yielding a total of 8,021 ounces of gold at a reconciled grade of 1.93 Au g/t and a
recovery rate of 92.58%. Again, the head grade reconciled well with the estimated mine grade
for the campaign.
Auric received $4,766,039 being its 50% share of the surplus cash from Stage One.
Stage One – Financial Details
Item
Funds
Gross gold sales
$29,285,024
Other revenue
$156,564
Total revenue
$29,441,588
Total cash costs
$19,909,511
Net surplus revenue
$9,532,077
50% share to Auric
$4,766,039
Stage Two mining at Jeffreys Find Gold Mine will commence in March 2024.
page | 3
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
3.0 MUNDA GOLD PROJECT
The first phase of grade control drilling at the Munda Gold Project commenced on the 1
November 2023 and was completed in early January 2024. A total of 351 RC holes were drilled
on a 10m x 10m pattern for 10,895m. As of 19 January 2024, assay results for 244 holes have
been received representing approximately 70% of the samples submitted.
Assay results include numerous significant intercepts at a 0.5g/t Au cut-off with high grade or
broad intercepts such as:
MGCR0401
MGCR0057
MGCR0007
MGCR0372
MGCR0035
MGCR0070
MGCR0082
MGCR0084
MGCR0116
MGCR0150
MGCR0280
MGCR0367
MGCR0385
MGCR0392
MGCR0402
16m @ 12.54g/t Au
9m @ 21.37g/t Au, including 1m @ 184.60g/t Au
4m @ 20.13g/t Au, including 1m @ 77.18g/t Au
4m @ 18.84g/t Au, including 1m @ 68.94g/t Au
7m @ 4.03g/t Au
14m @ 2.55g/t Au, including 1m @ 23.2g/t Au
17m @ 1.57g/t Au
12m @ 3.38g/t Au
9m @ 5.40g/t Au
5m @ 4.39g/t Au
9m @ 3.85g/t Au
6m @ 4.64g/t Au, including 1m @ 24.14g/t Au
6m @ 3.42g/t Au
4m @ 6.49g/t Au
11m @ 4.51g/t Au, including 2m @ 18.11g/t Au
The Munda Gold Project is at an early development stage with a recent Scoping Study1 for
open-pit mining and third-party toll treatment returning a Production Target for the Project at
gold prices from AUD$2,400 to AUD$2,800/oz, ranging from approximately:
•
1.67Mt at 2.2g/t producing 112.0koz gold; to
•
2.18Mt at 1.9g/t producing 129.1koz gold.
The drill pattern covered the starter pit defined in the Scoping Study within a larger area of
near surface mineralisation (Figure 2).
1 (ASX: AWJ) 28 June 2023: Positive Scoping Study for Munda Gold Project
page | 4
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
Figure 2. Munda optimised pit outline, starter pit and existing trial pit with completed grade control drill
holes, coloured red where assays received. Selected significant intercepts shown at 0.5g/t cut-off.
Drilling was undertaken by Kalgoorlie-based Total Drilling Services Pty Ltd (TDS). Most holes
were drilled vertically to depths of 30-35m, targeting either the 350m or 345m reduced level
(RL). Angled holes were drilled around the margin of the historic Resolute trial pit together
with some in the trial pit. Shallower vertical holes were drilled in the Resolute trial pit to reach
the same elevations.
The assay results received so far reaffirm the frequent high grades and limited continuity of
gold mineralisation. Geological logging confirms that gold mineralisation is visually very
subtle with a well-developed foliation common but only trace sulphides and often no veining.
The use of close-spaced grade control drilling will be essential to detailed definition and
mining of the deposit.
A resource model will be developed for the volume defined by the grade control drilling once
all results are received. This will lead to a refined model for the deposit and a basis for further
assessment of development options. The drill data will also be used to assess optimal grade
control drill spacing which will be closer spaced than 10m x 10m.
A 7-hole RC drilling program was underway as of 30 January, testing several drill targets
approximately 1km to the east of the Munda gold deposit, within the Munda mining lease,
page | 5
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
M15/87. The drill rig operated by Kalgoorlie-based Kennedy Drilling will then drill 10 grade
control holes at Munda to add drill detail to 2 areas of mineralisation defined by results to
date from the grade control program.
A detailed topographic survey was completed by Spectrum Surveys, covering most of Mining
Lease, M15/87 and a section of the planned haul road within Miscellaneous Licence,
L15/414.
Samples representing a range of potential waste rock types and ore stockpiles have been
submitted for Acid Mine Drainage testwork under the supervision of MBS Environmental.
Metallurgical sampling is ongoing with several ore types well represented in the grade control
drilling, sampled accordingly.
4.0 OTHER EXPLORATION
No other significant exploration was undertaken during the quarter.
5.0 HERITAGE
Auric maintains a good relationship with the two native title claimant groups in the
Widgiemooltha – Norseman area; Ngadju Native Title Claimant Group and Marlinyu Ghoorlie
Native Title Claimant Group.
6.0 SAFETY
There were no alternate duty injuries (“ADI”) and no medically treated injuries (“MTI”) reported
during the December quarter. There were no lost time incidents (“LTI”) recorded during the
December quarter.
7.0 ASX COMPLIANCE
7.1 Compliance Statement
The information in this report that relates to gold production, exploration results, estimates of
Mineral Resources and to the Scoping Study for Munda is extracted from the Company’s
following ASX announcements which are available to view on the Company’s website,
www.auricmining.com.au:
ASX Announcements included in the December 2023 Quarter
Date
Details
25 October 2023
Auric Banks $2.2M Initial Cash from Jeffreys Find
27 October 2023
Grade Control Drilling at Munda Gold Project
1 November 2023
Jeffreys Find Stage One Production Exceeds 9,400 Ounces
14 November 2023
Auric Banks $1.65M, Total Now $3.85M. More Cash Imminent
1 December 2023
Auric Banks another $1.3M, Total Cash now $4.77M
page | 6
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
ASX Announcements included in the December 2023 Quarter
Date
Details
23 January 2024
Mining to Recommence in March 2024 at Jeffreys Find
30 January 2024
Grade Control Drilling Program Completed at Munda Gold Project
ASX Announcements referred to from previous quarters
28 January 2022
Increase in Estimated Resources at Munda and Reclassification
from Inferred to Indicated.
28 June 2023
Positive Scoping Study for Munda Gold Project.
25 August 2023
First Stage Mining and Processing Completed – All Gold Sold.
The Company confirms that it is not aware of any new information or data that materially affects
the information included in the original market announcements and, in the case of estimates of
Mineral Resources and Scoping Study, that all material assumptions and technical parameters
underpinning the estimates and underpinning the Production Target, or the forecast financial
information derived from the Production Target in the relevant market announcements continue
to apply and have not materially changed. The Company confirms that the form and context in
which the Competent Persons’ findings are presented have not been materially modified from
the original market announcements.
7.2 Forward Looking Statements
This Announcement contains forward-looking statements which are identified by words such
as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’, ‘expected’, or ‘intends’ and other
similar words that involve risks and uncertainties. These statements are based on an
assessment of present economic and operating conditions, and on a number of assumptions
regarding future events and actions that, as at the date of this Announcement, are considered
reasonable. Such forward-looking statements are not a guarantee of future performance and
involve known and unknown risks, uncertainties, assumptions and other important factors,
many of which are beyond the control of the Company, the Directors and the management.
The Directors cannot and do not give any assurance that the results, performance or
achievements expressed or implied by the forward-looking statements contained in this
announcement will actually occur and investors are cautioned not to place undue reliance on
these forward-looking statements.
8.0 TENEMENTS
See attached Schedule 1 which lists the mining tenements held at the date of this
announcement, their location and equity ownership.
page | 7
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
8.1 Tenements Applications
One tenement application was lodged up to the date of this report
Tenement
Application Date
P15/6853
13 November 2023
8.2 Granted Tenements
Four tenements were granted up to the date of this report
Tenement
Grant Date
E15/1978
9 November 2023
E15/1979
9 November 2023
E15/1945
19 December 2023
P15/6808
10 January 2024
8.3 Tenements Relinquished
Two tenements were relinquished up to the date of this report
Tenement
Relinquished Date
P15/6786
3 December 2023
E63/2330
15 January 2024
8.4 Farm-in or Farm-out agreements
Auric is not party to any Farm-in or Farm-out agreements.
9.0 RELATED PARTY PAYMENTS
The Company paid salaries, superannuation, annual leave and other employment entitlements
to full time employee Directors of the company of $133,000. The Company also paid $18,000
to Director-related parties of the Company. These costs are included in administration costs
and working capital except when technical staff are working in the field. Those direct costs are
allocated to the tenements and projects and are included at item 2.1(d) of 31 December 2023
Quarter Appendix 5B.
page | 8
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
Figure 3. Auric’s projects in the Widgiemooltha-Norseman area.
page | 9
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
Auric Mining
Auric Mining was established to explore for and develop gold and other mineral deposits in the
Widgiemooltha-Norseman area, of Western Australia.
Auric has tenements covering 282km². Auric holds the rights to gold on all tenements, including
those held in the name of Mt Edwards Critical Metals Pty Ltd. Further, at Munda it holds all
mineral rights except nickel and lithium. For all other tenements, excluding those held in the
name of Mt Edwards Critical Metals Pty Ltd, Auric holds 100% of all mineral rights.
The tenements are separated into four projects (Figure 3):
The Widgiemooltha Gold Project including the Munda Gold Project
The Widgiemooltha Gold Project (“WGP”) located near the town of Widgiemooltha combines
22 tenements, including 5 granted Mining Leases. All tenements are highly prospective for gold
mineralisation. This includes the Munda Gold Project. The combined Inferred and Indicated
Mineral Resource estimate for Munda Gold Project at 0.5g/t cut-off is 4.48Mt @ 1.38g/t Au for
198,700oz gold2.
The Jeffrey Find Project
The Jeffreys Find Project is 50km northeast of Norseman and combines 2 tenements including
1 granted Mining Lease. It includes the Jeffreys Find gold deposit where gold mineralisation
extends from the surface to at least 110m in vertical depth and is thickest near the surface.
The deposit is currently being mined in partnership with BML Ventures Pty Ltd.
The Spargoville Project
The Spargoville Project is located 30km north of Widgiemooltha and combines 8 tenements. It
lies in the same stratigraphy, along strike from the Wattle Dam Gold Mine which produced
268,000oz gold @ 10g/t from 2006-13; one of Australia’s highest-grade mines at that time.
The Chalice West Project
The Chalice West Project is largely underlain by granites but also includes sections of the
Binneringie dolerite dyke. The project is prospective for Rare Earth Elements (REE) and for NiCu and Pt-Pd deposits.
This announcement has been approved for release by the Board.
Corporate Enquiries
Follow our communications
Mark English
Managing Director
Auric Mining Limited
+61 409 372 775
menglish@auricmining.com.au
Subscribe: auricmining.com.au
2 (ASX:AWJ): Announcement 28 January 2022: Increase in Estimated Resources at Munda and Reclassification from Inferred to
Indicated.
page | 10
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Auric Mining Limited (ACN 635 470 843)
SCHEDULE 1
The following table lists the mining tenements held at today’s date and their location.
Tenement
Project
Location
Status
Registered Holder
Mineral Rights
Widgiemooltha
M15/74
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/75
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/698
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/699
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
M15/87
Widgiemooltha
WA
Live
Widgie Gold
100% All Minerals except
Ni, Li
E15/1553
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1576
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1583
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1749
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
E15/1949
Widgiemooltha
WA
Live
Widgie Gold
100% All minerals
E15/1950
Widgiemooltha
WA
Live
Widgie Gold
100% All minerals
E15/2042
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
E15/2043
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
P15/6092
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6362
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6387
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6570
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6612
Widgiemooltha
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6808
Widgiemooltha
WA
Live
Widgie Gold
100% All minerals
P15/6539
Widgiemooltha
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
P15/6853
Widgiemooltha
WA
Pending
Widgie Gold
100% All minerals
L15/414
Widgiemooltha
WA
Live
Widgie Gold
Infrastructure
M63/242
Jeffreys Find
WA
Live
Jeffreys Find
100% All Minerals
L63/97
Jeffreys Find
WA
Live
Jeffreys Find
Infrastructure
M15/1899
Spargoville
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
E15/1688
Spargoville
WA
Live
Spargoville Minerals
100% All Minerals
E15/1689
Spargoville
WA
Live
Spargoville Minerals
100% All Minerals
E15/1665
Spargoville
WA
Pending
Mt Edwards Critical Metals
100% Au Rights
P15/5905
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/5906
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6408
Spargoville
WA
Live
Mt Edwards Critical Metals
100% Au Rights
P15/6758
Spargoville
WA
Pending
Spargoville Minerals
100% All Minerals
Jeffreys Find
Spargoville
page | 11
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 31 January 2024
Tenement
Auric Mining Limited (ACN 635 470 843)
Project
Location
Status
Registered Holder
Mineral Rights
E15/1945
Chalice West
WA
Live
Chalice West
100% All Minerals
E15/1978
Chalice West
WA
Live
Chalice West
100% All Minerals
E15/1979
Chalice West
WA
Live
Chalice West
100% All Minerals
Chalice West
page | 12
+61 8 6155 9046 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
Share your feedback
Discover