Major Drilling Programs Commenced at Munda
Released
Released
Announcement PDF
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 28 JULY 2026
Auric Mining Limited
ACN 635 470 843
Level 1, 1 Tully Road, East Perth WA 6004
PO Box 1057, Joondalup DC WA 6919
info@auricmining.com.au
08 9548 9997
auricmining.com.au
ASX: AWJ
Major Drilling Programs Commenced
at Munda
Highlights
• A major RC drilling program has commenced at the Munda Gold Mine (“Munda”),
focused on infill and resource extension that has the potential to add ounces to the
recently released Scoping Study outlining an open pit development targeting to mine
2.7Mt at 1.75g/t Au for 155koz.
• The Munda Resource remains open along strike and at depth. Initial drilling will target
the potential western extension of the orebody, along strike of results that include1:
• 13m @ 14.62g/t Au from 60m (AMRC012),
• 5m @ 3.46g/t Au from 87m (AMRC005), and
• 4m @ 3.34g/t Au from 46m (AMRC050).
• The extensional RC program, comprising 135 holes for ~12,900 meters, will test for gold
mineralisation to a depth of 120 metres along strike of the existing Munda Resource.
• This follows the successful mining of the Munda Starter Pit, where grade control drilling
returned numerous high-grade intercepts, leading to the outperformance and
supporting a 32% increase in the resource to 192,000 ounces2.
• The first stage of grade control drilling targeting the upper benches of the Scoping Study
pit design is also planned. This program of up to ~89,000 metres, is expected to
commence in August 2026.
• Additionally, geotechnical diamond drilling has commenced. This drilling will be used
to refine pit design parameters and will be a key factor for Ore Reserve estimation that
will be undertaken during the second half of 2026.
Mr Mark English, Managing Director, said:
“The outstanding production from the Munda Starter Pit provides confidence to
aggressively pursue this major resource and grade control program prior to the
recommencement of mining in 2027. After the recent 32% increase of the Munda gold
resource, we look forward to this next drilling program which we anticipate will continue to
expand the substantial resource, that has already been shown through our recent Scoping
Study to provide significant cash flow to Auric.”
“All of this drilling is a key part of the plan to rapidly progress the greater Munda and
Burbanks operations as we transform the Company into a fully integrated mining house
when mining at Munda recommences in late 2027.”
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 28 JULY 2026
ASX: AWJ Page | 2
Munda Drilling Underway
Auric Mining, (ASX:AWJ, “Auric” or the “Company”) is pleased to announce regulatory
approval for the commencement of drilling at our Munda Gold Mine.
A resource development drilling program targeting a potential western extension of the
Munda Resource has commenced. This program follows on from the successful mining
campaign of the Munda Starter Pit in February 2026, the subsequent increase of the in-situ
Mineral Resource released in June 2026 and the robust Scoping Study results released in July
2026. The Munda pit design currently contains 2.7Mt of mineralised material at 1.75g/t Au.
The initial RC drilling program will be completed by Drill Safe Services Pty Ltd and comprises
135 holes for 12,900 metres. This drilling will test for gold mineralisation to a depth of 120
metres within the mafic volcanics which host the bulk of the Munda Resource where
proximal to the ultramafic contact.
A geotechnical diamond drilling program to provide information to refine pit wall design
parameters is scheduled to start the week beginning 27 July 2026. Four HQ3 to NQ3 holes
will be drilled by Westralian Diamond Drillers Pty Ltd. This drilling will provide geotechnical
data that will be incorporated into a geotechnical model building on the knowledge from
the Starter Pit to refine the mine design for the next phase of mining Munda. This drilling is
part of the workstream required for the definition of an Ore Reserve estimate, which is
planned during the second half of 2026.
The approvals also allow for the first stage of grade control drilling for the Munda pit. This
drilling will provide geological and grade information down to a 5m x 5m spacing.
Approximately 89,000 metres are planned which will reduce grade uncertainty and
maximise planning and mining efficiency. The grade control drilling is intended to begin in
August 2026.
Figure 1: Drilling at Munda - 22 July 2026
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 28 JULY 2026
ASX: AWJ Page | 3
This announcement has been approved for release by the Board of Auric Mining Ltd.
Corporate Enquiries
Mark English
Managing Director
Auric Mining Limited
T +61 409 372 775
E menglish@auricmining.com.au
Gareth Solly
CEO and Executive Director
Auric Mining Limited
T +61 8 9548 9997
E gsolly@auricmining.com.au
Follow our
communications
Click here to subscribe
to our updates
CONNECT WITH AURIC MINING ON INVESTORHUB:
Scan the QR code or visit:
https://investorhub.auricmining.com.au/auth/signup
Email: info@auricmmining.com.au
Figure 2: Plan view of designed drilling at Munda
ANNOUNCEMENT TO THE AUSTRALIAN SECURITIES EXCHANGE 28 JULY 2026
ASX: AWJ Page | 4
Appendix A – JORC 2012 GOLD RESOURCE TABLE – AURIC MINING (100% Owned)
Deposit
Cut off Category Tonnes Grade Ounces
Au g/t (thousand) g/t Au koz Au
Munda Resource
0.5 g/t
Indicated 3,500 1.45 163
Inferred 700 1.30 29
Stockpiles Indicated 80 0.86 2
0.5 g/t Subtotal 4,280 1.42 194
Jeffreys Find Resource
In situ
Resources
0.50 g/t
cut off
Indicated 9.8 2.1 0.7
Inferred 74.7 1.8 4.3
Subtotal 84.5 1.8 5
Combined Resource
Indicated 3,590 1.44 166
Inferred 775 1.32 33
Total 4,365 1.42 199
Table note: Rounding errors are apparent.
The following announcements containing the Table 1 Checklists of Assessment and Reporting Criteria relating to JORC 2012 compliant Resources
are available on the Company’s website (www.auricmining,com.au):
• Munda – Auric Mining ASX announcement on 5 June 2026 “Munda Resource Increased 32%”
• Jeffreys Find – Auric Mining ASX announcement on 30 April 2026 “2025 Annual Report”
COMPETENT PERSONS STATEMENTS
The information in this announcement that relates to geology, exploration results and planning was
compiled by Mr Mathew Graham-Ellison, who is a full-time employee of Auric Mining Limited. Mr
Graham-Ellison is a Competent Person and a member of the Australian Institute of Mining and
Metallurgy (AusIMM). Mr Graham-Ellison has sufficient experience that is relevant to the style of
mineralisation and type of deposit under consideration and to the activity being undertaken to
qualify as a Competent Person as defined in the 2012 Edition of the ‘Australasian Code for Reporting
of Exploration Results, Mineral Resources and Ore Reserves’. Mr Graham-Ellison consents to the
inclusion in the report of the matters based on his information in the form and context in which it
appears.
Where the Company refers to exploration results and Mineral Resources, in this report (referencing
previous releases made to the ASX), it confirms that it is not aware of any new information or data
that materially affects the information included in those announcements and in the case of
estimates of Mineral Resources, that all material assumptions and technical parameters underpinning
the Mineral Resource estimates in the relevant market announcements continue to apply and have
not materially changed. The Company confirms that the form and context in which the Competent
Person’s findings are presented have not been materially modified from the original market
announcements.
1 Refer to ASX announcements 9/4/2021 and 26/10/2021
2 Refer to ASX announcement 5/6/2026
FORWARD LOOKING STATEMENTS
This Announcement may contain forward-looking statements which are identified by words such as
‘may’, ‘could’, ‘should’, ‘believes’, ‘estimates’, ‘targets’, ‘expecting’, or ‘intends’ and other similar
words that involve risks and uncertainties. These statements are based on an assessment of present
economic and operating conditions, and on a number of assumptions regarding future events and
actions that, as at the date of this Announcement, are considered reasonable. Such forward-looking
statements are not a guarantee of future performance and involve known and unknown risks,
uncertainties, assumptions, and other important factors, many of which are beyond the control of
the Company, the Directors, and the management. The Directors cannot and do not give any
assurance that the results, performance, or achievements expressed or implied by the forward-
looking statements contained in this Announcement will actually occur and investors are cautioned
not to place undue reliance on these forward-looking statements.
Share your feedback
Discover