Gold Sales in August Total $6.3M. Toll Milling Continues
Released
Released
Announcement PDF
ASX Announcement
auricmining
16 August 2024
ASX: AWJ | ACN 635 470 843
Jeffreys Find Gold Mine.
Total Gold Sales in August Generates $6.3 Million.
Toll Milling of 150,000 Tonnes Continues.
HIGHLIGHTS
•
Second campaign of 2024 produces further cash for Joint Venture.
•
Three parcels of gold sold at average of $3,697 per ounce.
•
Total gross cash generated to date in this campaign is $10.8 Million.
•
Second campaign on target to process 150,000 tonnes.
•
On schedule to process 300,000 tonnes at Greenfields Mill in 2024.
•
First cash of $3.0 Million to be received by Auric within a month.
MANAGEMENT COMMENT
Managing Director, Mark English, said: “Total gross gold sales for 2024 have now
been received by the Joint Venture at just shy of $3,700 an ounce. It’s a very
satisfying result and reflects the surging gold price.
“Over the coming month, Jeffreys Find Gold Mine is expected to generate around
$25.0 Million in gross gold sales as 150,000 tonnes gets processed at the mill.
Everything is right on target.
“Auric will bank cash within the month - $3.0 Million in total, being an initial $2.0 Million
surplus cash distribution from the Joint Venture plus the repayment of $1.0 Million
working capital contribution.
“We are now at the midpoint of mining Jeffreys Find. It will perform much better than
originally anticipated.
page | 1
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 16 August 2024
Auric Mining Limited (ACN 635 470 843)
“The mill contract is to process 300,000 tonnes in 2024. This 150,000 tonnes parcel is
the largest campaign for the year from Jeffreys Find. This leaves a further additional
120,000 tonnes for milling at Greenfields towards the end of 2024.
“On current projections, we will extract in excess of 20,000 ounces of gold this year.
This would be a phenomenal result for Auric,” said Mr English.
Photo: Auric Managing Director Mark English, Company Secretary & Finance Manager
Catherine Yeo and Technical Director John Utley with a gold doré bar. Greenfields Mill on 6
August 2024.
THE ANNOUNCEMENT
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to announce the
second gold milling campaign for 2024 has produced further cash with gold selling
from the Jeffreys Find Gold Mine (the Project) near Norseman, WA, at the Perth Mint
for an average of A$3,697 per ounce.
The Greenfields Mill (Greenfields or Mill) is contracted to process 150,000 tonnes of
ore for the current campaign through Auric’s Joint Venture partner, BML Ventures
Pty Ltd of Kalgoorlie (BML). As of 14 August 2024 nearly 129,000 tonnes have been
delivered to the Mill.
page | 2
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 16 August 2024
Auric Mining Limited (ACN 635 470 843)
Stage Two – Second Gold Processing Campaign
Item
Previous Gold Sales¹ Current Gold Sales
Total Stage 2
Dry Tonnes Milled
30,024
36,5422
66,5662
Head Grade g/t Au
1.44
1.572
1.512
Gold Recovered Ounces
1,256
1,710
2,966
Mill Recovery
90.38%
93.0%2
91.9%2
Average Sale Price
per ounce
$3,549
$3,697
$3,634
Gross Gold
Revenue
$4,457,343
$6,322,313
$10,779,656
Includes rounding errors
¹ Refer ASX Announcement 29 May 2024
² Estimated
The current milling program is taking place across approximately six weeks and will
conclude in early September 2024.
Further gold milling campaigns are scheduled in November/December 2024 at
Greenfields Mill.
BML is planning to mine up to 400,000 tonnes into early 2025. A contract has been
executed for 300,000 tonnes to be processed at Greenfields.
As at today’s date all gross revenue received has been paid or retained by BML for
mining, haulage, milling and related costs.
Auric will receive $3.0 Million from BML within a month, being $2.0 Million in initial
surplus cash distribution from the Joint Venture and $1.0 Million for the repayment of
working capital contribution.
The Joint Venture is between Auric and BML. BML are the miners, operators and
managers of the Jeffreys Find Gold Project. BML incur and pay all mining, haulage,
milling costs and related expenses. After sale of the gold the partners subtract all
direct costs before splitting the surplus cash proceeds on a 50:50 basis. Surplus cash
distributions are paid to Auric by BML after agreement between the partners.
Auric will update the market on a regular basis whilst processing and gold sales are
occurring.
page | 3
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
ASX Announcement 16 August 2024
Auric Mining Limited (ACN 635 470 843)
Photo: Auric Managing Director Mark English, Marketing Manager Wiggy Saunders, Senior
Geologist Nicholas Snow and Technical Director John Utley holding gold doré bars.
Greenfields Mill on 6 August 2024.
FORWARD LOOKING STATEMENTS
This Announcement may contain forward-looking statements which are identified
by words such as ‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’,
‘expecting’, or ‘intends’ and other similar words that involve risks and uncertainties.
These statements are based on an assessment of present economic and operating
conditions, and on a number of assumptions regarding future events and actions
that, as at the date of this Announcement, are considered reasonable. Such
forward-looking statements are not a guarantee of future performance and involve
known and unknown risks, uncertainties, assumptions, and other important factors,
many of which are beyond the control of the Company, the Directors, and the
management. The Directors cannot and do not give any assurance that the results,
performance, or achievements expressed or implied by the forward-looking
statements contained in this Announcement will actually occur and investors are
cautioned not to place undue reliance on these forward-looking statements.
This announcement has been approved for release by the Board.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
+61 409 372 775
menglish@auricmining.com.au
Follow our communications
Subscribe: auricmining.com.au
page | 4
+61 8 9548 9997 | info@auricmining.com.au | Level 1, 1 Tully Road, East Perth, WA 6004 | www.auricmining.com.au
Share your feedback
Discover