ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Clarification Announcement: Munda Gold
Deposit Mineral Resource Increased by 32%
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) refers to its announcement
lodged on ASX dated 25 May 2026 and titled “Munda Gold Deposit Mineral
Resource Increased by 32%” (the “Announcement”).
A proportion of the Indicated Mineral Resources reported in the Announcement is
contained within remaining Starter Pit stockpiles (Table 9). At the request of ASX, the
Company provides the following clarification of the basis of the stockpile resource
estimates for the purposes of Listing Rules 5.8.1 and 5.8.2, and JORC Table 1 Sections
1, 2 and 3.
As a result, the Company has updated the announcement to include the above.
To avoid any potential confusion, the Company attaches the revised
announcement.
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
T +61 409 372 775
E menglish@auricmining.com.au
Investor Relations
Alex Cowie
Director
NWR Communications
T +61 412 952 610
E alexc@nwrcommunications.com.au
Follow our
communications
Click here to subscribe
to our updates
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Clarification Announcement: Munda Gold
Deposit Mineral Resource Increased by 32%
Highlights
• The Munda Gold Deposit in situ Mineral Resource (Indicated and Inferred) has
been re-estimated at 4.20 Mt at 1.43 g/t for 192,000 oz Au.
• The resource after depletion for recent mining represents a 32% increase over
the December 2024 estimate, despite depletion of ~10,000 oz.
• Grade control drilling during mining of the Munda Starter Pit returned numerous
high-grade intercepts, providing further support for the re-estimation, including:
Hole ID Length (m) Au (g/t) Grade x Length
MGCR1022 14 115.67 1,619.38
MGCR0996 10 40.31 403.10
MGCR0998 6 66.44 398.64
MGCR1006 14 14.51 203.14
MGCR0686 9 21.05 189.45
MGCR0950 4 46.88 187.52
• The resource remains open along strike and at depth. Drill planning is underway
for both infill and resource extension.
• The re-estimation incorporates information from mining of the Starter Pit, including
the mill reconciled gold production, which was 46% higher than expected, with
8,886 oz produced versus the budgeted 6,100 oz, and a further ~1,980 oz
stockpiled for future processing.
• Despite increasing the estimated grade, the resource estimate remains
conservative when compared to actual production results.
• Combined with the remaining stockpiles, current Munda resource at 0.5 g/t cut
off are estimated at 4.26 Mt at 1.42 g/t for 194,000 oz Au.
• A Scoping Study is underway assessing the combined development of the
Munda open pit and Burbanks Processing Plant.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Management Comment
Mr. Mark English, Managing Director:
“We are delighted with the increase in the gold resource. Munda continues to
exceed all our expectations. It continues to develop and is now a very sizeable gold
resource and asset.
“The results from the Munda Starter Pit are outstanding. The main purpose of the
initial mining was to test the resource model and increase our understanding of the
gold mineralisation at Munda. Encouragingly, the recovered gold production far
exceeded initial estimates.
“The Starter Pit also enabled us to build our knowledge and experience in our self-
mining capability and generate substantial cash reserves. These cash reserves will
allow us to progress the greater Munda and Burbanks operation and transform the
Company into a fully integrated mining house.
“We are looking forward to additional drilling, which we anticipate will continue to
expand and grow the gold resource.”
The Announcement
Auric Mining Limited (ASX: AWJ) (Auric or the Company) is pleased to announce an
upgrade of the estimated Mineral Resources at Munda and the results of grade
control drilling from the Munda Starter pit.
Mining of the Munda Starter Pit has substantially increased understanding of the
Munda gold deposit and in particular, the contribution of high drill sample grades
to mineable grades. Rare high-grade intercepts within a background of lower
grades are a characteristic of the resource drilling. Grade control drilling at 5 m by
5 m spacing highlighted the short scale variability of high grades such as:
Table 1. Selected high-grade intervals from 5 m by 5 m spaced grade control holes
Hole ID Length (m) Au (g/t) Grade x Length
MGCR1022 14 115.67 1,619.38
MGCR0996 10 40.31 403.10
MGCR0998 6 66.44 398.64
MGCR1006 14 14.51 203.14
MGCR0686 9 21.05 189.45
MGCR0950 4 46.88 187.52
The Starter Pit provided an opportunity to better understand many aspects of the
Munda deposit including the influence of high grades on estimation of resources.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Gold production from Munda Starter Pit exceeded expectations1 leading to
refinement in the estimation of resources.
Matrix Resource Consultants Pty Ltd (“Matrix”) have completed a new estimate of
the in situ Mineral Resources for the Munda gold deposit utilising the same resource
drilling as the previous 2024 block model but reflecting less conservative treatment
of high-grade drill samples and more selective mining.
The gold price has increased substantially since the 2024 estimates. Where those
estimates were constrained to an optimal pit shell generated at a gold price of
AUD$3,200/oz, the current resources have been constrained to an optimal pit shell
generated at AUD$7,000/oz, providing reasonable prospects for eventual
economic extraction.
Mineral Resource estimates at a range of gold cut-off grades are presented in Table
2. These estimates, which are depleted by mining to date exclude stockpiled
material.
For comparison, Table 3 presents the December 2024 Mineral Resources which were
estimated prior to mining of the Starter Pit. The figures in both tables are rounded to
reflect the precision of the estimates and include rounding errors.
Table 2. May 2026 Munda gold deposit in situ Mineral Resource estimates
Au g/t Indicated Inferred Indicated + Inferred
Cut-off MTonnes Au g/t Koz MTonnes Au g/t Koz MTonnes Au g/t Koz
0.20 9.51 0.73 223 3.1 0.5 50 12.6 0.67 273
0.30 6.04 1.00 194 1.6 0.8 41 7.64 0.96 235
0.40 4.48 1.23 177 1.0 1.0 32 5.48 1.19 209
0.50 3.50 1.45 163 0.7 1.3 29 4.20 1.43 192
0.60 2.84 1.67 152 0.5 1.5 24 3.34 1.64 177
0.70 2.38 1.86 142 0.4 1.8 23 2.78 1.85 165
0.80 2.04 2.05 134 0.3 2.0 19 2.34 2.04 154
0.90 1.78 2.22 127 0.3 2.2 21 2.08 2.22 148
1.00 1.58 2.39 121 0.2 2.4 15 1.78 2.39 137
Table 3. December 2024 Munda gold deposit Mineral Resource estimates
Au g/t Indicated Inferred Indicated + Inferred
Cut-off MTonnes Au g/t Koz MTonnes Au g/t Koz MTonnes Au g/t Koz
0.20 7.56 0.72 175 0.5 0.9 14 8.06 0.73 189
0.30 5.51 0.89 158 0.4 1.0 13 5.91 0.90 171
0.40 4.24 1.06 144 0.3 1.2 12 4.54 1.07 156
0.50 3.35 1.22 131 0.3 1.4 14 3.65 1.23 145
0.60 2.71 1.38 120 0.2 1.5 10 2.91 1.39 130
0.80 1.89 1.67 101 0.2 1.9 12 2.09 1.69 114
1.00 1.41 1.94 88 0.1 2.1 7 1.51 1.95 95
1 (ASX: AWJ) 12 December 2024. Clarification Announcement: Munda Gold Deposit Starter Pit Ore Reserve.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Grade Control Production Estimates
Gold mineralisation at Munda is visually indistinct. Accordingly, RC grade control
drilling is a critical step in defining ore blocks and grades for mining.
Auric infill drilled an area, including parts of the Starter Pit using vertical RC holes at
10 m by 10 m spacing (Figure 1). Data from these drill holes were incorporated in the
December 2024 resource estimate and described in detail in the corresponding
announcement to the ASX2.
Grade control drilling on a 5 m by 5 m pattern was undertaken during mining of the
Starter Pit. Grade control drill hole coordinates and significant assays at 0.5 g/t cut-
off are recorded in Appendix A. Some spectacular grades were intersected in the
grade control drilling, including the following holes:
Table 4. High-grade intervals from 5 m by 5 m spaced grade control holes where
grade x intercept length is greater than 100 g x m/t
Hole ID From (m) To (m) Length (m) Au (g/t) Grade x Length
MGCR1022 21 35 14 115.67 1,619.38
MGCR0996 35 45 10 40.31 403.10
MGCR0998 19 25 6 66.44 398.64
MGCR1006 11 25 14 14.51 203.14
MGCR0686 16 25 9 21.05 189.45
MGCR0950 13 17 4 46.88 187.52
MGCR0923 19 22 3 57.12 171.36
MGCR0783 32 35 3 37.19 111.57
MGCR1250 0 8 8 13.17 105.36
MGCR0974 5 11 6 17.52 105.12
2 (ASX: AWJ) 12 December 2024. Clarification Announcement: Munda Gold Deposit Updated Mineral
Resources Precursor to Starter Pit Mining.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Figure 1. Munda Starter Pit and 5 m by 5 m grade control drilling with gold intercepts
>100 g x m/t labelled. Resource drill holes also shown.
Auric sampled RC holes over 1 m intervals via a rig-mounted cyclone and fixed-
cone splitter. The individual samples, typically weighing between 2.5 kg and 3.5 kg
were submitted for assay by 40 g fire assay with an AAS finish to Bureau Veritas
Laboratory in Kalgoorlie.
Ore blocks and associated grades were estimated from grade control results using
MP3 Grade Control © software. Production from the Starter Pit reconciles to 6%
higher grade and 6% more contained ounces than the grade control estimate at
the 0.75 g/t high grade cut-off (Table 5).
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Table 5. Grade Control estimate versus starter pit production at 0.75 g/t cut off*
K (Tonnes) Au (g/t) Au (koz)
Production Milled 126 2.46 10.0
High Grade Stockpile 18 1.47 0.9
Total 144 2.34 10.9
May 2026 Grade Control estimates within mined volume 144 2.21 10.3
Production versus model estimates 0% 6% 6%
*Figures are rounded to reflect the precision of the estimates and include rounding errors.
Information Material to the Estimates of Mineral Resources
There have been numerous phases of exploration and resource drilling at Munda
since the 1960’s. The majority of this work was undertaken by Western Mining
Corporation with subsequent programs by seven different companies including
excavation of a small pit by Resolute Mining in 1999. The most recent drilling was by
Auric with 55 deeper RC holes drilled in 2021-22 followed by 361 shallow infill holes
drilled on a 10 m x 10 m pattern in 2023-24 (Figure 2).
Figure 2. Munda drilling relative to Starter Pit and resource pit crest with resource drill
holes referenced by exploration company and hole type.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Mineral Resources are reported within an optimised pit shell generated by Matrix
from parameters supplied by Auric, including an AUD$7,000/oz gold price. This
approach is appropriate for providing estimates with reasonable prospects for
eventual economic extraction in accordance with JORC 2012 guidelines.
The optimal pit shell (resource pit) extends over around 980 m of strike with a
maximum width of 400 m and reaches a maximum depth of around 200 m.
Cross sectional views of 2 m down-hole composite drill hole gold grades and
estimated panel grades relative to the 2024 resource pit shell and current resource
pit shell are shown in Figures 3, 4 and 5. Each of the panels is scaled by proportion
above 0.50 g/t cut off and coloured by the grade above that cut-off.
Figure 3. Cross section 360390mE.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Figure 4. Cross section 360470mE.
Figure 5. Cross section 360510mE.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Geology and Geological Interpretation
The Munda gold deposit is hosted predominantly within basalts (92%) and to a lesser
extent in overlying ultramafic flows (8%). Gold mineralisation, even at very high
grades is quite inconspicuous in hand specimen, with subtle albite and quartz
alteration and only rare sulphide minerals except where nickel mineralisation is
present. The distribution of gold mineralisation is interpreted to be controlled by the
intersection of a south-easterly dipping fault or shear and layering in the basalts and
ultramafics subparallel to the basalt-ultramafic contact.
Drilling Database
The drilling database informing the estimates comprises information from drilling
completed by previous tenement holders between 1967 and 2024 including
Anaconda, WMC, Resolute, Estrella, Titan, Widgie Nickel and Auric Mining. WMC's
RC and diamond drilling provides the largest proportion of this drilling (Table 6).
Resource drilling tests the currently defined Munda mineralisation over around 940
m of east west strike to around 245 m depth but is particularly sparse below
approximately 230 m depth below natural surface.
Table 6. Resource drill hole database compiled by company and hole type
Group Phase RC Diamond1
Total
Number Metres Number Metres Number Metres
Resource Anaconda 1967-75 - - 41 5,825.3 41 5,825.3
WMC 1995-99 241 21,811.0 57 10,921.2 298 32,732.2
Resolute 1999-
2000
35 1,893.0 2 243.9 37 2,136.9
Eureka 2016 15 1,177.0 - - 15 1,177.0
Estrella 2019 - - 2 321.3 2 321.3
Titan 2005-06 36 4,125.0 26 6,917.8 62 11,042.8
Widgie Nickel
2021-23
16 2,939.0 16 6,001.4 32 8,940.4
Auric 2021-22 55 6,780.0 - - 55 6,780.0
Subtotal 398 38,725.0 144 30,230.9 542 68,955.9
Infill
(Auric 2023-
24)
Central 355 11,156.0 - - 355 11,156.0
Southern 6 145.0 - - 6 145.0
Subtotal 361 11,301.0 - - 361 11,301.0
Subtotal Auric 416 18,081.0 - - 416 18,081.0
Total 759 50,026.0 144 30,230.9 903 80,256.9
1
Widgie Nickel diamond drilling includes RC pre-collars.
From that database, the resource modelling utilised a mineralised domain
interpreted by Matrix which captures two metre down-hole composites from RC and
diamond drilling with gold grades of generally greater than 0.1 g/t. WMC drill holes
contributed around 40% of the dataset informing resources while Titan and Auric drill
holes contributed around 11% and 41% respectively. The estimation dataset is
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
dominated by samples from RC drilling with diamond drilling contributing around
8%.
Details for all drill holes used in the modelling and estimation of resources, including
the higher density drilling, are provided in Appendix A of the 12 December 2024
announcement to the ASX. The details include length weighted significant
intercepts at 0.5 g/t Au cut-off.
Sampling and Sub-sampling Techniques
No details of sampling techniques are available for Anaconda’s diamond drilling or
WMC’s RC drilling. Sampling and assaying of the other significant drilling phases
employed industry standard methods, as follows:
A small proportion of the core drilled by WMC is in storage and accessible. The core
is NQ in diameter, has been sampled over nominally 1m intervals and has been sawn
with mostly half core removed. Sample intervals are generally well marked.
For Resolute’s drilling, RC and diamond core samples were generally collected over
1m down-hole intervals by riffle-splitting, or halving with a diamond saw respectively
and submitted to Kal Assay Laboratory for gold analysis by aqua regia digest with
AAS determination.
For Titan’s drilling, 1 m riffle split RC samples were submitted for analysis as individual
samples or 4 m down-hole composites, and half or quarter core samples were
collected over generally 1m intervals. The samples were assayed by ALS or Genalysis
for gold by fire assay.
Estrella drilled two HQ diameter diamond holes. Holes were sampled over nominal 1
m lengths with half or quarter, generally sawn core submitted for assay.
Auric sampled RC holes at 1 m intervals via a rig-mounted cyclone and fixed-cone
splitter. The individual samples, typically weighing between 2.5 kg and 3.5 kg were
submitted for assay.
Sample Analysis Methods
The assay methodology used by WMC is not recorded. Resolute and Estrella sample
aliquots of 25 g or 50 g were assayed via an aqua regia digest with gold
concentrations determined by AAS or ICP-MS. Titan and Auric utilised a 50 g fire
assay with gold concentrations determined by ICP-OES or ICP-AES.
QA Procedures and QC Data
Prior to Auric’s infill drilling program, approximately half (57%) of the sample intervals
represented in the resource database had no associated qualifying data, that is, no
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
record of QA procedures or QC data. The remainder have at least some associated
QC data; duplicate assaying and/or sample standards.
There is a significant spatial overlap between the data which have qualifying
information and those that do not. Based on analysis of the univariate and spatial
statistical properties of the qualified and unqualified data, it is considered
reasonable to use the combined qualified and unqualified drill hole data to
generate qualified estimates of Mineral Resources.
Resource Modelling
Mineral Resources at Munda were estimated by Multiple Indicator Kriging (“MIK”)
with block support correction to reflect open pit mining selectivity, a method that
has been demonstrated to provide reliable estimates of resources recoverable by
open pit mining for a wide range of mineralisation styles.
There has been no additional resource drilling in the Munda area since 2024 and the
block model informing the current Mineral Resources represents an update of the
2024 model, with comparatively less conservative treatment of high-grade drill
sample grades and reflecting more selective mining. These revisions are supported
by results of the starter pit mining.
The estimates are based on 2 m down-hole composited gold assay grades from RC
and diamond drilling by Auric and previous tenement holders, including 10 m by 10
m infill drilling undertaken by Auric. Mineral Resources are primarily informed by
information from RC drilling with diamond drilling providing around 7% of mineralised
domain composites within the pit shell constraining Mineral Resources.
Micromine software was used for data compilation, domain wire framing and
coding of composite values and GS3M software was used for resource estimation.
The resulting estimates were imported into Micromine for pit optimisation and
resource reporting. The estimation methodology is appropriate for the mineralisation
style.
The MIK modelling utilised a northerly dipping mineralised domain capturing
composites with gold grades of greater than 0.1 g/t which extends over around 940
m of strike with an average horizontal width of around 120 m. Wire-framed surfaces
representing the base of oxidation and top of fresh rock and contact between
ultramafic and mafic rocks interpreted by Auric geologists from drill hole logging
were used for density assignment. Within the mineralised area, the base of complete
oxidation averages around 4 m depth with fresh rock occurring at an average
depth of around 16 m.
Grade continuity was characterised by indicator variograms modelled at 14
indicator thresholds. The modelled variograms are consistent with geological
interpretations and trends shown by composite gold grades. For estimation, search
ellipsoids and variograms were aligned with local mineralisation trends defined by
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
three zones of consistent orientation. Class grades used for MIK modelling were
derived from class mean grades by oxidation zone. The approach adopted for
selection of upper grades differs from the 2024 modelling, for which mineralised
domain upper bin grades were selected from the bin median for the oxide zone
and bin mean excluding small number of outlier composites for the transitional and
fresh zones.
Bulk densities of 2.20 and 2.50 t/bcm were assigned to oxidised and transitional zones
respectively, with densities of 2.93 and 2.83 t/bcm allocated to fresh mafic and
ultramafic respectively. The densities assigned to transitional and fresh material
reflect immersion density measurements of diamond core. The density assigned to
oxidised mineralisation, which provides around 0.6% of Mineral Resources is
consistent with Matrix’s experience of similar mineralisation.
The estimates include a variance adjustment to give estimates of recoverable
resources above gold cut-off grades for open pit mining selectivity of around 3 m
by 2 m by 2.5 m with ore definition from 5 m by 5 m spaced grade control sampling.
This differs from the 2024 modelling, for which variance adjustments factors were
based on mining selectivity of around 5m by 5 m by 2.5 m, representing smallest
mining units around 2.8 times larger than used for the current modelling.
In Matrix’s experience, the Mineral Resource estimates can be reasonably expected
to provide appropriately reliable estimates of potential mining outcomes at the
assumed selectivity without application of additional mining dilution or mining
recovery factors.
Mineral Resource Classification
Estimates for mineralisation tested by drilling spaced at around 20 m and closer are
classified as Indicated. Estimates for more broadly sampled mineralisation,
extrapolated up to generally around 30 m from general drilling areas are classified
as Inferred.
To provide estimates with reasonable prospects of eventual economic extraction,
Mineral Resources are reported within an optimal pit shell generated at a gold price
of $AUD7,000/oz which extends over around 900 m of strike to a maximum depth of
around 200 m, which is around 50 m deeper than the $3,200/oz pit constraining the
2024 Mineral Resources.
Production reconciliation
Table 7 compares estimates from the current block model at 0.75 g/t cut-off within
the as-mined starter pit volume with production estimates at this cut-off. It
demonstrates that for the mined volume, production estimates total marginally
lower tonnages and slightly higher gold grades for around 8% more contained gold
relative to the 2026 model estimates.
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
With consideration to the style of mineralisation, and volume of the starter pit, Auric
consider the reconciliation between the model estimates and production as
supporting the general reliability of model estimates.
Table 7. Model estimates versus starter pit production at 0.75 g/t cut off*
K (Tonnes) Au (g/t) Au (koz)
Production Milled 126 2.46 10.0
High Grade Stockpile 18 1.47 0.9
Total 144 2.34 10.9
May 2026 Model estimates within mined volume 153 2.05 10.1
Production versus model estimates -6% 14% 8%
*Figures are rounded to reflect the precision of the estimates and include rounding errors.
Cut-off Grades
Gold mineralisation at Munda is widely disseminated with higher-grade pockets
within a broad halo of lower grade mineralisation. This style is appropriate to
potential development via open pit mining. Higher grade lodes at the base of a
future pit may be assessed at higher cut-off grades for potential underground
development.
Mining and Metallurgical Factors
Wire-framed surfaces representing the base of oxidation and top of fresh rock were
developed utilising the resource drill holes where appropriate data was available
and validated using the 10 m by 10 m infill drill holes. These surfaces were used in the
subdivision of the data into oxidised, transitional and fresh rock subdomains for the
current estimate of resources. The oxidation profile exposed in the Starter Pit is
consistent with the wire-framed surfaces.
Metallurgical recovery factors of 88% for oxide and transitional material and 80% for
fresh, averaging 83% were utilised in the pre-feasibility study for the Starter Pit,
reflecting conventional CIL processing. These factors were determined on the basis
of test-work that excluded earlier test-work showing higher recovery in fresh rock.
Ore from the Starter Pit was processed in two campaigns; in the first campaign
57,900 tonnes of predominantly oxide and transitional material was processed,
achieving an average recovery of 90.7%. In the second campaign, 68,154 tonnes
of predominantly fresh material was processed, achieving an average recovery of
88.7% for an overall average of 89.5%
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Comparison with previous model estimates
Table 8 compares the current estimates with the December 2024 Mineral Resources
at 0.50 g/t cut off. Figure 6 provides the relative contributions of block model
revisions, updated gold price and mining depletion to the differences in combined
estimates of contained metal at 0.5 g/t cut-off, on a contained metal basis.
Table 8. May 2026 versus December 2024 Resource estimates at 0.50 g/t cut off
Indicated Inferred Indicated + Inferred
MTonnes Au g/t Koz MTonnes Au g/t Koz MTonnes Au g/t Koz
Dec ‘24 3.35 1.22 131 0.3 1.4 14 3.65 1.23 145
May ‘26 3.50 1.45 163 0.7 1.3 29 4.20 1.43 192
Difference 4% 19% 24% 133% -7% 107% 15% 15% 32%
*Figures are rounded to reflect the precision of the estimates and may include rounding errors.
Figure 6. Contributions to resource changes at 0.50 g/t cut off.
145
41
18
-11
192
-50
0
50
100
150
200
ecem er 2024
stimates
Model changes
at 3 200 o
Gold price
ncrease
Mining depltion Ma 2026
stimates
ko
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 5 JUNE 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Remaining stockpiles
Table 9 shows combined Mineral Resources for Munda project inclusive of in situ
resources within a $7,000/oz pit shell constrained below the current as-mined surface
and estimates for remaining Starter Pit stockpiles derived from grade control
estimates. The figures in this table are rounded to reflect the precision of the
estimates.
Table 9. May 2026 Munda gold deposit in situ and stockpiled Mineral Resource
estimates at 0.50 g/t cutoff*
Category K (Tonnes) Au (g/t) Au (koz)
In situ Resources within $7,000/oz shell Indicated 3,500 1.45 163
Inferred 700 1.30 29
Stockpiles Low Grade Indicated 58 0.61 1
High Grade Indicated 18 1.47 0.9
Combined Project Indicated 3,576 1.44 165
Inferred 700 1.30 29
Total 4,276 1.41 194
*Figures are rounded to reflect the precision of the estimates and include rounding errors.
Stockpile resources are estimated based on 5 m x 5 m RC grade control drilling of
the in-situ deposit as part of the mining process (Figure 7). Details for all of the drill
holes used in the estimation of resources are provided in Appendix A. The details
include significant intercepts at a 0.5 g/t cut-off.
The RC grade control holes were sampled at 1m intervals via a rig-mounted cyclone
and fixed-cone splitter. The individual samples, typically weighing between 2.5kg
and 3.5kg were submitted for assay to a Bureau Veritas laboratory in Kalgoorlie.
Individual samples were analysed using a 40 g fire assay and gold concentrations
determined by AAS.
Sample duplicates and standards were submitted with every 30th sample for an
overall ratio of 1 in 15 QC checks.
Micromine software was used for data compilation and MP3 conditional simulation
software was used for resource estimation. The resulting estimates were imported
into Micromine for reporting.
The grade estimation uses an octant search including data within an ellipse th